IR 05000277/2026402

From kanterella
(Redirected from ML25322A171)
Jump to navigation Jump to search
Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000277/2026402 and 05000278/2026402
ML25322A171
Person / Time
Site: Peach Bottom  
Issue date: 11/18/2025
From: Glenn Dentel
Division of Operating Reactors
To: Murdick C
Constellation Energy Generation
References
IR 2026402
Download: ML25322A171 (1)


Text

November 18, 2025

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 -

INFORMATION REQUEST FOR THE CYBERSECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000277/2026402 AND 05000278/2026402

Dear Christopher Murdick:

On March 16, 2026, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline inspection in accordance with Inspection Procedure (IP) 71130.10, Cybersecurity, dated December 14, 2021, at Peach Bottom Atomic Power Station, Units 2 and 3. The inspection will be performed to evaluate and verify your ability to meet the requirements of the NRCs Cybersecurity Rule, Title 10 of the Code of Federal Regulations (10 CFR), Part 73, Section 54, Protection of Digital Computer and Communication Systems and Networks. The onsite portions of the inspection will take place from March 16 through 20, 2026.

Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., sample set) to be inspected by IP 71130.10. This information should be made available either on an online repository (preferred) or digital media (CD/DVD) no later than December 19, 2025. The inspection team will review this information and, by January 16, 2026, will request the specific items that should be provided for review.

The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of the licensees cybersecurity program selected for the cybersecurity inspection.

This information will be requested for review in the regional office prior to the inspection by February 13, 2026, as identified above.

The third group of requested documents consists of those items that the inspection team will review, or need access to, during the inspection. Please have this information available by the first day of the onsite inspection, March 16, 2026. The fourth group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection.

It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. If any of the provided information changes between the time of submittal and the inspection, please inform the inspection team lead.

The lead inspector for this inspection is Louis Dumont. We understand that our regulatory contact for this inspection is Amy Huber of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at (610) 337-5183 or via email at Louis.Dumont@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety

Docket Nos. 05000277 and 05000278 License Nos. DPR-44 and DPR-56

Enclosure:

Cybersecurity Inspection Document Request

cc: Distribution via ListServ

GLENN DENTEL Digitally signed by GLENN DENTEL Date: 2025.11.18 09:59:52 -05'00'

ML25322A171

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DORS RI/DORS

NAME LDumont GDentel

DATE 11/17/2025 11/18/2025

PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 CYBERSECURITY INSPECTION DOCUMENT REQUEST Enclosure

Inspection Report:

05000277/2026402 and 05000278/2026402

Inspection Dates:

March 16-20, 2026

Inspection Procedure:

IP 71130.10, Cybersecurity, dated December 14, 2021

(ADAMS Accession Number: ML21271A106)

Reference:

Guidance Document for Development of the Request for Information (RFI) and Notification Letter for IP 71130.10, Cybersecurity (ML21330A088)

NRC Inspectors:

Louis Dumont, Lead Eric Miller (610) 337-5183 (610) 337-5116 Louis.Dumont@nrc.gov Eric.Miller2@nrc.gov

NRC Contractor:

Justin Bowden

Justin.Bowden@nrc.gov

I.

Information Requested for In-Office Preparation The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cybersecurity Program (CSP) elements to develop a site-specific inspection plan. The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management security control portions of the CSP to be chosen as the sample set required to be inspected by the cybersecurity inspection procedure. The first RFIs requested information is specified below in Table RFI #1. The Table RFI #1 information is requested to be provided to the regional office by December 19, 2025, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up request to develop the second RFI. The inspection team will submit the specific systems and equipment list to your staff by January 16, 2026, which will identify the specific systems and equipment that will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cybersecurity inspection. We request that the additional information provided from the second RFI be made available to the regional office prior to the inspection by February 13, 2026.

PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 CYBERSECURITY INSPECTION DOCUMENT REQUEST

The required Table RFI 1 information shall be provided on an online repository (preferred) or digital media (CD/DVD) to the lead inspector by December 19, 2025. The preferred file format for all lists is a searchable Excel spreadsheet file. The information should be indexed and hyperlinked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.

Table RFI #1 Section 3, Paragraph Number / Title:

IP Ref

A list of all Identified Critical Systems and Critical Digital Assets - highlight /

note any additions, deletions, or reclassifications due to new guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last cybersecurity inspection.

Overall

A list of emergency preparedness and Security onsite and offsite digital communication systems.

Overall

Network Topology Diagrams to include information and data flow for critical systems in levels 2, 3 and 4 (If available).

Overall

Ongoing Monitoring and Assessment program documentation.

03.01(a)

The most recent effectiveness analysis of the Cybersecurity Program.

03.01(b)

Vulnerability screening / assessment and scan program documentation.

03.01(c)

7 Device Access and Key Control program documentation.

03.02(c)

Password / Authenticator program documentation.

03.02(c)

User Account / Credential program documentation.

03.02(d)

10 Portable Media and Mobile Device control program documentation, including kiosk security control assessment / documentation.

03.02(e)

Design change / modification program documentation and a list of all design changes completed (field complete) since the last cybersecurity inspection, including either a summary of the design change or the 50.59 documentation for the change.

03.03(a)

Supply Chain Management documentation.

03.03(a),

(b) and (c)

Configuration Management program documentation.

03.03(a)

and (b)

Cybersecurity Metrics tracked (if applicable).

03.06 (b)

Provide documentation describing any cybersecurity changes to the access authorization program since the last cybersecurity inspection.

Overall

Provide a list of all procedures and policies provided to the NRC as part of this RFI with their descriptive name and associated procedure number (if available).

Overall

Performance testing report (if applicable).

03.06 (a)

List of Condition Reports (or similar) associated with cybersecurity issues written since the last inspection. Please include CR #, date written, and a short description / title.

Overall In addition to the above information please provide the following:

PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 CYBERSECURITY INSPECTION DOCUMENT REQUEST

(1) Name(s) and phone numbers for the regulatory and technical contacts.

(2) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of specific systems and equipment to your staff by January 16, 2026, for the second RFI (i.e., RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by January 16, 2026, for the second RFI (i.e., RFI #2). The second RFI will request additional information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cybersecurity inspection. The additional information requested for the specific systems and equipment is identified in Table RFI #2.

The Table RFI 2 information shall be provided to the lead inspector by February 13, 2026. The preferred file format for all lists is a searchable Excel spreadsheet. The information should be indexed and hyperlinked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.

Table RFI #2 Section 3, Paragraph Number / Title:

Items For the systems and CDAs chosen for inspection provide:

1 Ongoing Monitoring and Assessment activity performed on the system(s).

03.01(a)

2 All Security Control Assessments for the selected CDAs.

03.01(a)

All vulnerability screenings / assessments associated with or scans performed on the selected system(s) since the last cybersecurity inspection.

03.01(c)

Documentation (including configuration files and rules sets) for Network-based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based Intrusion Detection Systems (HIDS), and Security Information and Event Management (SIEM) systems for system(s) chosen for inspection.

03.02(b)

Documentation (including configuration files and rule sets) for intra-security level firewalls and boundary devices used to protect the selected system(s).

03.02(c)

6 Copies of all periodic reviews of the access authorization list for the selected systems since the last inspection.

03.02(d)

7 Baseline configuration data sheets for the selected CDAs.

03.03(a)

8 Documentation on any changes, including Security Impact Analyses, performed on the selected system(s) since the last inspection.

03.03(b)

9 Copies of the purchase order documentation for any new equipment purchased for the selected systems since the last inspection.

03.03(c)

PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 CYBERSECURITY INSPECTION DOCUMENT REQUEST

Table RFI #2 Section 3, Paragraph Number / Title:

Items 10 For the selected systems, provide design change / modification packages including completed work orders since the last cybersecurity inspection.

03.03(a)

III.

Information Requested to be Available on First Day of Inspection For the specific systems and equipment identified in Section II above, provide the following RFI (i.e., Table 1ST Week Onsite) to the team by March 16, 2025, the first day of the inspection.

Please provide the following:

(1) Copies of the following documents do not need to be specifically available to the inspection team as long as the inspectors have easy and unrestrained access to them.

a. Quality Assurance (QA) Plan.

b. Latest individual plant examination/probabilistic risk assessment report.

c. The most recent Cybersecurity QA audit and/or self-assessment.

d. Corrective action documents (e.g., condition reports, including status of corrective actions) generated as a result of the most recent Cybersecurity QA audit and/or self-assessment.

IV.

Information Requested to be Provided Throughout the Inspection (1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection team leader.