Email to Phil Lashley Subject Draft Safety Evaluation for the SMR-300 Design Basis Accident Radiological Consequences Analysis Methodology Licensing Topical Report (EPID L-2025-TOP-0019) Dated December 22, 2025. 2) ML25345A481
ML25357A039
Person / Time
Site: 99902049
Issue date: 12/22/2025
From: Victoria Huckabay
NRC/NRR/DNRL/NLIB
To: Lashley P
Holtec
Shared Package
ML25357A038 List:
References
EPID L-2025-TOP-0019
Download: ML25357A039 (0)


Text

From:

Victoria Huckabay To:

Phil Lashley Cc:

ext_Monica_Haneman; Michelle Hayes

Subject:

Draft Safety Evaluation for the SMR-300 Design Basis Accident Radiological Consequences Analysis Methodology Licensing Topical Report (EPID L-2025-TOP-0019)

Date:

Monday, December 22, 2025 10:28:00 AM

Dear Mr. Lashley,

By letter dated June 6, 2025, SMR, LLC (SMR), a Holtec International Company (Holtec),

submitted Licensing Topical Report (LTR) HI-2241098, Revision 0, SMR-300 Design Basis Accident Radiological Consequences Analysis Methodology Licensing Topical Report (Agencywide Document Access Management Systems Accession No ML25157A142) to the U.S. Nuclear Regulatory Commission (NRC) for review and approval. The NRC staff accepted the LTR for review on June 26, 2025 (ML25161A170). From August 15, 2025, through August 29, 2025, the NRC staff conducted an audit to gain a detailed understanding of the LTR methodology and identify any additional information that required docketing to support the NRC staffs safety evaluation (SE) for the LTR (ML25181A199 and ML25237A021). By letter dated September 5, 2025, SMR (Holtec) submitted Revision 1 of the LTR (ML25248A283) that addressed items discussed during the NRC staffs audit. The audit report summarizing the NRC staffs observations was issued on September 23, 2025 (ML25258A007).

The NRC staff completed its review of the SMR (Holtecs) subject LTR and prepared a draft SE. A copy of the draft SE has been uploaded on the external sharing SharePoint site so that SMR (Holtec) can compete a proprietary and factual review. Your response is requested back to the NRC within 10 business days from the date of this email. The final SE will be issued after making any necessary changes once the NRC staff receives feedback from SMR (Holtec).

If you have any questions regarding this matter, please do not hesitate to contact me at Victoria.Huckabay@nrc.gov.

Victoria

Victoria V. Huckabay Senior Project Manager NRR/DNRL/NLIB (301) 415-5183