From:
John Lamb Sent:
Monday, December 22, 2025 12:16 PM To:
Quarles, Adam Graham Cc:
Joyce, Ryan M.; Michael Markley; John Klos; Dawnmathews Kalathiveettil; Tony Sierra
Subject:
FYI - Acceptance Review - Hatch 1 and 2 - LAR to Adopt TSTF-576 "Revise Safety/Relief Valve Requirements" (L-2025-LLA-0190)
- Adam, By letter dated December 5, 2025 (ML25339A156), Southern Nuclear Operating Company (SNC, the licensee) submitted a license amendment request (LAR) for Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2. The proposed LAR by SNC requests adoption of Technical Specification Task Force (TSTF)-576, Revise Safety/Relief Valve Requirements. The proposed change revises the Safety/Relief Valve Technical Specification (TS) to align the overpressure protection requirements with the safety limits and the regulations.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for a LAR (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your LAR and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed LAR in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this LAR will take approximately 140 hours0.00162 days <br />0.0389 hours <br />2.314815e-4 weeks <br />5.327e-5 months <br /> to complete using the GEM approach for a typical review. The NRC staff expects to complete this review by June 22, 2026. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the LAR and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me.
John G. Lamb, Senior Project Manager Plant Licensing Branch 2-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Hearing Identifier:
NRR_DRMA Email Number:
2828 Mail Envelope Properties (MN2PR09MB508410DA3435B84C7D24A0CFFAB4A)
Subject:
FYI - Acceptance Review - Hatch 1 and 2 - LAR to Adopt TSTF-576 Revise SafetyRelief Valve Requirements (L-2025-LLA-0190)
Sent Date:
12/22/2025 12:16:09 PM Received Date:
12/22/2025 12:16:00 PM From:
John Lamb Created By:
John.Lamb@nrc.gov Recipients:
"Joyce, Ryan M." <rmjoyce@southernco.com>
Tracking Status: None "Michael Markley" <Michael.Markley@nrc.gov>
Tracking Status: None "John Klos" <John.Klos@nrc.gov>
Tracking Status: None "Dawnmathews Kalathiveettil" <Dawnmathews.Kalathiveettil@nrc.gov>
Tracking Status: None "Tony Sierra" <Tony.Sierra@nrc.gov>
Tracking Status: None "Quarles, Adam Graham" <agquarle@southernco.com>
Tracking Status: None Post Office:
MN2PR09MB5084.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3506 12/22/2025 12:16:00 PM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: