WESTINGHOUSE NON-PROPRIETARY CLASS 3 Westinghouse Electric Company LLC Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins, South Carolina 29061-9121 USA

© 2026 Westinghouse Electric Company LLC All Rights Reserved Director, Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, Maryland 20852-2738 Direct tel: 803-647-3193 E-mail: Stephen Subosits@westinghouse.com Your ref:

Our ref: LTR-RAC-26-08 January 29, 2026

SUBJECT:

WESTINGHOUSE 10CFR70.72 FACILITY CHANGE REPORT FOR 2025 Westinghouse Electric Company LLC (Westinghouse) hereby submits the report of Columbia Fuel Fabrication Facility (CFFF) changes that did not require prior U.S. Nuclear Regulatory Commission (NRC) approval in accordance with 10CFR70.72. This report addresses those changes completed within calendar year 2025. Westinghouse did not complete any facility changes that required prior NRC approval during the above time period.

Westinghouse uses an integrated safety review approach for all modifications of, or additions to, existing structures, systems and components at the CFFF. This process is described in and conducted in accordance with the requirements of CFFF Regulatory Procedure RA-104, "Regulatory Review of Configuration Change Authorization." This integrated review is conducted by the various regulatory disciplines, including Nuclear Criticality Safety, Radiation Safety, Environmental Protection, Safeguards, Fire Safety, Chemical/Industrial Safety and other applicable Health and Safety experts when necessary. A key aspect of this review is a determination that the change is not prohibited by 10CFR70, a SNM-1107 license condition, or a governing order. The reviewers also determine whether NRC pre-approval and SNM-1107 license amendment changes are required prior to implementation.

Specific guidance is provided to ensure that prior NRC approval is obtained for changes that:

Create new types of accident sequences that, unless mitigated or prevented, would exceed the performance requirements of 10CFR70.61 and that have not previously been described in the Integrated Safety Analysis (ISA) Summary; Use new processes, technologies or control systems for which the licensee has no prior experience; Remove, without at least an equivalent replacement of the safety function, an Items Relied On For Safety (IROFS) that is listed in the ISA Summary and is necessary for compliance with the performance requirements of 10CFR70.61; or Alter any IROFS listed in the ISA Summary, that is the sole item preventing or mitigating an accident sequence that exceeds the performance requirements of 10CFR70.6l.

Each of the Configuration Control Forms (CCF) identified in the enclosure to this correspondence were evaluated in accordance with the RA-104 procedure, and a determination was made that prior NRC approval of the respective change was not required. This determination was documented on each change authorization form by the appropriate regulatory engineering review functions. For all of these changes,

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Page 2 of 2

© 2026 Westinghouse Electric Company LLC All Rights Reserved the regulatory engineering review function checked the "No" box on the form for "Does the proposed change require NRC approval?"

If you have any questions regarding this information, please contact me at (803) 647-3193.

Sincerely, Stephen G. Subosits Manager, Regulatory Affairs Westinghouse Columbia Fuel Fabrication Facility Docket 70-1151, License SNM -1107

Enclosure:

Westinghouse CFFF 2025 Facility Change Report (38 pages)

Cc:

NRC. Mr. Thomas Vukovinsky NRC. Ms. Diana Woodyatt NRC. Mr. Robert Mathis Signature:

Email:

Stephen Subosits (Jan 29, 2026 13:44:18 EST)

Stephen Subosits stephen.subosits@westinghouse.com

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure

© 2026 Westinghouse Electric Company LLC All Rights Reserved Enclosure Westinghouse CFFF 2025 Facility Change Report (38 pages)

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure Westinghouse CFFF 2025 Facility Change Report CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup 19344 Decommission and Removal of MCC 1101 and Emergency Section of MCC 1100 CCF to decommission and remove Motor Control Center (MCC) 1101. CCF will be performed in 2 Phases: Phase 1 - MCC 1100 Demolition, and Works Phase 2 - MCC 1101 Demolition Works.

New MCCs to take the place of MCC 1101 and the emergency section of MCC 1100.

URRS Outdoor Area; Ammonia Distillation Building Grounds No No All 19349 Demolition and Associated Equipment CCF to remove ductwork and associated equipment. Phase 1 - Decommission Exhaust Fan FN-38U, Filter House FL-38U, Associated Equipment; Phase 2 - Decommission Fan FN-38T, Filter House FL-38V; Phase 3 - Decommission FN-06 Duct; Phase 4 - Decommission AC 38; Phase 5 - Decommission AC 41.

Remove Ductwork and Equipment. CCF associated with CAPAL 100420659.

MAP Roof ISA 01 Plant Ventilation System No No All 21141 Re-organize Core Component Area CCF to re-organize Core Component area to improve 5S and remove potential safety hazards.

Re-organize Core Component area to improve 5S and remove potential safety hazards.

Core Component and obsolete BWR Storage Area ISA 20 ERBIA No No All 21277 ERBIA Duct Sample Ports Installation CCF to cut holes for probe installations on exhaust stack of FL-9166 & FL-9405. Phase 1 - FL-9166 exhaust stack; Phase 2 - FL-9405 exhaust stack.

Modify test ports for improved sampling.

ERBIA Roof Platform ISA 01 Plant Ventilation System Yes No All Phase 1 - 2025 Phase 2 - 2024 21288 ADU Sample Ports Installation CCF to modify exhaust stack of CALC COMB Gas LN 1. Phase 1 - CALC COMB Gas LN 1 Exhaust stack; Phase 2 - CALC COMB Gas LN 3 Exhaust stack.

Modify exhaust stacks to improve sampling.

Conversion Roof ISA 03 ADU Conversion No No All 21291 ADU Sample Ports Installation CCF to modify exhaust stacks FL-969 & FL-970.

Phase 1 - FL-969 CONV Area Containment System 4C exhaust stack; Phase 2 - FL-970 CONV Area Containment System 4D exhaust stack.

Modify exhaust stacks to improve sampling.

Conversion Roof ISA 03 ADU Conversion Yes No All Phase 1 - 2024 Phase 2 - 2025 21310 Conversion Sample Port Installation CCF to modify exhaust stack on PLN6 Grinder EF-39A.

Modify exhaust stack to improve sampling.

Conversion Roof Platform ISA 01 Plant Ventilation System Yes No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-22036 ADOPT -

Candle Filters CCF to install candle filters FL-754A/B to meet increased filtration needs on process flow path between V-754B and V-756.

Phase 1 - Removal of nitric acid piping; Phase 2 -

Release of P-754B Discharge, DI Water, S-2A/2B, S-958; Phase 3 - Release of Candle Filters.

Additional filtration is needed to help process scrap from ADOPT fuel.

SOLX ISA 04 Safe Geometry Dissolver System Yes Yes Phase 1 - 2024 Phase 2 - 2025 CCF-D-22038 Pellet Furnaces Flow Meter Replacement CCF to replace obsolete (unavailable) flow meter for a direct replacement. Phase 1 - Furnace 1B; Phase 2 - Furnace 1C; Phase 3 - Furnace 2A; Phase 4 - Furnace 2B; Phase 5 - Furnace 2C; Phase 9 -

Furnace 5B. (Phases 6-8 N/A)

Flow meter is obsolete.

Pellet Area Furnaces ISA 08 ADU Pelleting System Summary No No All CCF-D-22083 Pellet Press Upgrade CCF to upgrade Pellet Press Column Programmable Logic Controllers. PLC Phase 1 -

Mount Control Cabinet; Phase 2 - Replace AutoPrep PLC; Phase 3 - Replace Stack Up PLC; Phase 4 - Replace Pellet Press PLC; Phase 5 -

Replace Boat Loader PLC. (CCF was originally CCF 21-095)

PLC Hardware is obsolete, and needs upgrading.

Pellet Column Line 1 ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System No No All Phase 1, 2, 3 -

2023 Phase 4, 5 -

2025 CCF-D-22084 Pellet Press Upgrade CCF to upgrade Pellet Press Column PLCs. Phase 1 - Mount Control Cabinet; Phase 2 - Replace AutoPrep PLC; Phase 3 - Replace Stack Up PLC; Phase 4 - Pellet Press PLC HMI installation and CPU migration to new processor; Phase 5 -

Replace Boat Loader PLC; Phase 6 - Relocate air valves and regulator; Phase 7 - Install Interposing Relay for Granulator Contactor; Phase 8 - Remove Boat Loader to Press hardwired communication.

(CCF was originally CCF 21-095)

PLC Hardware is obsolete, and needs upgrading.

Pellet Column Line 2 ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System No No All Phase 1 - 2023 Phase 2, 3, 5, 6, 7 - 2024 Phase 4, 8 -

2025 CCF-D-22085 Pellet Press Upgrade CCF to upgrade Pellet Press Column PLCs. Phase 1 - Mount Control Cabinet; Phase 2 - Replace AutoPrep PLC; Phase 3 - Replace Stack Up PLC; Phase 4 - Removed; Phase 5 - Replace Boat Loader PLC. (Originally CCF 21-097)

PLC Hardware is obsolete, and needs upgrading.

Pellet Column Line 3 ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System No No All Phase 1 - 2023 Phase 2, 3 -

2024 Phase 5 - 2025

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-22126 ADOPT Pellet Line 5 CCF to upgrade the existing Pellet Line 5 Addback feed system used for ADU and ADOPT fuel production. Phase 1 - Modification of the Addback System - Approval for Testing with Uranium; Phase 2 - Release Addback System to Production.

