ML25349A115
Jump to navigation
Jump to search
| ML25349A115 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 12/15/2025 |
| From: | NRC/RGN-III/DORS/OB |
| To: | Xcel Energy |
| Gregory Roach | |
| Shared Package | |
| ML23202A206 | List: |
| References | |
| Download: ML25349A115 (0) | |
Text
Form 5.1-1 Post examination Check Sheet Post examination Check Sheet Facility: Prairie Island Dates of Examination: 11/10-17/2025 Activity Description Date Complete
- 1. *Received post examination package from facility licensee and verified complete. (ES-4.4) 11/20/2025
- 2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 11/21/2025
- 3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.
(ES-3.6) 12/03/2025
- 4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 12/03/2025
- 5. Completed licensing official review.
12/08/2025
- 6. Mailed licenses, preliminary results, and pass letters.
12/10/2025
- 7. Notified facility licensee of results.
12/08/2025
- 8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).
12/12/2025
- 9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.
N/A
- 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
12/15/2025
- Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.