January 6, 2026 Christopher H. Mudrick Senior Vice President and Chief Nuclear Officer Constellation Energy Generation, LLC President Constellation Nuclear 200 Energy Way, KSA-3N Kennett Square, PA 19348

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000220/2025404 AND 05000410/2025404

Dear Christopher Mudrick:

On December 18, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Nine Mile Point Nuclear Station, Units 1 and 2 and discussed the results of this inspection with Tim Peter, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000220 and 05000410 License Nos. DPR-63 and NPF-69

Enclosure:

As stated cc w/ encl: Distribution via ListServ BRICE BICKETT Digitally signed by BRICE BICKETT Date: 2026.01.06 06:47:20 -05'00'

ML26006A008 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRSS RI/DRSS RI/DRSS NAME CDavis TEck BBickett DATE 1/5/2026 1/5/2026 1/6/2026

Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Numbers:

05000220 and 05000410 License Numbers:

DPR-63 and NPF-69 Report Numbers:

05000220/2025404 and 05000410/2025404 Enterprise Identifier: I-2025-404-0020 Licensee:

Constellation Energy Generation, LLC Facility:

Nine Mile Point Nuclear Station, Units 1 and 2 Location:

Oswego, NY Inspection Dates:

December 15, 2025 to December 18, 2025 Inspectors:

T. Eck, Senior Physical Security Inspector C. Davis, Physical Security Inspector Approved By:

Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety & Security

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Nine Mile Point Nuclear Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

3 INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS 71130.02 - Access Control The inspectors evaluated the access control program through completion of the following inspection elements:

Access Control (1 Sample)

(1) 19 Requirements (02.01 c and e, 02.02 c - g, 02.04 a - c and e, 02.05 a, 02.06 a - c, 02.08 e - g, 02.09) 71130.04 - Equipment Performance, Testing, and Maintenance The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) 38 Requirements (02.01 a, 02.02 a - i, 02.03 a - c, 02.04 a - c, f, g, 02.06 a, b, d, e, 02.07 a - d, 02.08 a - e, 02.09 a, 02.09 a, 02.10 a, 02.11 a, c, 02.12 a, 02.14) 71130.07 - Security Training The inspectors evaluated the security training program through completion of the following procedure elements:

Security Training (1 Sample)

(1) 14 Requirements (02.01 a, 02.02 a, b, c, d, f, 02.03 a, b, c, 02.04 a, 02.05 a, b, 02.06 b, 02.10.)

4 71130.09 - Security Plan Changes The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Sample)

(1)

Since the last NRC baseline inspection of this program area, Security Plan Revision 15 to 16 was implemented. Based on Nine Mile Point Nuclear Station's evaluation, and in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.54(p)(2), the changes resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan changes continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those changes. Therefore, the changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE 71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

(1 Sample)

(1)

April 1, 2024 through September 30, 2025.

INSPECTION RESULTS No findings were identified.

EXIT MEETINGS AND DEBRIEFS The inspectors verified that no proprietary information was retained or documented in this report.

On December 18, 2025, the inspectors presented the security baseline inspection results to Tim Peter, Site Vice President, and other members of the licensee staff.

5 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date 71130.02 Corrective Action Documents 04734622 04734888 04759374 04769024 04784422 04816113 04841513 04847532 04868536 Miscellaneous NOSA-NMP-23-01 Security Programs Audit Report AR 4546410 February 8, 2023 Procedures SY-AA-101-106 Control and Classification of Safeguards Information and Sensitive Unclassified Non-Safeguards Information Revision 23 SY-AA-101-112 Constellation Security Search Process Revision 39 SY-AA-101-112-104 Protected Area Search Process Revision 0 SY-AA-101-118 Control of Badges Revision 11 SY-AA-101-120 Control of Security Access Control Devices Revision 10 SY-AA-101-122-103 Performance of Access Control Device and Portal Tests Revision 1 SY-AA-101-132-F-02 Two Person Line of Sight Implementation Checklist Instructions for Security and ERO Revision 3 SY-NM-101-115 Operation of Power Operated Active Vehicle Barriers Revision 7 SY-NM-101-115-101 Nine Mile Point Gate Controls Revision 1 SY-NM-101-119 Off-Site Receiving Warehouse Control at Nine Mile Point Revision 0 SY-NM-101-122-101 Performance of Site Specific Security System Tests Revision 1 71130.04 Miscellaneous 2023 Record of Semi-Annual Functionality and Accuracy Tests and Firearm Maintenance Logs 2025 Record of Semi-Annual Functionality and Accuracy Tests and Firearm Maintenance Logs

6 Inspection Procedure Type Designation Description or Title Revision or Date 2024 Record of Semi-Annual Functionality and Accuracy Tests and Firearm Maintenance Logs N1 S250001PWSUP003 NMP Security UPS Vendor Manual SY-AA-150-103 Firearms Maintenance, Testing and Accountability Revision 3 SY-AA-500-127 Safety/Security Interface Revision 7 Procedures SY-AA-101-122 Testing Security Equipment Revision 22 SY-AA-101-122-101 Performance of Perimeter Intrusion Detection/Camera System Tests Revision 1 SY-AA-150-103 Firearms Maintenance, Testing, and Accountability Revision 3 SY-NM-101-102-1001 NMP Compensating for Security System Failures Revision 14 SY-NM-101-122-101 Performance of Site Specific Security System Tests Revision 2 71130.07 Corrective Action Documents 04759988 04765445 04798700 Miscellaneous Nine Mile Point Tactical Course (PowerPoint Presentation) 4101-PP-R0 Weapons Safety Fundamentals 4105-PP-R0 Rifle Marksmanship, Tactical and Night Familiarization Firing 4106-PP-R0 Tactical Weapons Training N-AN-SY-LP-4301X Annual Written Exam Procedures SY-AA-150-101 Constellation Nuclear Security Training Revision 4 SY-AA-150-104 Constellation Nuclear Security OJT Program Revision 3 SY-AA-152 Tactical Course Development, Approval & Conduct Revision 7 Self-Assessments NOSA-NMP-25-01 Security Programs Audit 71130.09 Corrective Action Documents 04831687 Procedures Nine Mile Point Nuclear Station Physical Security, Safeguards Contingency, Security Training and Qualification Plan, and Security Program for the Nine Mile Point Independent Spent Fuel Storage Installation.

Revision 16