Modifications support the ADOPT fuel pellet process. Removal of obsolete equipment while sealing off unused sections to reduce SNM exposure.

Pelleting Line 5 Addback ISA 08 ADU Pelleting System, ISA 08 ADU Pelleting System Summary Yes No All Phase 1 & 2 -

2024 Phase 3 - 2025 CCF-D-22144 Deer-Stand and ERBIA Bulk Container Modifications CCF to allow product received in an ERBIA Bulk Container (EBC) vs the ADU bulk container.

Second Phase of the CCF will be for the modification on EBC's to interface with the currently installed alignment pins to allow feeders/hopper interface.

The ADOPT fuel pellet process will utilize the EBCs to transfer blended powder to the pelleting line rather than the current ADU bulk containers.

Deer-Stand Pelleting Line 5 ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System Yes No All Phase 1 thru 11 -

2024 Phase 12 thru 15

- 2025 CCF-D-22192 Silo Ladder Redesign -

T-1117 CCF to revise ladder design to comply with updated standards.

New ladder design is needed to comply with updated standards.

Outside of Ammonia Still

  1. 1 & Still #2 ISA 06 Chemical Receipt and Storage, ISA 15 Wastewater Treatment System No No All CCF-D-22205 Rod Weigh Inlet Conveyor Drive Upgrade CCF to Add/Replace the current Rod Weigh inlet conveyor drive with a multiple drive / roller system, one set for each side. (ISA 10, CSE - 10B, SSC ADUROD-127).

Upgrading drive improves and expands human factors on mechanical side of plant.

Mechanical Side, Rod

Weigh, Transportation ISA 10 ADU Fuel Rod Area Yes No All Phase 1 - 2024 Phase 2 - 2025 CCF-D-22221 Obsolete S1030 Hatch CCF to identify a compatible replacement hatch.

Inspection ports will be added to the starboard material blank to accommodate S-1030 transition inspection. Phase 1 - Hatch 1; Phase 2 - Hatch 2; Phase 3 - Hatch 3.

The hatch used on the S-1030 Transition is obsolete.

Transition S-1030 on Roof ISA 01 Plant Ventilation, ISA 01 Plant Ventilation System Summary No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-22257 URRS Ultrasonic Cleaning Drain Pump CCF to decommission unused pump P-984 and replace it with an air diaphragm pump at the same location.

Project will allow for improved draining the URRS Ultrasonic Cleaning Tanks.

Near the SW Decon Room ISA 13 Low Level Radioactive Waste System, ISA 13 Low Level Radioactive Waste System Summary No No All CCF-D-23004 Pellet Press R-53 Rebuild Line 5 CCF to update R53 Press controls as follow:

Electrical/Controls; New Overhead LED Lighting Mechanical; Modify worm shaft and ancillary components; Turret replacement; New Pneumatic actuators; Modify Vacuum Boat Conveyor Enclosure Assembly; Modify Hopper Assembly; Modify Roll Hood Design; Modify Champs Computer Table; Remove the 5th Cam on the new pneumatic hold-down cam.

Obsolescence, Continuous Improvement, Maintenance Reliability, Replacement of worn components.

Pellet Line 5, between Calciner Line 5 and sintering furnace 5B ISA 08 ADU Pelleting System Summary Yes No All CCF-D-23013 Boatloader Controls Upgrade - Line 4 CCF to change Line 4 Boatloader controls from GE PLC to an Allen Bradley remote rack. In addition, upgrade indexer motor and valve rack to match Lines 1-3. This is part of the Front-End Pelleting Upgrade project.

PLC Hardware is obsolete and needs to be upgraded to improve communications capabilities.

Line 4 Pellet Column ISA 08 ADU Pelleting System No No All CCF-D-23014 Boatloader Controls Upgrade - Line 5 CCF to change Line 5 Boatloader controls from GE PLC to an Allen Bradley remote rack. In addition, upgrade indexer motor and valve rack to match lines 1-3. This is part of the Front-End Pelleting Upgrade project.

PLC Hardware is obsolete and needs to be upgraded to improve communications capabilities.

Line 5 Pellet Column ISA 08 ADU Pelleting System No No All CCF-D-23022 Additional Lights and Receptacles on Laser A CCF to add illumination to work area. Phase 1:

Add Additional Lights and receptacles on Laser A; Phase 2: Add the bench lights and receptacles back to Laser A area.

Increase lighting in Lasar A work area.

Laser A ISA CFFF Site and Structures No No All Phase 1 - 2024 Phase 2 - 2025

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-23091 ADOPT Mods Deer-Stand Line 1

CCF for modification of Deer-Stand Line 1 to accept ADU bulk container and the EBC's used in the ADOPT process. Phase 1 - perform the modification and operational test; Phase 2 - will test operation with EBCs and confirm the CSE.

For production of ADOPT fuel.

Line 1 Deer-Stand ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System Yes Yes All Phase 1 thru 4 -

2024 Phase 5 - 2025 CCF-D-23093 ADOPT Add-back Feed System for ADU line 1 CCF to replace the Addback U3O8 feed system on Pellet Line 1 for both ADU and ADOPT pelleting production. Phase 1 - Modification of the Addback Feed System; Phase 2 - Release Addback Feed System to Production; Phase 3 - Modification of Glovebox Stand; Phase 4 - Modification to correct vibration and ventilation on PLN1 Addback Feeding System; Phase 5 - Modification of ductwork on DAP 38510.

Production of ADOPT Fuel.

Line 1 Pellet Stand ISA 08 ADU Pelleting System, ISA 01 Plant Ventilation Yes No All Phase 1 thru 4 -

2024 Phase 5 - 2025 CCF-D-23114 Tank T-1140 Modification for pH Control CCF to control pH levels at T-1140 using caustic material at the recirculation line at T-1140.

Adding pH controls at T-1140 will allow precise dosage to the affected volume in the tank.

Outside URR -

Waste Treatment ISA 06 Chemical Receipt and Storage Summary, ISA 06 Chemical Receipt and Storage No No All CCF-D-23130 Ammonia Chiller Replacement CH-1159 (Mech/Elect Scope)

CCF to replace the 100-ton chiller with a like-for-like replacement. System piping, supports, electrical, instrumentation, and foundation will be replaced or repaired as needed for a successful chiller installation. Project split into two CCFs, CCF-D-24055 contains the civil scope (linked in related documents tab).

Update chiller that can handle ammonium hydroxide and replace rental chiller now in service.

Outside -

Conversion Services ISA 03 ADU Conversion System Summary, ISA 03 ADU Conversion System Yes Yes All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-23131 Installation of Oil Pump and Emergency Power Source CCF to install an electrical line to the ERP for the fuel transfer pump for the diesel P-3D. Install a new fuel pump to replace existing pump.

The diesel fuel transfer pump should be fed from emergency power since it will be needed during power outage.

Fuel Oil Storage in Tank Farm ISA 06 Chemical Receipt and Storage No No All Phase 1 - 2024 Phase 2 - 2025 CCF-D-23138 Verizon Network Upgrade CCF to upgrade the existing Verizon network at the CFFF while also expanding the current coverage at the site.

Site improvement that also upgrades Verizon telecommunications at the site.

Entire Site ISA CFFF Site and Structures No No All CCF-D-23143 Installation of Accelerometers for Periodic Monitoring of AC-11 CCF to install accelerometers and a related termination box at AC-11 for Preventive Maintenance (PM) testing of vibration.

Provide connections for preventative maintenance.

Bulk Blending Air Conditioning Unit AC-11 ISA 01 Plant Ventilation, ISA 01 Plant Ventilation System Summary No No All CCF-D-23155 Powder Collection System for UO2 Screw Conveyor FE-9221 CCF to fabricate and install equipment to reduce contamination from airborne material when cleaning the UO2 Screw Conveyor (FE-9221),

UO2 Feed Hopper (V-9221) and removing the screw in the UO2 Screw Conveyor.

Support maintenance and operations with a new design to assist cleanout efforts with a new design to reduce airborne material during maintenance /

surveillance.

2nd Floor of Pellet Expansion Area ISA 20 ERBIA System Summary, ISA 01 Plant Ventilation System Summary Yes No All CCF-D-23195 Replacement of Fire Alarm System CPUs CCF to replace five Simplex Fire Alarm System CPUs. Nodes 1,4,5,6 and 8 will be updated with new CPUs. Nodes 2 and 3 were previously updated under CCF #21052.

Update alarm notes to exchange obsolete CPUs with new CPUs.

Plant Offices and Manufacturing Areas ISA CFFF Site and Structures Yes No All CCF-D-23204 Update Bulk Container Feeder Valve Guideposts CCF to modify the bulk container to assist with guiding its associated feeder valve into place. CCF also will install guideposts for the feeder valve.

Modification is related to Action 2 of IR-2023-10680 to improvements to self-alignment of feeder valves to bulk containers.

Bulk Blending Room ISA 05 ADU Bulk Blending System Summary, ISA 05 ADU Bulk Blending System No No Phase 1, 5, 6, 14, 17, 49 -

2024 Phase 2-4, 7-16, 18-27, 29-30, 32-43, 45 2025

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-23205 ERBIA and IFBA Cooling Towers Control Loops CCF to install control loops for ERBIA and IFBA chillers. Controllers and sensors will be added to existing equipment to operate the previously disconnected control valves on the cooling tower bypass lines.

Adding control valves allows for adjusting system temperatures when ambient temperature drops.

ERBIA and IFBA ISA CFFF Site and Structures No No All CCF-D-23207 Route City Water Supply CCF to route city water supply to West I and West II Lagoon above ground.

Connect city water line above grade.

West I and West II Lagoons ISA CFFF Site and Structures No No All CCF-D-23213 Remove Spools from Exhaust of S-231 and S-431 CCF to remove Sampling Spool piece from Exhaust of S-231 and S-431 to facilitate Clean Air performing testing on effluents of slab tanks S-231 and S-431.

Components are no longer needed. Remove location where powder can accumulate.

Conversion ADU Lines 2 and 4 ISA 03 ADU Conversion System Summary, ISA 03 ADU Conversion System No No All Phase 1 - 2025 Phase 2 - 2024 CCF-D-24015 Sensors Installed to Monitor pH The pH and temperature transmitters are currently monitored in administrative rounds. CCF will incorporate the pH and temperature transmitters reading into the SIS (Safety system) for continuous monitoring.

CAP IR-2023-8348.

Conversion Area Q-tanks ISA 03 ADU Conversion System Yes No All CCF-D-24055 Replacement of Ammonia Chiller CH-1159 (outside)

CCF to perform civil work needed to relocate replacement chiller (Trane CH-1159) outside. CCF to include prep-foundation work, dike installation above the existing concrete in the area and sump/drain hole location, chiller support steel, and pipe support concrete in the immediate area, prior to the mechanical /electrical work needed for the chiller itself (reference CCF-D-23130).

Perform civil work in preparation of chiller installation covered in ref.

CCF.

Near DI water tank T-1365 ISA CFFF Site and Structures Yes No All CCF-D-24057 Alternate Eductors for Slab Tanks CCF to add alternate Eductors (Schutte &

Koerting) as an acceptable alternate on recirculation lines 1-5.

Adding eductor alternative will allow for increased options and availability.

Slab tanks in conversion ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary Yes No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24080 Drain Valves for V-12 Filters updated CCF to replace valves that actuate with a 1/4 turn ball valve with a spring return ball valve. Each ADU line will constitute a phase for this project.

Reduce potential for spills at FL-x12 bag filters.

Conversion Lines 1 through 5

ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary Yes No All CCF-D-24085 Replace Windows in Office Area and Entry Hallway CCF to replace office building windows on the first and second floor for energy efficiency. Project will include the demolition of the existing frames and glass.

The project is expected to result in energy savings.

Renovated first and second floor offices, entrance hallway and the cafeteria ISA CFFF Site and Structures No No All CCF-D-24086 Replacement of IFBA Condenser Pump P-7127 A, B, C CCF will cover the replacement of obsolete Integrated Fuel Burnable Absorber (IFBA) condenser pumps used in IFBA, Pumps P-7127 A, B, C. Replacement pumps will be considered a substitution and therefore can take place as needed.

Current models Goulds 3405 are obsolete, and parts are no longer available.

IFBA ISA 12 IFBA Fuel Rod Manufacturing System, ISA 12 IFBA Fuel Rod Manufacturing System Summary, ISA 14 IFBA Processing Summary, ISA 14 IFBA Processing No No All CCF-D-24090 Controlled Access Area (CAA) Lighting Demolition and Relocation for LEU+ Site Preparation CCF will demo and/or relocate the light poles and flood lights to allow site preparation to begin for the LEU+ facility. The CCF will be executed in the following three phases: Phase 1 - Electrical Scope -

Disconnect all wiring from Electrical Panel DP-OT1; Phase 2 - Mechanical Scope - Demolition of all required light poles and re-installation of four light poles; Phase 3 - Electrical Scope - work will remove the feeder wire to DP-OT1.

The light poles, flood lights, electrical panel, transformer and disconnect need to be relocated and/or demolished to allow site preparation to begin for the LEU+ facility.

LEU+ Facility Site Preparation ISA CFFF Site and Structures No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24092 Site-prep for LEU+ and Modification of Natural Gas Supply CCF will relocate the existing natural gas supply piping to allow for the LEU+ facility site preparation. The piping will also be modified for tie-in service for LEU+ facility supply.

The natural gas supply piping has to be relocated to allow for the LEU+

facility site preparation.

Plant Grounds ISA CFFF Site and Structures No No All CCF-D-24095 CFFF Water Sample Well Abandonment for LEU+

CCF will abandon Water Sample Wells in preparation of site development of the LEU+

Facility. The wells will be filled and capped by a Well Contractor and then abandoned in place.

Water Sample Well Abandonment for LEU+

Facility Site Preparation.

Sample Wells W85 and W86 ISA CFFF Site and Structures No No Phase 1 CCF-D-24097 Main Office Sanitary Sewer Line Relocation CCF will relocate the existing Main Office sanitary sewer lines to allow for site preparation for the LEU+ facility.

The existing sanitary sewer lines need to be relocated to allow site preparation for the LEU+

facility.

Main Office Sanitary Sewer Line Relocation ISA CFFF Site and Structures, ISA CFFF Site and Structures No No All CCF-D-24115 Conversion Decon Room VH-1430 Duct Disconnect and Seal from DC-1427 CCF to disconnect and seal Conversion Decon Room VH-1430 Duct from decommissioned DC-1427 dust collector duct located in the Conversion storage room. Duct to be sealed with blind flange.

To prevent acid fumes from the DECON room from flowing into the Conversion storage area.

Conversion Storage Room ISA 01 Plant Ventilation System Summary No No All CCF-D-24118 Pellet Stop Guards CCF to install pellet stop guards on Line 5 like the guards on Pellet Line 1.

Modification to help prevent pellets coming off the track at the exit. These guards will also help prevent fingers or cloth from being caught.

Pellet Line 5, Grinder Conveyer Exit ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24121 Upgrade of Buckets CCF to modify Stainless-Steel buckets (Part

  1. 15034) by coating them with PTFE to increase durability with 49% HF and nitric acid.

Extend life of metal buckets and to prevent potential safety issues due to holes caused by corrosion.

Conversion ISA 16 Storage of Uranium Bearing Materials, ISA 03 ADU Conversion System, ISA 04 Safet Geometry Dissolver System Yes No All CCF-D-24125 F&I Electrical Shop North Roll Up Door Change to Manual Pull CCF to remove electrical motor from the north side roll up door of the F&I Electrical Shop. Install a manual chain hoist to operate roll up door.

Removing obsolete broken motor. Changing to manual door pull saves on cost.

F&I Electrical Shop ISA CFFF Site and Structures No No All CCF-D-24127 Add Tensile Tester to Met Lab CCF to add Tensile Tester to Met Lab DFM-100-DF, Does not impact any SSCs or CSEs.

Updating existing Tensile Tester with secondary provides redundancy with added capability.

Mechanical Test Room in Met Lab ISA 18 Laboratories Systems Summary, ISA 18 Laboratories Systems No No All CCF-D-24128 Decanters Weep Hole Slotting of Clamshell CCF to change the 3 weep holes in the decanter clamshell at the feed end to a slot to allow for better drainage of centrate back into the clam shell.

This project will be completed in 5 phases. Phase 1 Decanter Line 1; Phase 2 Decanter Line 2; Phase 3 Decanter Line 3; Phase 4 Decanter Line 4; Phase 5 Decanter Line 5.

Changing the weep holes into a slot will allow for better and longer lasting drainage between cleanings to prevent liquid from being retained in this area and will lead to less bearing failures.

Conversion -

Decanters 1, 2, 3, 4, 5 ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary No No All Phase 1, 3, 4, 5 -

2024 Phase 2 - 2025

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24130 CCF to replace two obsolete Moyno pumps located in URRS waterglass.

CCF to replace two URRS obsolete Cake Slurry Moyno pumps P-1164A and P-1164B. 2 phase CCF.

URRS outside waterglass facility has two obsolete Moyno pumps, P-1164A and P-1164B.

URRS Waterglass ISA 15 Wastewater Treatment System, ISA 15 Wastewater Treatment System Summary No No All CCF-D-24136 Install Manual Hand Valves for P-1493A&B CCF will install manual hand valves to provide adequate LOTO for P-1493A and P-1493B. Phase 1 P-1493A; Phase 2 P-1493B.

Modification required for proper LOTO for the new V-1493E/F tanks.

SOLX ISA 07 URRS Solvent Extraction System, ISA 07 URRS Solvent Extraction System Summary Yes No All CCF-D-24137 New Process Water Line for URRS Waterglass CCF will install a new Process Water line to support and resolve water pressure issues in the URRS Waterglass building. Phase 1 Pipe Installation Startup; Phase 2 Heat Trace Installation Startup; Phase 3 Complete Demo of Old Piping.

To improve water pressure for URRS waterglass processes.

Outside URRS Waterglass ISA CFFF Site and Structures No No All Phase 1 - 2024 Phase 2, 3 -

2025 CCF-D-24138 MCP-108139 City and Process Water Piping Criteria CCF to approve an addition of substitution criteria for MCP-108139.

Adding criteria to MCP-108139 will allow maintenance to upgrade city or process water piping without additional CCFs.

Plant Wide ISA 15 Wastewater Treatment System Summary, ISA 15 Wastewater Treatment System, ISA CFFF Site and Structures No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24151 Install Engraver CCF to install new Engraver to replace the existing Fadal vertical mill (engraver). Phase 1 - Install Okuma GENOS M560V; Phase 2 - Move and install associated equipment; Phase 3 - Testing Phase; Phase 4 - Extend barrier wall.

New engraver is needed.

Removal of the out-of-date engraver will save space and is not used due to frequent breakdowns and hard to obtain parts.

Outside the ECG Room ISA CFFF Site and Structures No No All CCF-D-24152 Bulk Blending Inflatable Seal CCF to install new custom seal for bulk blending and the bulk container feed systems in pelleting and pelleting expansion.

The obsolete inflatable seal for the Fitzmill in bulk blending has failed.

Bulk Blending Fitzmill ISA 05 ADU Bulk Blending System, ISA 05 ADU Bulk Blending System Summary, ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System, ISA 20 ERBIA System, ISA 20 ERBIA System Summary Yes No All Phase 1 - 2024 Phase 2 - 2025 CCF-D-24156 A/B Bank Vacuum Exhaust CCF for Thermal Stability Ovens A/B to add an exhaust bag filter to the vacuum pump to catch oil mist in case of pump running too long and overflowing.

A pump has overflowed and spilled oil on the floor and the rods below.

Behind Ovens ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24157 Provide Nitric Acid Piping to Decanters CCF to provide Nitric Acid Piping to Decanters To facilitate cleaning of tanks V-x20 and V-x19, Project will be accomplished in 10 phases.

Securing the pans to the platform addresses CAP IR-2024-6031.

Reduce potential for injury from contact with nitric acid.

ADU Lines 1, 2, 3, 4, and 5 ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary, ISA 16 Storage of Uranium Bearing Materials Summary, ISA 16 Storage of Uranium Bearing Materials Yes No Phase 1 - 2025 Phase 6 thru 10 -

2024 CCF-D-24161 Installation of Remote Greasing Capability on ADU Dryers 1-5 CCF to add remote greasing capability to all 5 ADU Dryers so they can be greased with the dryers rotating. Project will be completed in 5 phases.

Phase 1 Hot Oil Dryer Line 1; Phase 2 Hot Oil Dryer Line 2; Phase 3 Hot Oil Dryer Line 3; Phase 4 Hot Oil Dryer Line 4; Phase 5 Hot Oil Dryer Line 5.

Modification will allow the dryer bearings to be safely lubricated while the equipment is in operation.

Hot Oil Dryers Line 1-5, Conversion ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary No No All CCF-D-24163 Installation of Grid Weld Fixture Expander Stations CCF to install previously procured fixture spreaders at laser welders 3, 5 and 6.

Manual disassembly of the weld fixtures can cause damage to the grids.

Grid Welding ISA CFFF Site and Structures No No All CCF-D-24164 Scrap Cage S-1030 Tank Frame North Side 3in x 3in Beam Modification &

Concrete Repair CCF to repair and modify Scrap Cage Tank Frame.

Phase 1 - Temporarily relocate P-1057 transfer pump south side of frame; Phase 2 - Repair concrete; Phase 3 - Repair and modify beam bottom section with new beam; Phase 4 - Relocate P-1057 transfer pump back to permanent location.

Scrap Cage Tank Frame beam base plate and bottom section is deteriorated reducing support capacity.

Conversion Scrap Cage ISA 11 Scrap Uranium Processing System Summary Yes No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24165 Inspection Table Lift modification CCF to raise the basic height of the inspection table by 4" to bring it into line with the majority of the other tables at CFFF.

Change is for ergonomic purposes only.

Mechanical, Inspection ISA CFFF Site and Structures No No All CCF-D-24169 Provide Air Gap in City Water Line Supplying the UF6 Cylinder Washer CCF to provide Air Gap in City Water line Supplying the UF6 Cylinder Washer.

Eliminating the possibility of moderator entering the trailer will reduce or eliminate the CSE for the system.

Cylinder Surface Cleaning Station, outside main building ISA 09 URRS Cylinder Wash System, ISA 09 URRS Cylinder Wash System Summary Yes No All CCF-D-24177 P1487A Outlet Drain Line &

Check Valve Position Swap CCF to swap P1487 outlet drain line and check valve position by relocating the check valve upstream in the location of the drain line connection.

Relocation of P1487A to allow for optimized draining.

SOLX ISA 07 URRS Solvent Extraction System Summary Yes No All CCF-D-24178 Replacement of AC-9412 CCF to replace AC-9412 serving ERBIA change rooms. Maintenance has already purchased a Daikin unit for the replacement.

Current unit has failed.

ERBIA Roof ISA 01 Plant Ventilation System Summary, ISA 01 Plant Ventilation No No All CCF-D-24183 Fire System Upgrades CCF to replacement of old Smoke Detectors and related devices within mechanical side to new Addressable Simplex smoke detectors.

The system needs to be updated and moved from the ADT system to the current Simplex plant system.

Mechanical side of Building ISA CFFF Site and Structures No No All CCF-D-24185 Chem Lab Thermo Oven #4 Removal CCF to remove Thermo Oven #4 from the Chem Lab.

Oven #4 is non-functional; No need for replacement.

Chem Lab, Muffler/Thermo Oven 4 ISA 18 Laboratories Systems Summary, ISA 18 Laboratories Systems No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24186 UT bath URRS CCF to update transducers and generators for UT bath.

The upgrade will replace the old generators and install compatible transducers to enable both tanks to be operational.

URRS UT Bath ISA 13 Low Level Radioactive Waste System No No All CCF-D-24188 Conversion Filter Press Plates CCF to modify existing filter plates to match updated drawings.

The filter plate holes dont line up with the endplates therefore in their current state they are unusable.

Conversion Lines 1-4 ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary Yes No All CCF-D-24196 Demo Fadal Vertical Mill (Engraver)

CCF to demo the old engraver after the new engraver installation (CCF-D-24151) is complete.

Phase 1 - Demo Fadal Engraver; Phase 2 -

Demo/Relocate Associated Equipment.

The existing engraver is old, and beyond its useful life.

South and East of the Bead Blast Room ISA CFFF Site and Structures No No Phase 2 CCF-D-24197 Stainless Steel Corner Guard for Beam CCF to install stainless steel corner guard on column 11E and the associated pipe that runs vertically along the column.

There is potential for channel carts to bump into the beam and chip paint off creating foreign material in a high FME area.

Final Assembly Column 11E ISA 17 Final Assembly Area, ISA 17 Final Assembly Area Summary, ISA CFFF Site and Structures No No All CCF-D-24199 Safety Upgrade -

Pellet Press Line 2

CCF to upgrade the pellet press (Line 2) to meet industrial safety standards for rotating machinery.

Increased safety methods and guarding are needed to protect the operator and other employees in the press area from hazards.

Pellet Press -

Line 2 ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System Yes No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24200 Safety Upgrade -

Pellet Press Line 3 and 4 CCF to upgrade the pellet press (Line 3-4) to meet industrial safety standards for rotating machinery.

Increased safety methods and guarding are needed to protect the operator and other employees in the press area from hazards.

Pellet Press Line 3 and 4 ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System Yes No All CCF-D-24201 Safety Upgrade -

Pellet Press Line 1

CCF to upgrade the pellet press (Line 1) to meet industrial safety standards for rotating machinery.

Increased safety methods and guarding are needed to protect the operator and other employees in the press area from hazards.

Pellet Press Line 1 ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System Yes No All CCF-D-24203 Replace Filter Housings on Thermal Stability Oven A CCF will replace the obsolete filter housings on the Nitrogen, Hydrogen and Natural gas supply lines to Thermal stability oven A.

The existing filter housings on Thermal Stability Oven A are obsolete.

Pelleting Thermal Stability ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System No No All CCF-D-24204 Install Hydrometer in T-3 Recirculation Piping CCF to install a new Brady hydrometer in the recycle piping of T-3 located outside in tank farm.

Off-line testing is labor intensive and creates the potential for employee exposure.

Tank Farm ISA 06 Chemical Receipt and Storage Summary, ISA 06 Chemical Receipt and Storage Yes No All CCF-D-24206 Badge Readers -

IT Offices CCF to place Badge readers on the entrance doors of the IT department office entrance doors and double doors leading to data center room.

For Security access.

IT Office Area, 2nd Floor ISA CFFF Site and Structures No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24208 Badge Reader for Backup Control Room in Conversion CCF to install badge readers in backup control room in Conversion. Installation of badge reader and water sensor in Honeywell server room.

For security purposes.

Honeywell Server Room ISA CFFF Site and Structures No No All CCF-D-24209 New Horizontal Lathe for Chemical Side Machine Shop CCF to remove old lathe, and installation of the new one in the Chemical Side Machine Shop.

The existing lathe cannot be repaired. The new lathe is state-of-the-art.

Chemical Side Machine Shop ISA CFFF Site and Structures, ISA CFFF Site and Structures No No All CCF-D-24211 Add Pressure and Temperature Indicators CCF to add pressure and temperature gauges to indicate pressure and temperature of return water into the cooling towers. Cooling tower loop CTW-1186 CTW-1126.

Gauges needs to monitor pressure in Cooling Tower (8 psi or less).

URRS outside, Stills Cooling Tower ISA 15 Wastewater Treatment System, ISA 15 Wastewater Treatment System Summary No No All CCF-D-24212 ERBIA Blu M Centrifugal Bowl Oven Replacement with JEIO Tech Oven CCF to replace current Stabil-Therm Blue M Model: OV-18A with new JEIO TECH Model:

ON-02G. Phase 1 - Replace Oven with JEIO Tech Model - ON-02G oven; Phase 2 - Replace 30-amp breaker with 15-amp breaker on circuit 19 Panel RP-102F.

Current Lindberg Centrifugal Bowl Oven is obsolete.

ERBIA ISA 08 ADU Pelleting System Summary No No All CCF-D-24213 Scrap Cage S-1030 Tank Frame Northwest CCF to repair and modify the W6x15.5 member (Beam-2) northwest side of Conversion Scrap Cage S-1030 Tanks Frame. Phase 1 - Repair Column and floor; Phase 2 - Install support; Phase 3 - Remove support.

Scrap Cage Tank Frame beam base plate and bottom section is diminished reducing support capacity.

Conversion ISA 11 Scrap Uranium Processing System Summary Yes No All CCF-D-24214 Add Valve to Water Return Line Ammonia Stills CCF to add valve to cooling tower returns to throttle water flow and reduce pressure going into cooling tower. Cooling Towers CTW-1126 and CTW-1186.

Cooling towers currently use gate valve to throttle pressure upgrade provides for better control over pressure.

URRS Cooling Towers ISA 15 Wastewater Treatment System, ISA 15 Wastewater Treatment System Summary No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24215 Vent Screen Install CCF to add exhaust hood vent screen in the ADU men's change room. Each vent screen will need to be installed to the hood using a frame.

Current filters collect too much lint and aren't easily replaceable. New filter will be easier to access and replace.

ADU Men's Change Room ISA 01 Plant Ventilation System Summary, ISA 01 Plant Ventilation No No All CCF-D-24216 Thermal Stability System "A" Improvements CCF will replace the Hydrogen gas moisture saturator and associated copper tubing with stainless steel tubing. Also, the saturator level probes will be replaced to match Thermal Stability Oven (TSO) "B" level system.

Updating tubing to stainless steel will meet existing codes and standards.

Pelleting TSO "A"

ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System No No All CCF-D-24218 Breaker Change in Power Panel -

1617-C CCF to change braker in Power Panel 1617-C Breaker. Phase 1: Temporary rewired load (4) to a spare breaker (16); Phase 2: Replace breaker with non-obsolete and rewire load to original slot.

Breaker failure needs replacement, part is obsolete.

Old Expansion Mechanical Side Grids Area ISA CFFF Site and Structures No No Phase 1 CCF-D-24219 Upstairs Change Room Heaters CCF to add independent heaters to create a comfortable environment.

Adding additional heaters to maintain a comfortable temperature in the changing room.

Upstairs Change Room ISA CFFF Site and Structures, ISA CFFF Site and Structures No No All CCF-D-24220 Floor Enhancement-Conversion Scrap Cage Dissolver Hood CCF to enhance floor VH-1059 by increasing the thickness from 12 gauge to 1/4" thickness.

VH-1059 leaks due to floor warping causing the weld to crack by floor pulling from the walls. By making the floor more robust, it will prevent the floor from warping.

Conversion Scrap Cage ISA 11 Scrap Uranium Processing System Summary Yes No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24223 Level Switch for T-1158 CCF to add a robust, steel and polypropylene switch to the storeroom, to be used in the level pot attached to the T-1158 compression tank.

The current stainless steel level switch being used was often broken when being installed.

URRS Tank Farm ISA 06 Chemical Receipt and Storage, ISA 06 Chemical Receipt and Storage, ISA 06 Chemical Receipt and Storage Summary No No All CCF-D-24224 Increase Shaft Thickness for future URRS Dissolver Shafts CCF will change the future Counter Current Contactor URRS Dissolver shafts from Schedule 40 to Schedule 80.

Changing shaft thickness will reduce the dissolver shafts arriving bent.

URRS SOLX ISA 04 Safe Geometry Dissolver System Summary, ISA 04 Safe Geometry Dissolver System No No All CCF-D-24225 Final Assembly Wash Pit Trench Cover CCF to specify a stainless-steel cover to be placed over the Final Assembly Wash Pit Trench grating to prevent zirc fines from being blown into the trench.

FA area requests a better solution that could potentially reduce the amount of zirc fines that make it into the trench.

Final Assembly ISA 17 Final Assembly Area Summary No No All CCF-D-24226 Replace Roof Over G, G1, N and URRS CCF to replace roof over the G, G1, N and URRS (16'x20' metal out building).

The roof has reached the end of its useful life in the G, G1, N and URRS areas and must be re-roofed to remain watertight.

Building Roof ISA 18 Laboratories Systems, ISA 18 Laboratories Systems Summary Yes No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-24229 V756A/B Passive Overflow Material Change CCF will change the passive overflow material for V756A/B from clear PVC to a material that can withstand a higher temperature.

To update the design for acceptable temperature of at least 200 degrees Fahrenheit. IR-2024-13041.

Product Hold Tank in SOLX for Dirty Scrap Dissolver ISA 04 Safe Geometry Dissolver System Summary, ISA 04 Safe Geometry Dissolver System Yes No All CCF-D-24230 TSH-409BB Changes from Dialtrol to UDC CCF will changes from Dialtrol to UDC.

Change out to UDC due to not being able to calibrate old unit.

Calciner Line 4 Superheated Steam ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary No No All CCF-D-25001 Install Rebuilt Hot Oil Dryer on ADU Line 3 CCF to modify Line 3 Hot Oil Dryer support pier with new cap similar to Line 2 cap modification performed in CCF-D-20281.

Existing unit cannot be repaired.

Conversion -

ADU Line 3 ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary No No All CCF-D-25003 City Water Line Connection Change CCF will replace water line tee with a welded slip-on Class 150 flange Tee spool piece with new welded slip-on flanges on the existing 6-inch pipe.

The current Victaulic connection is leaking in Pelleting near Sintering Furnaces and Grinders and where pellet carts are stored. Leak will be repaired with a flanged tee connection.

Pelleting and Grinding Areas ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System, ISA CFFF Site and Structures Yes No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25009 S-1030 Elbow/Inlet Transition Nozzles and Piping Design Change CCF will change the spray nozzles on the S-1030 Elbow/Inlet Transition. Phase 1 - 1 Inch Hot Tap; Phase 2 - Replace all old carbon/galvanized piping with new Stainless-Steel Piping and Upgrade Regulator to Stainless Steel Body; Phase 3 -

Replace all obsolete spray nozzles in Inlet Elbow and Transition.

Storeroom Item is no longer available as a 1/4" spray nozzle. Additionally, it has been determined the Inlet and Transition are getting low flow rates from piping over time.

S-1030 Inlet Transition and Elbow ISA 01 Plant Ventilation System Summary, ISA 01 Plant Ventilation, ISA 01 Plant Ventilation, ISA 01 Plant Ventilation System Summary Yes No All CCF-D-25014 Install New Disconnect Switch for CB Testing CCF to install a disconnect switch and plug for Circuit Breaker (CB) testing on EPP-9AA-2 in equipment room 3. Also, finish the installation of the current disconnect switch and plug that was started on CCF 19041.

Equipment will allow for equipment testing for electrical outages to be set up where it can be plugged into the emergency feeds for testing while the electrical substations are down.

Equipment Room 3 Plant Utilities ISA CFFF Site and Structures No No All CCF-D-25015 Operator Control Panel Substitution and Replacement for Transformer Fans on Substation 3 CCF to replace operator control panel substitution and replacement for the transformer fans on substation 3. The CIMCO part Model A21 will be utilized on substation 3.

The transformer fans control panels on the substations are obsolete in several locations. CCF is to cover the substation 3 transformer on the site to have the control panel changed to CIMCO Model A21.

Plant Substations ISA CFFF Site and Structures No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25017 EPR Lower Core Plate Modification for VIPER CCF will modify the lower core plate for EPR Fuel for the VIPER Loop. This will drill and tap some additional holes to the lower core plate.

Modification is needed to support EPR fuel and development.

Viper Loop ISA 18 Laboratories Systems Summary, ISA 18 Laboratories Systems No No All CCF-D-25018 IFBA Oven 3 Door Sprocket Split Locking Collar Installment CCF to install split locking collars on IFBA Oven 3 door shaft to secure door chain sprocket in place.

Oven 3 door sprocket slides out of alignment causing counterbalance to hit.

IFBA ISA 12 IFBA Fuel Rod Manufacturing System Summary No No All CCF-D-25022 Modify Improved Pinch Roller Gripper Mounting Geometry CCF to modify Improved Pinch Roller Gripper Mounting Geometry.

The current arrangement requires too many shims to make fit and does not adequately maintain belt tension.

Lines 8 & 9 -

All Pinch Roller Mounts that Utilize 463F03EQ09 Pinch Roller Grippers ISA CFFF Site and Structures No No All CCF-D-25025 Modify Ladders -

Mechanical Side CCF to revise ladder design to comply with updated standards.

New ladder design is needed to comply with updated standards.

Ladders throughout Mechanical Side of CFFF ISA CFFF Site and Structures No No Phase 2, 3, & 6 CCF-D-25027 Alternate Brake Wheel for Storage Channel Carts CCF to modify the Blickle Brake Wheel to have a harder tire element to decrease rolling resistance.

Operators of smaller stature find the carts difficult to push when fully loaded.

Mechanical Side, Rod Storage ISA 17 Final Assembly Area, ISA 17 Final Assembly Area Summary Yes No All CCF-D-25028 Gamma Scanner 4 Belt Adjustment Plate Modification CCF for Belt Adjustment Plate modification Gamma Scanner 4.

Current belt adjustment lacks enough range and detracts from belt durability.

