NRC Form 898 Topical Report Completeness Determination - Terra Innovatum Quality Assurance
ML25350C300
Person / Time
Site: 99902138
Issue date: 01/06/2026
From: Tulip J
NRC/NRR/DANU/UAL1
To:
References
EPID L-2025-TOP-0037, SOLO-TR-2025-9
Download: ML25350C300 (0)


Text

NRC FORM 898 0

U.S. NUCLEAR REGULATORY COMMISSION (01-2021)

¥*~

a l

i Topical Report Completeness Determination

\

I

+-,

+O Topical Report Information Review Information Report Number:

lsoLO-TR-2025-9 I

NRR/DANU/UAL 1 (PM)

Office/Division/

NRR/DANU/UTB1 & UTB 3 (Technical Branch:

Reviewers)

Title:

SOLO Project Quality Plan IML25257A012 I Project Manager:

Jacqueline Tulip ADAMS Accession Number:

EPID:

I L-2025-TOP-0037 I

199902138 I

Reviewers:

John Matrachisia, Vince Voltaggio Docket Number:

Review Type:

D Standard

[Z] Compressed ADAMS Accession Numbers (Top row is for transmittal of this form)

Package: ML I 25350C296 I E-mail: ML I 25350C301 I This Form: MLI 25350C300 I

Withholding Determination: ML I

N/A I Fee Waiver: ML I

NIA I

Topical Reports for Review 0

The NRC staff has performed an acceptance review of the subject topical report. We have found that the material presented is sufficient to begin our review. The dates below are based on current resources, if they change the NRC staff will contact you.

Information for Topical Reports That Are Found Acceptable for Review Requests for Additional Information: :

Issue Dates For 1411012026

Draft Safety Evaluation::

I Issue Dates For 171312026 I

Review hours total includes project management and contractor time: I 270 I

Topical Reports Not Acceptable for Review Based on its review of the information provided, the NRC staff cannot find sufficient details in the submittal to allow the staff to evaluate the proposed topical report.

D [Only for Use with Topical Reports in Standard Review Process] Although the NRC staff has found the current topical report is not sufficiently detailed to begin our review, the sponsor can supplement the submittal with additional information. The additional information should be submitted within 60 days the date of this form.

Basis for Nonacceptance:

Additional Information Needed: