ML26022A085

From kanterella
Jump to navigation Jump to search

Substantive Change for Amercan Centrifuge Operating, LLCs Security Plan in Oak Ridge, Tennessee
ML26022A085
Person / Time
Site: 07007004
(SNM-2011)
Issue date: 01/15/2026
From: Karen Fitch
American Centrifuge Operating
To: Anthony Bowers
Document Control Desk, Division of Security Operations, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Security and Incident Response
References
ACO 26-0007
Download: ML26022A085 (0)


Text

Ame Centrifug rating January 15, 2026 ACO 26-0007 CUI // SP-SRI Security-Related Information-Withhold Under 10 CF'R 2.390 ATTN: Document Control Desk Anthony Bowers, (Acting) Director Division of Security Operations Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 American Centrifuge Plant; Docket Number 70-7004; License Number SNM-2011 Substantive Change for American Centrifuge Operating, LLC's Security Plan in Oak Ridge, Tennessee INFORMATION TRANSMITTED HERE WITH IS PROTECTED FROM PUBLIC DISCLOSURE AS SECURITY-RELATED INFORMATION PURSUANT TO 10 CFR 2.390

Dear Anthony Bowers:

The purpose of this letter is to submit American Centrifuge Operating, LLC's (ACO) supplemental proposed changes to address clarifications discussed with U.S. Nuclear Regulatory Commission's (NRC) staff during a site visit to the Technology Manufacturing Center in Oak Ridge, Tennessee on December 16-17, 2025. provides a detailed description,justification, and ACO's significance determination for the new proposed document. Enclosure 2 provides the proposed changes to NR-SP-ACO-OR-0002, Temporary Construction Security Plan for Oak Ridge, TN. The proposed changes were determined not to decrease the effectiveness of the Security Programs/Plans in accordance with 10 Code of Federal Regulations (CFR) 70.32; however, the proposed changes were determined to be a substantive change in accordance with 10 CFR 95.19 and requires NRC's prior review and approval.

Enclosures 1 and 2 contain Security-Related Information and American Centrifuge Operating, LLC (ACO) requests these enclosures be withheld from public disclosure pursuant to 10 CFR 2.390( d)(l ). S QOjft Information transmitted herewith contains CUI// SP-SRI Security-Related Information-Withhold Under 10 CF'R 2.390 When separated from Enclosures, this letter is uncontrolled.

American Centrifuge Operating, LLC 3930 U.S. Route 23 South - P.O. Box 628 Piketon, OH 45661

CUI// SP-SRI Security-Related Information-Withhold Under 10 CFR 2.390 Anthony Bowers January 15, 2026 ACO 26-0007, Page 2 After the NRC staff has had an opportunity to review the enclosures, ACO is available to support any discussions to address questions, clarify issues, or host additional onsite walkdowns of the proposed construction area. ACO respectfully requests NRC complete their review and approval as soon as practical, to support the ongoing schedule for manufacturing readiness and expansion. If you have any questions regarding this matter, please contact me at (740) 897-3859.

Sincerely, K~

i:J1U Regulatory Manager

Enclosure:

As Stated

Reference:

1. NRC letter from T. Govan to K.L. Fitch regarding Approval of American Centrifuge Operating, LLC's License Amendment Request for a new Temporary Security: Amendment 31 of Special Nuclear Materials License Number SNM-201 l(Enterprise Project Identification Nwnber L-2025-SPR-0006), dated September 18, 2025 cc:

S. Bazian, NRC HQ J. Burns, DOE Idaho Y. Faraz, NRC HQ J. Hutson, NRC Contractor R. Mathis, NRC HQ M. McAnulty, DOE Idaho L. Pitts, NRC Region II M. Reim, DOE-NE S. Rice, NRC Contractor R. Ruppert, NRC HQ T. Vukovinsky, NRC Region II Information transmitted herewith contains CUI// SP-SRI Security-Related Information-Withhold Under to CFR 2.390 When separated from Enclosures, this letter is uncontrolled.