Mechanical Side, Gamma Scanner 4 ISA 10 ADU Fuel Rod Area Summary, ISA 10 ADU Fuel Rod Area Yes No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25031 Replace Sanitary Lagoon Floating Aerator CCF to replace broken Sanitary Lagoon floating aerators. The aerator has failed, and an identical replacement is not available. A replacement will be specified to support the need of the sanitary lagoon. CCF will be an alternative for the existing aerators.

One of the floating aerators on the sanitary lagoon is broken beyond repair.

URRS Outside Sanitary Lagoon ISA CFFF Site and Structures, ISA 15 Wastewater Treatment System Summary, ISA 15 Wastewater Treatment System No No Phase 1 CCF-D-25038 AGI Scanbox #2 Removal &

Storage CCF to remove the Scanbox that is inside the Laser A layout and store it in a location to be determined by the project team. Scanbox will be reinstalled in its new location by CCF 25039.

Required to support Laser A project completion.

Grid Manufacturing ISA CFFF Site and Structures No No All CCF-D-25042 Obsolete Pellet Density Scale CCF to replace obsolete scale with new model.

Current Mettler Toledo scale is obsolete. A newer Mettler Toledo scale will replace the obsolete model.

Current Mettler Toledo scale is obsolete.

Pelleting ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System No No All CCF-D-25043 Replace Centrifuge Housing/Material from a FRP to Stainless Steel.

CCF to change Centrifuge Housing/Material from a Fiberglass Reinforced Plastic (FRP) to Stainless Steel.

Manufacturer no longer makes the housing in FRP but makes a similar one in Stainless Steel.

Chemical Side, ADU Pellet Grinding ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System Yes No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25048 Adapt ADOPT Transport EBC to Re-mill Station

  1. 2 in Bulk Room CCF to allow the ADOPT transport EBC's to be processed through the bulk blending Remill Station.

The current design of the re-mill station 2 does not match the current configuration of the new ADOPT 500 kg ADU transport container assemblies.

Remill Station 2 500F03AR07:3 A

ISA 05 ADU Bulk Blending System Summary, ISA 05 ADU Bulk Blending System, ISA 20 ERBIA System, ISA 20 ERBIA System Summary Yes No All CCF-D-25049 Alternate Coater Shield Design CCF to modify two of the lower shields in the IFBA coaters to increase their edge clearances and better maintain their positions during operation.

The existing shield design allows for the shield to move about enough that arcing can occur.

IFBA Production ISA 14 IFBA Processing Summary, ISA 14 IFBA Processing No No All CCF-D-25053 Rental Ammonia Chiller Piping Design Change CCF will install stainless steel piping to and from the primary Chilled Ammonia System to the mobile heat exchanger. Additionally, CCF will document the rental chiller installation configuration for its associated chilled water system that serves the mobile heat exchanger.

CAP IR-2025-3264.

Ammonia Chiller, Sub 6 Outside ISA 03 ADU Conversion System Summary, ISA 03 ADU Conversion System Yes No All CCF-D-25054 ADOPT Nitrogen Flow Meter Upgrade CCF to replace the current Swagelok flow meters with a comparable model that includes a built-in analog transmitter to connect to a PLC for display of flow rate.

Allow for remote viewing and trend data.

Pellet Expansion Blending ISA 20 ERBIA System, ISA 20 ERBIA System Summary No No All CCF-D-25055 Line 5 Pelleting Removal of Vacuum Pump P-1909 CCF for Line 5 Pelleting removal of vacuum pump P-1909. The pump has not been operational and is being removed.

Line 5 pellet press new one was installed, and the P-1909 is blocking the pathway for the operator.

Pelleting Line 5 ISA 01 Plant Ventilation System Summary Yes No Phase 1

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25060 Remove Water Fountain CCF for the removal of the water fountain in the Product Engineering (PE) Lab. Water line to be capped off after the water fountain is removed.

Water fountain no longer necessary in the area since it is not being used. That space could be better utilized.

Product Engineering Lab ISA 18 Laboratories Systems Summary, ISA 18 Laboratories Systems No No All CCF-D-25061 Substitution of Components CCF is to add an equivalent Human Machine Interface (HMI), Power Supply, Load Cell transmitter, and relay components to the Bill of Material (BOM) for Mother Blender. Substitution of OIT Allen Bradley PVP, Power Supply, Load Cell transmitter and relay components.

Provide storeroom alternative parts in case of component failure.

2nd Floor Pellet Expansion ISA 20 ERBIA System, ISA 20 ERBIA System Summary No No All CCF-D-25062 Remove Unused Weight Transmitter from Flexicon Panel CCF to remove Unused Weight transmitter from Flexicon panel CCF will demo out the unused transmitter supplied by vender.

2nd Floor Pellet Expansion ISA 20 ERBIA System, ISA 20 ERBIA System Summary No No All CCF-D-25063 Grid Laser 4 Stop Repair CCF for Grid Laser Stop Repair.

Needed for Laser 4 Functionality.

Grid Laser 4 ISA CFFF Site and Structures No No All CCF-D-25064 Correct Strongback Pivot Assembly Front Bracing CCF is to update the drawing and change out the front bracing on the new assembly to be consistent with the thicker bracing on the original strongback pivot assembly.

The new assembly was made with a front bracing that is 1/8-inch-thick angle plate, but it should be 3/8 inch think angle plate to withstand the weight of the assembly without being damaged.

PE Lab ISA 18 Laboratories Systems Summary, ISA 18 Laboratories Systems No No All CCF-D-25067 Installation of Investigative Wells CCF for additional monitoring wells to be installed. This is part of a pilot study on the U impact at Well W-56 on the western side of the plant. Phase 1 Pilot study for Chlorinated Volatile Organic Compounds (CVOC);

Phase 2 Pilot study for Uranium; Phase 3 Pilot study for Tc-99 To investigate historical radiological and non-radiological constituents found in groundwater monitoring wells.

South Lagoon, Truck Parking and Dock 3 ISA CFFF Site and Structures No No Phase 1

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25070 New Breakers for UPS-3 Installation CCF to add two Breakers for purpose of using one of them as a main breaker for the panel UDP2-105E-1, install new UPS disconnect and rewire the panel as a main breaker panel. This will minimize or eliminate down time in future when UPS #3 needs to be replaced.

The new breakers will minimize impact of bringing the new UPS-3 online.

ERBIA Equipment Room ISA CFFF Site and Structures Yes No All CCF-D-25071 C-frame Adapters for Conversion Pumps on CL2 CCF will allow for the use of C-frame adapters to improve pump/motor alignment for reliability improvement. Pump positions covered include P0211A, P0211B, P0231C, P0231D and will be completed in four phases.

CCF will qualify the configuration change to use C-face adapters to aid pump/motor shaft alignment to improve pump reliability.

Conversion ISA 03 ADU Conversion System No No All CCF-D-25073 ADOPT 50L Blender Nitrogen Aeration Modification CCF will add a nitrogen distribution ring to the bottom of the 50L Blender to promote better mixing.

Reduction in ADOPT scrap rate.

2nd Floor Pellet Expansion ISA 20 ERBIA System, ISA 01 Plant Ventilation Yes No All CCF-D-25074 Modify Mother Blender Rotation for Testing and Install PLC CCF to modify rotation of Mother Blender to allow testing. Install permanent wiring to allow PLC to modify direction of blender. Phase 1: Temporarily Reverse Orbital Arm Direction; Phase 2: Return to Normal Orbital Arm Direction; Phase 3: Install PLC control of Orbital Direction Modifying the rotation as a test to see if rotation impacts blending.

Pellet Expansion; 2nd Floor ISA 20 ERBIA System No No All CCF-D-25077 Rod Weigh Conveyor Relay Upgrade and Safety Contactor Addition CCF to upgrade electrical relays and contactors for Rod Weigh Conveyor.

Relays have been experiencing a high failure rate, and e-stop configuration change.

Rod Weigh Conveyor ISA 10 ADU Fuel Rod Area Summary, ISA 10 ADU Fuel Rod Area Yes No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25078 New Material for V-756 Overflow CCF to install new Material for V-276A/B Overflow Currently the overflow for V-756A/B in URRS is fabricated from polycarbonate pipe and Kynar fittings. The overflow material must have a temperature rating of at least 230 F, be resistant to nitric acid and other aggressive chemicals, and translucent.

Current piping is cracking.

North wall Inside URRS ISA 04 Safe Geometry Dissolver System, ISA 04 Safe Geometry Dissolver System Summary Yes No All CCF-D-25081 Poly Pak Storage Cart Alternate Flow Rail Modification CCF to allow for a new cart design like the existing one used for Conversion Powder Storage.

Current flow rails are obsolete, and the company has been bought out.

Conversion ISA 16 Storage of Uranium Bearing Materials Summary, ISA 16 Storage of Uranium Bearing Materials Yes No All CCF-D-25083 Modify Laser X /

Laser A Soot Sucker Top Mount CCF to modify Laser X / Laser A Soot Sucker Top Mount to remove the gasket step.

Gasket step is insufficient to assure gasket engagement.

Laser A & B ISA CFFF Site and Structures No No All CCF-D-25087 IFBA Area FN-802A VFD Replacement CCF for the replacement of obsolete ACS-800 with an ACH-580 on the IFBA Dust Collector system.

Removing the fiber/Ethernet connections from Variable Frequency Drive (VFD) and UDC.

Update UDC and VFD controls and settings as needed.

802A Fan VFD has failed and is obsolete. There were field conditions that were unexpected and went unnoticed during the initial MCP.

