Project Long Mott Docs - FW Courtesy Copy Request for Additional Information for Proposed Long Mott Generating Station CP Application (Docket Number 50-0614)
ML26035A416
Person / Time
Site: 05000614
Issue date: 11/06/2025
From:
NRC
To:
References
Download: ML26035A416 (0)


Text

From:

Joe OHara Sent:

Thursday, November 6, 2025 5:18 PM To:

Milton Gorden; ext_Mark_Feltner Cc:

ext_Dave_Goodman; ext_Hayley_McClendon; Stephanie Yazzie; ext_Jared_Wicker; Maher, William

Subject:

FW: Courtesy Copy: REQUEST FOR ADDITIONAL INFORMATION FOR PROPOSED LONG MOTT GENERATING STATION CP APPLICATION (DOCKET NUMBER: 50-0614)

Attachments:

Formal Letter LME Requesting RAI's.docx.pdf

  • *
  • FYI Only * *
  • Joe OHara Environmental Project Manager U.S. Nuclear Regulatory Commission Environmental Review Project Management Branch From: U.S. Nuclear Regulatory Commission (NRC)

Sent: Thursday, November 6, 2025 5:12 PM To: Robert Hoffman ; Mary Campestrin ; Adam Glazer ; Adrian Muniz ; Sarah Lopas ; Joe OHara ; Richard Rivera

Subject:

[External_Sender] Courtesy Copy: REQUEST FOR ADDITIONAL INFORMATION FOR PROPOSED LONG MOTT GENERATING STATION CP APPLICATION (DOCKET NUMBER: 50-0614)

This is a courtesy copy of an email bulletin sent by Joe O'Hara.

This bulletin was sent to the following groups of people:

Subscribers of Long Mott Generating Station (LMGS) (570 recipients)

See (Agencywide Documents Access and Management System (ADAMS) Accession No. ML25307A005.

Formal Letter LME Requesting RAI's.docx(ML25307A005)

Copy attached.

Formal Letter LME Requesting RAI's.docx.pdf Update your subscriptions, modify your password or e-mail address, or stop subscriptions at any time on your Subscriber Preferences Page. You will need to use your e-mail address to log in. If you have questions or problems with the subscription service, please contact subscriberhelp.govdelivery.com.

This service is provided to you at no charge by U.S. Nuclear Regulatory Commission (NRC).

Stay Connected to the NRC!

Hearing Identifier:

XeDOW_ProjectLongMott_EnvPublic Email Number:

42 Mail Envelope Properties (DM8PR09MB64871EAA0B5A0DEC21CF84F3EEC2A)

Subject:

FW Courtesy Copy REQUEST FOR ADDITIONAL INFORMATION FOR PROPOSED LONG MOTT GENERATING STATION CP APPLICATION (DOCKET NUMBER 50-0614)

Sent Date:

11/6/2025 5:17:52 PM Received Date:

11/6/2025 5:17:00 PM From:

Joe OHara Created By:

Joe.OHara@nrc.gov Recipients:

"ext_Dave_Goodman" <>

Tracking Status: None "ext_Hayley_McClendon" <>

Tracking Status: None "Stephanie Yazzie" <syazzie@x-energy.com>

Tracking Status: None "ext_Jared_Wicker" <>

Tracking Status: None "Maher, William" <william.maher@fpl.com>

Tracking Status: None "Milton Gorden" <mgorden@x-energy.com>

Tracking Status: None "ext_Mark_Feltner" <>

Tracking Status: None Post Office:

DM8PR09MB6487.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4430 11/6/2025 5:17:00 PM Formal Letter LME Requesting RAI's.docx.pdf 158109 image001.png 839 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Mark Feltner, Technology Principal Nuclear Power The Dow Chemical Company 530 Gaither Road Rockville, MD 20850

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR LONG MOTT GENERATING STATION CP APPLICATION (DOCKET NUMBER: 50-0614)

Dear Mr. Feltner:

By letter dated March 31, 2025 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML25090A057), Long Mott Energy, LLC. (LME), submitted an environmental report (ER) (ADAMS ML25090A063) in support of a construction permit (CP) application. The staff is preparing an environmental assessment (EA) to evaluate the environmental impacts from the proposed action. On May 12, 2025, the U.S. Nuclear Regulatory Commission (NRC) staff sent LME a letter accepting the Long Mott Generating Station CP application for detailed review (ADAMS ML25115A247). A notice of the acceptance for docketing was published in the Federal Register on May 2, 2025 (90 FR 18874).

As part of the NRCs environmental review, the staff is conducting an environmental regulatory audit. The audit is being conducted during the environmental review with the intent to gain understanding, verify information, and to identify information required to support the basis of the licensing or regulatory decisions necessary for issuance of a CP, in accordance with the environmental regulatory audit plan issued August 28, 2025 (ADAMS ML25240B607).

During the environmental site audit, the NRC reviewed documents that were made available on the applicants electronic information portal in response to the NRC information needs. The NRC discussed information needs for each resource area with LME personnel to gather information that will likely be used in the EA, as well as identify the potential need for requests for additional information (RAIs), and/or requests for confirmatory information (RCIs) to address unresolved issues. With letters dated October 17th (ADAMS Package Accession No. ML25290A123) and October 24, 2025, (ML25297A164), LME submitted supplemental information to the ER. As requested by LME, the NRC staff has developed the three RAIs detailed in Enclosure to further the timely development of the EA. The NRC requests that LME submit the information described in these RAIs within 30 days of the date of this letter.

November 6, 2025

M. Feltner 2

If you have any questions regarding this matter, please contact Joe OHara via email at Joe.OHara@nrc.gov or Bob Hoffman via email at Robert.Hoffman@nrc.gov.

Sincerely, Daniel Barnhurst, Chief Environmental Project Management Branch 3 Office of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket No. 50-0614

Enclosure:

As Stated cc: Gov Delivery Signed by Barnhurst, Daniel on 11/06/25

Enclosure REGULATORY BASIS Long Mott Energy submitted an Environmental Report (ER), ML25090A063, as part of its CP application in accordance with 10CFR Part51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions. The Nuclear Regulatory Commissions (NRC) regulations at 10 CFR Part 51, which implement Section 102(2) of the National Environmental Policy Act (NEPA) of 1969, include requirements for applicants to provide information as may be useful in aiding the NRC staff in complying with NEPA, and other federal consultation obligations such as Section 106 of the NHPA and Section 7 of the Endangered Species Act and the Clean Air Act (CAA).

REQUIREMENT: 10 CFR 51.45(c) requires that the ER includes a description of the affected environment, contains sufficient data to aid the Commission in its development of an independent analysis, and an analysis that considers and balances the environmental effects of the proposed action. Per NRC Regulatory Guide 4.2, this should include:

An evaluation of the radiological consequences to the environment from potential accidents at the proposed site. The description of the design-basis accidents considered should include site-specific data and realistic meteorology (i.e., 50th percentile atmospheric dispersion) based on accident release assumptions described in the PSAR/FSAR.

A discussion of greenhouse gases and estimates of yearly emissions associated with building the plant.

A description of impacts to the land resulting from generation, handling and disposal of nonradioactive waste during building of the project. The description should include a general description of onsite waste expected to be generated, including types and approximate quantities.

2 REQUESTS FOR ADDITIONAL INFORMATION Long Mott Generating Station Environmental Review Docket No. 50-614 EPID L-2025-LNE-0000 The following requests for additional information identify information needed by the U.S. Nuclear Regulatory Commission (NRC) staff to complete its environmental review of the submittals necessary to review the construction permit application for the Long Mott Generating Station (LMGS).

Postulated Accidents:

ACC-5 Please provide an updated Table 5.13.1-12 that is consistent with PSAR Table 3.2-5 providing both the safety dose, air dispersion conversion factor, and environmental dose. Please indicate if the calculated environmental dose is on a per module or total module basis for each DBA sequence.

Air Quality and Meteorology:

AQ-4 Please provide 1) the estimated air emissions for criteria pollutants and greenhouse gases generated during LMGS construction from the various sources identified in ER Section 4.4.5.3, or 2) some mechanism to supplement the ER information and determine the total LMGS construction emissions, or 3) bounding estimates, with an appropriate basis, for LMGS construction emissions.

Waste - Non-Radiological:

WRN-1 Please provide an estimate of the quantities of non-hazardous waste that will be generated during the construction of the LMGS.



  1. 

'



  1. "&$% #%  #  %%#%$%% !!!%  %

%

&#  



6<-4+-8 

$%#&% 

 *8*$$$$%$!

  1. 6..4*5$$#$##

*850;89:$$#$##

)144-84*5$$

$*<6=$$

>-33 #!

-8:> #!$'$

$*4$:-70-59 

;51>65>*3->##&&#

    1. 1<-8*##&&#

-;0*;9-5###!



$,,-991656 :8   



$$$$%$! $$#$

!

$$#$## $$#$##



 *8*

'*32-8$41:0

  1. 6..4*5

*850;89:

%

6<  

6<  

6<  

6< 

# # !(