IFBA ISA 01 Plant Ventilation, ISA 01 Plant Ventilation System Summary No No All CCF-D-25088 Obsolete Elevator Conveyor Belt CCF to replace obsolete storeroom part with new conveyor belt. Technical Specification sheet for the new belt is attached to CCF.

Obsolete part.

Feed End of Calciner ISA 03 ADU Conversion System Summary, ISA 03 ADU Conversion System No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25092 Fire Damper Replacement Option CCF for the replacement of Fire Dampers - Provide for the option replacement of the Ruskin fire dampers with units from Pottorff.

Ruskin units have very long lead times.

Chemical Side, Incinerator ISA 13 Low Level Radioactive Waste System Summary, ISA 13 Low Level Radioactive Waste System Yes No All CCF-D-25095 Underground Bell South (AT&T) line CCF to move Underground Bell South (AT&T)

Fiber line and remove abandoned telephone lines to clear area for LEU+ building. Phase 1: Relocate Fiber line; Phase 2: will be to remove the two copper wire phone lines that are not in use.

There are fiber and copper wire lines from Bluff Road to IT. These lines are currently in the path of LEU+ building design and need to be re-routed/re-pulled or removed.

Plant Grounds ISA CFFF Site and Structures No No Phase 1 CCF-D-25105 Install Double Block and Bleed Valves CCF to install double block and bleed valves on the suction and discharge lines of P-1143 A&B pumps, Still 2 Main Steam Line, and Still 1 & 2 Steam Trap. Phase 1 - P1143 A&B Suction/Discharge; Phase 2 - Still 1 steam trap; Phase 3 - Still 2 steam trap; Phase 4 - Still 2 main steam line.

To ensure safety and operational efficiency by isolating the pump, trap, etc. from steam and hot water while performing maintenance or operations tasks.

URRS Still ISA CFFF Site and Structures No No All CCF-D-25106 Add Grinder Centrifuge Bowl Drying Oven Catch Pan CCF for adding a catch pan to the Grinder Centrifuge Bowl Drying Oven. CCF will approve the use of either of two catch pan design solutions.

The current configuration allows minute amounts of grind material to fall to the bottom of the oven and into the heating element vent slots.

Chemical Area, Grinder Centrifuge Drying Ovens, 7 Locations ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25109 UF6 Piping Gasket CCF for a new gasket material for the UF6 flange connections. CCF will be a specification change.

Due to frequent temperature changes, the Teflon gaskets are performing poorly and have the potential to leak.

UF6 Bay ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary Yes No All CCF-D-25110 ADOPT Re-mill Station #1 Modifications CCF to modify Re-mill Station #1 to allow for ADOPT EBC use.

Required for processing ADOPT material. Current configuration does not allow for ADOPT EBC use.

Bulk Blending Room ISA 05 ADU Bulk Blending System Yes No All CCF-D-25114 Install New Wire Safety Glass Window and Crash Bar on Substation 6 Building Door CCF will install new wire safety glass window and crash exit bar on Substation 6 building door.

To resolve IR-2025-331,1 Action 7 Substation 6 ISA CFFF Site and Structures No No All CCF-D-25118 RP-Darkroom Breaker Install/Change for X-Ray Film Processor CCF to add/replace breaker and receptacle to allow installation of X-Ray Film Processor.

Current equipment is 120V, new equipment is 240V.

QC Darkroom ISA CFFF Site and Structures No No All CCF-D-25120 Training Facility Fire Strobes CCF to address the Strobes in the training facility flashing in other unintended areas every time that the fire system is put into Bypass for testing.

Project to perform the necessary programming changes within the fire system for select zones.

Fire System.

Node 4.

Training Facility ISA CFFF Site and Structures No No All CCF-D-25128 Upgrade C200 Processor on Honeywell System for Stills 1

CCF to upgrade C200 Processor on Honeywell system for Stills 1.

C200 Processor is obsolete.

Stills Control Room ISA 15 Wastewater Treatment System Summary, ISA 15 Wastewater Treatment System No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25129 Upgrade C200 Processor on Honeywell system for Stills 2

CCF to upgrade C200 Processor on Honeywell system for Stills 2.

C200 Processor is obsolete.

Stills Control Room ISA 15 Wastewater Treatment System Summary, ISA 15 Wastewater Treatment System No No All CCF-D-25130 Define Replacement of Obsolete Siemens S7400 CPUs CCF to define replacement of obsolete Siemens S7400 Central Processing Units (CPU) in Conversion Line Safety PLCs. Upgrade one line to the new CPU of S7410.

PLCs are obsolete, spare parts will no longer be available in the near future.

ADU Lines 1, 2, 4, and 5 ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary Yes No Phase 1 CCF-D-25132 Cam Weldment Material Change CCF involves finding a suitable substitute material for the Calciner cam weldment.

Supplier is unable to locate material to complete cam weldment for calciner.

Calciners ISA 03 ADU Conversion System Summary, ISA 03 ADU Conversion System No No All CCF-D-25133 Grid Laser 6 Hood Extension CCF will install an extension to an existing laser light hood on Grid Laser 6 to fulfill SSC function HOOD-GRID-901 which prevents laser beam from exiting enclosure.

The current hood for Grid Laser 6 is not totally blocking light from the laser.

Grid Laser 6 ISA 19 Hoods and Containment System Summary, ISA 19 Hoods and Containment System Yes No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25138 Furnace 1C Shell Repair CCF for furnace repair of two holes in the top high heat extension wall caused by erosion.

Need CCF to make repairs due to adding to the structure.

Pellet Sintering Furnace 1C ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System Yes No All CCF-D-25139 New X-ray Film Developer Installation CCF to replace old x-ray film developer with new developer, Industrex M37 plus Film Processor, in the Dark Room.

Old film developer is broken and obsolete. New developer will replace the old developer as backup when the other is down; vice versa etc.

Dark Room ISA 10 ADU Fuel Rod Area Summary, ISA 10 ADU Fuel Rod Area No No All CCF-D-25145 Incinerator Fitzpatrick Fitzmill pillow Block Housing CCF will create an alternate Incinerator Fitzpatrick Fitzmill pillow block housing.

The existing housing is no longer available and has been replaced with a new model.

Incinerator Room ISA 13 Low Level Radioactive Waste System, ISA 13 Low Level Radioactive Waste System Summary No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25146 Incinerator Champs PC Replacement CCF to install new computer with Windows 11 operating system for ITACT transactions between CHAMPS and the Incinerator safety PLC.

To modernize hardware and software.

Incinerator PC ISA 01 Plant Ventilation System Summary, ISA 01 Plant Ventilation, ISA CFFF Site and Structures, ISA 13 Low Level Radioactive Waste System Summary, ISA 13 Low Level Radioactive Waste System Yes No All CCF-D-25147 Mechanical Plant Compressed Air Filter Design Change CCF will replace the clear Deltech filter housing in the mechanical plant with a Balston model filter that is currently used on Thermal Stability in the Pelleting Area.

The filter in Final Assembly at QC1 experienced a depressurization event that sent shrapnel beyond its designed containment.

Filter design change will swap to an aluminum housing with a much higher design pressure rating. PIR-2025-2713.

Throughout Mechanical Plant ISA 10 ADU Fuel Rod Area, ISA 17 Final Assembly Area Summary, ISA CFFF Site and Structures, ISA 10 ADU Fuel Rod Area Summary, ISA 17 Final Assembly Area No No Phase 1, 2, 3, 11

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25154 URRS Dissolver Volumetric Feeder Manufacture Change CCF to change the URRS Dissolver Volumetric feeder manufacturer.

URRS Dissolver feeder manufacturer Accurate has changed several times.

The current company owner is Coperion.

URRS Dissolvers ISA 04 Safe Geometry Dissolver System, ISA 04 Safe Geometry Dissolver System Summary No No All CCF-D-25161 Moore STA/SPA Replacement Scrap Recovery CCF for Moore STA/SPA Replacement - Scrap Recovery Follow-up CCF to CCF-S-22161 for Moore STA install.

Action item in CCF-S-22161 Independent Technical Review (ITR) required creation of separate CCF to document possible field changes.

Scrap Tanks -

Precipitation Pumps ISA 11 Scrap Uranium Processing System Summary, ISA 11 Scrap Uranium Processing System Yes No All CCF-D-25173 MCC 7706 Hot Buss Bar Solution CCF will rearrange the buckets in the MCC to avoid the damaged buss bar in the cabinet. The buss bar connection for load EPP-10BB was discovered to be damaged inside of MCC 7706.

To address hot spot found on the buss bar within the MCC cabinet.

Equipment Room 3 (MCC 7706)

ISA CFFF Site and Structures No No All CCF-D-25179 Coater 6 Cooling Loop Isolation CCF to provide an alternate routing / components for the coater's internal right side cooling loop to be blocked off and isolated for operation.

Alternate cooling loop will allow operations better temperature control.

IFBA Coater 6 ISA 14 IFBA Processing Summary, ISA 14 IFBA Processing Yes No All CCF-D-25180 Change Feed to Range CCF for Dominion Power to move part of the feed to the Range from above ground to below ground.

LEU+ needs to have the feed moved from above ground to below ground.

Plant Grounds Outside of Controlled Access Area ISA CFFF Site and Structures No No All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-D-25184 Furnace 3B Weldment CCF to have a small plate welded over the hole on the outside of the south face of the shell of furnace 3B.

The 3B furnace shell has a small hole that needs to be repaired.

Furnace 3B ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System Yes No All CCF-F-25069 ADA Door Hardware Addition CCF for adding door opener push button on second floor West side office area men's restroom.

Americans with Disabilities Act compliance.

2nd Floor West Side Men's Restroom ISA CFFF Site and Structures N/A N/A All CCF-F-25194 Remove Electrical and Pole by Range CCF is for removing the power to a light pole and removing the pole.

To facilitate construction and access for LEU+.

East Pole by Range ISA CFFF Site and Structures N/A N/A All CCF-F-25197 Dake Press Anchoring - Tool Room CCF to Anchor Dake Press to the Tool Room floor.

Currently the press is not anchored. It needs to be anchored to ensure industrial safety.

Tool Room, DAK Press ISA CFFF Site and Structures N/A N/A All CCF-S-23095 Substitution for Obsolete DP Level Transmitter Installed as LIT-116B and LIT-216A CCF to substitute out Rosemount Transmitter that is obsolete. The proposed replacement is currently in operation as LIT-116A in Conversion.

Transmitters are obsolete, and the proposed direct replacement is already in use on similar applications.

Q-Tanks ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary No N/A All Phase 1 - 2023 Phase 2 - 2025 CCF-S-23161 Substitution of Reversing Motor Starter for Powder Lifts of Pellet Lines 1-3 and 5 CCF for the substitution of reversing motor starter for Powder Lifts of Pellet Lines 1-3 and 5.

Substitution was previously performed for the Line 4 Powder Lift under CCF-S-22204. That equivalency criteria will be used for CCF.

Existing starter/overload assembly has failed,, is obsolete and is not available from the storeroom.

Pellet Lines 1-3 and 5 Powder Lift Control Panels ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System No N/A Line 1 - 2025

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-S-24140 Substitution for Obsolete Equipment CCF for substitution for obsolete Honeywell Microswitch LSH2B in Safety Significant installation for Pelleting Line 5 Deer-Stand "Container in Place" ZSC-1905A.

Existing switch is obsolete and has failed.

Line 5 Bulk Container Deer-Stand ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System Yes N/A All CCF-S-24192 Fitzmill Rexroth Lift/Position Cylinder Replacement CCF to replace the callouts for the existing Fitzmill Rexroth lift and position cylinders with Bimba or equivalent readily available cylinders. (to cover current and future replacements.)

Rexroth no longer manufactures pneumatic cylinders.

Chem Side, Conversion, Fitzmills ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary No N/A All CCF-S-24198 Thermostat Men's Change Room CCF for the thermostat in Men's change room is obsolete and needs to be replaced with one that cuts off at a lower temperature to prevent triggering the heat detector in the change room.

Current thermostat is triggering at a temperature that is near the same range as the heat detector in the change room.

Downstairs Men's Change Room ISA CFFF Site and Structures No N/A All CCF-S-24210 IFBA Mop Water Pressure Sensor Replacement CCF to replace pressure sensor in IFBA for the mop water process.

Replacing obsolete part with a new readily available one.

IFBA MOP Water ISA 14 IFBA Processing Summary, ISA 14 IFBA Processing No N/A All CCF-S-24221 HFD Breaker Replacement CCF for the HFD breaker replacement to allow for the use of Eaton HFD breakers to replace FB, HFB, FD, HFD series breakers manufactured by Westinghouse, Cutler Hammer, and Eaton.

Obsolete breakers need replacement. Allow common size breakers to be kept in storeroom to cover a range of install options.

Power Panels ISA CFFF Site and Structures No N/A All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-S-25005 XV-S-305A-1 and XV-S-405B-2 Actuator Substitution CCF will substitute a Worcester 39 series actuator with a Worcester F39 series on the Precipitator on Conversion Line 3 and Line 4. Substitution was evaluated for use in safety applications under previous CCF 21085 and determined to be equivalent.

Series 39 is obsolete and will be upgraded to Series F39.

Precipitators on Line 3 and Line 4

ISA 03 ADU Conversion System, ISA 03 ADU Conversion System Summary Yes N/A All CCF-S-25016 CCF-S-25016 Nitrogen Flow Indicator Replacement FI5B-1 CCF for the replacement of obsolete Brooks Flow Indicator 3809E with 3809G. Located on Pelleting Furnace 5B. Equipment Tag FI5B-1 Phase 1:

Replacement with current produced part; Phase 2:

Replacement with storeroom stocked part that is obsolete for quick return to service.

Old part obsolete and unable to be sourced.

Exterior Furnace 5B ISA 08 ADU Pelleting System Summary, ISA 08 ADU Pelleting System No N/A All CCF-S-25021 XV-S-202-10 Actuator Substitution.

CCF will substitute a Worcester 39 series actuator with a Worcester F39 series on the Precipitator on Conversion Line 2. Substitution was evaluated for use in safety applications under previous CCF 21085 and determined to be equivalent.

Series 39 is obsolete and will be upgraded to Series F39.

Conversion Line 2 ISA 03 ADU Conversion System Summary, ISA 03 ADU Conversion System Yes N/A All CCF-S-25032 Substitution of Valve Assembly CCF substitution based on CCF-D-21085 which established the Worcester 39F as a suitable replacement for the obsolete 39 series actuator.

Substitution of Flowserve/Worcester valve assembly with 39F20 120V actuator for obsolete Flowserve/Worcester 39 series size 20 120v.

Actuator has failed and is obsolete and not available in the storeroom. The system will be shut down until the actuator is replaced.

Map Waste Treatment at T-1148 ISA 15 Wastewater Treatment System, ISA 15 Wastewater Treatment System Summary No N/A All CCF-S-25041 Substitution Pre-filter for SR#

189264 CCF for substitute pre-filters. Phase 1 - AAF International HC Merv 11, Replaces SR#189264; Phase 2 - AAF International Ultra Merv 11 with Antimicrobial - optional.

AAF International bought Flanders and changed part numbers and names.

IFBA Line 5 Drying Room ISA 12 IFBA Fuel Rod Manufacturing System Summary No N/A All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-S-25045 Grid Area Lasers HEPA Filter SR#21178 Substitution CCF to substitute RUWAC UL900 HEPA filter ()

with similar type filter but non-UL900 test stamped filter.

RUWAC manufacturer still creates the same filter but stopped testing the filter for UL900 stamp.

Filter is unique to RUWAC filtration.

Grid Area ISA 01 Plant Ventilation System Summary No N/A All CCF-S-25047 Grid Area Laser Weld HEPA Substitution CCF to substitute RUWAC UL900 HEPA filter with similar type filter UL900 test stamped filter.

To specifically approve UL900 HEPA filter for Grid Laser Weld. To have optional filter in storeroom.

Grid Area ISA CFFF Site and Structures No N/A All CCF-S-25056 Vaporizer Steam PRV Substitution CCF for Vaporizer Steam Pressure Relief Valve (PRV) Substitution. Farris valve in use on Lines 1-4 is obsolete. To be substituted with Kunkle valve.

Current valve is obsolete. Vaporizers Lines 1-4 ISA 03 ADU Conversion System Summary, ISA 03 ADU Conversion System Yes N/A All CCF-S-25057 Asco Solenoid Valve Substitution CCF will substitute obsolete 8262C7 Asco with Asco 8262H007. Substitution will occur on Conversion Line 4 hot oil dryer on the nitrogen purge.

Old Asco solenoid valve is obsolete.

Hot Oil Dryer Room ISA 03 ADU Conversion System Summary, ISA 03 ADU Conversion System No N/A All CCF-S-25058 Conversion Line 4 Off-Gas Dryer Filter (Pressure Transmitter)

CCF is to perform a substitution for PT429A for the Conversion Line 4 Off-Gas Dryer Filter. A Rosemount pressure transmitter for the calciner off-gas dryer filter on conversion Line 4 failed. The part is obsolete and needs to be replaced.

Transmitter is an old style that is no longer supported.

Conversion Line 4 ISA 03 ADU Conversion System Summary, ISA 03 ADU Conversion System No N/A All

WESTINGHOUSE NON-PROPRIETARY CLASS 3 LTR-RAC-26-08 Enclosure CCF Number Title Description Justification Location ISA ID Safety Controls Impacted?

New Safety Controls?

Phases Approved for Startup CCF-S-25072 URRS Still 2 Level Control Substitution CCF to replace alternative valve to the current LCV-1178 valve is a Fisher 1" V500 that has failed.

The current FCV valve is a Fisher 1" V500 and the actuator has failed.

URRS Still 2 ISA 06 Chemical Receipt and Storage Summary, ISA 06 Chemical Receipt and Storage No N/A All CCF-S-25086 Conversion Vaporizer Lid; Obsolete Machine Screw Jack CCF will replace the obsolete machine screw jack used to open and closing the conversion vaporizer lids. CCF will be an alternate for all conversion vaporizers.

Obsolete machine screw jack on conversion vaporizers.

Conversion Line 4 ISA 03 ADU Conversion System Summary, ISA 03 ADU Conversion System No N/A All CCF-S-25159 P-1191 HF Vent Tank Pump Substitution CCF for evaluation/substitution of pump in storeroom needed for use.

The pump cannot remain down for the duration of the lead time.

Tank Farm ISA 06 Chemical Receipt and Storage Summary, ISA 06 Chemical Receipt and Storage No N/A All CCF-S-25178 Replace Type 504 Miller Air Valve CCF will substitute and replace an old Miller Fluid Power air valve with a Parker Hannifin Air Valve. Valve is obsolete.

Nonfuel WABA ISA CFFF Site and Structures No N/A All