Notification of Commercial Grade Dedication Inspection (05000334/2026010 and 05000412/2026010) and Request for Information
ML25322A120
Person / Time
Site: Beaver Valley
Issue date: 11/18/2025
From: Glenn Dentel
Division of Operating Reactors
To: Blair B
Vistra Operations Company
References
IR 2026010
Download: ML25322A120 (1)


See also: IR 05000334/2026010

Text

November 18, 2025

Barry Blair

Senior Vice President

Vistra Operations Company, LLC

Beaver Valley Power Station

P.O. Box 4 - Route 168

Shippingport, PA 15077-0004

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - NOTIFICATION OF

COMMERCIAL GRADE DEDICATION INSPECTION (05000334/2026010 AND

05000412/2026010) AND REQUEST FOR INFORMATION

Dear Barry Blair:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct the commercial grade dedication baseline inspection at Beaver Valley Power

Station, Units 1 and 2 (Beaver Valley), beginning on February 9, 2026. The inspection team will

be composed of three personnel from the NRC Region I office. The inspection will be conducted

in accordance with NRC Inspection Procedure 71111.21N.03, Commercial Grade Dedication,

dated February 16, 2023.

The inspection will evaluate the implementation of Beaver Valleys process for dedicating

commercial-grade items, as required in applicable portions of Appendix B to Title 10 of the Code

of Federal Regulations (10 CFR) Part 50, to ensure reasonable assurance is provided that

these items will perform their intended safety function. Additionally, this inspection will evaluate

implementation of Beaver Valleys procurement process for safety-related components as

required in Appendix B.

The inspection will include an onsite information gathering visit by the team lead and two weeks

of onsite inspection by the team. The schedule for the inspection is as follows:

Offsite Information Gathering Week: January 12-16, 2026

Offsite Preparation Week: February 2-6, 2026

Onsite Inspection Weeks: February 9-13, 2026, and February 23-27, 2026

The purpose of the offsite information gathering week is to virtually meet with staff expected to

support this inspection, and to become familiar with the process for dedicating commercial-

grade items and the process for procuring safety-related components at Beaver Valley. We are

aware that portions of the commercial grade dedication and safety-related procurement process

may be handled at locations other than your site, and we will coordinate the best dates, times,

and location(s) for the offsite information gathering week with your staff. This week may include

discussions with staff regarding onsite commercial-grade item dedication facilities, receipt

B. Blair

2

inspection facilities, storage facilities, and installed plant components associated with potential

inspection samples. The team lead will also review your plans for onsite inspection logistics

including resources that will be provided to the team while onsite (e.g., conference rooms,

network access, printers, monitors, etc.) and how information requests will be tracked and

processed.

To minimize the impact on your staff and to ensure a productive inspection, we have enclosed

two separate requests for information needed prior to the offsite information gathering week and

offsite inspection preparation week. The first request (Enclosure 1) is generally for information

that will be used to choose the inspection samples or information that will be applicable to all

inspection samples throughout the inspection. This information should be made available to the

team lead before January 12, 2026. The team lead will use this information to support

preparation for the offsite information gathering week and selection of a list of potential

inspection samples. The second request (Enclosure 2) is for information that is more specific to

the selected inspection samples, and should be made available before February 2, 2026.

Additional information requests, interviews with your staff, and/or walkdowns of facilities or

installed plant components will be made by the team throughout the inspection to complete their

review of the selected inspection samples. It is important that all documentation provided to the

team is complete and up-to-date to minimize the number of additional documents requested

during the preparation and/or the onsite portions of the inspection. Additionally, to facilitate an

efficient inspection, we request that a contact individual be assigned to each inspector to ensure

information requests, questions, and concerns are addressed in a timely manner.

If there are any questions about the inspection or the information requested, please contact the

team lead, Eric C. Miller, by telephone at (610) 337-5116 or by email at Eric.Miller2@nrc.gov.

Enclosure 3 contains additional contact information for the inspection team.

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC

20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of

Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to a request for

information or an information collection requirement unless the requesting document displays a

currently valid OMB control number.

B. Blair

3

This letter, its enclosures, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Sincerely,

Glenn T. Dentel, Chief

Engineering Branch 2

Division of Operating Reactor Safety

Docket No. 05000334 and 05000412

License No. DPR-66 and NPF-73

Enclosures:

1. Documents Requested Prior to

Information Gathering Visit

2. Documents Requested Prior to

Inspection Preparation Week

3. Inspection Team Contact Information

cc w/ encls: Distribution via ListServ

GLENN

DENTEL

Digitally signed by

GLENN DENTEL

Date: 2025.11.18

09:57:39 -05'00'

ML25322A120

SUNSI Review

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available

OFFICE RI/DORS

RI/DORS

NAME

EMiller

GDentel

DATE

11/18/2025

11/18/2025

Enclosure 1

Enclosure 1

Documents Requested Prior to Information Gathering Visit

The documents and information requested below should generally be made available to the

inspection team for the team's use both onsite and offsite during the information gathering visit.

Electronic format is the preferred media. If electronic media is made available via an internet

based remote document management system, then the remote document access must allow

inspectors to download, save, and print the documents in the NRC's regional office. Electronic

media on compact disc or paper records (hard copy) are acceptable. At the end of the

inspection, the documents in the team's possession will not be retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all of the

listed documents. In addition, your plant specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below.

Documents requested by January 12, 2026 (Prior to the Information Gathering Week):

1.

Procedures for dedicating commercial-grade items and for procurement of safety-

related components. This should include procedures for controlling counterfeit,

fraudulent, and suspect items and, if applicable, procedures that address

requirements associated with the parts quality initiative.

2.

List of commercial-grade items, with a brief description of application, that have been

dedicated for safety-related applications. These items may be dedicated by

Beaver Valley Power Station, Units 1 and 2 or dedicated by a vendor (or other

licensee) and procured by Beaver Valley Power Station, Units 1 and 2. Please note

whether the item has been installed in the plant. The list should encompass the past

six years of dedication activities. The list should identify the systems/components

where the items were installed or were intended to be installed for use. It should also

identify whether the item has been installed.

3.

List of components procured as safety-related, with descriptions, if not included

above. Please note whether the item has been installed in the plant. The list should

encompass the past six years of procurement activities. The list should identify the

systems/components where the items were installed or were intended to be installed

for use. It should also identify whether the item has been installed.

4.

List of corrective action program documents, with descriptions, associated with

commercial-grade items, safety-related procurement, receipt, or storage. The list

should include any items that failed while in service after completing the dedication

or safety-related procurement process. It should encompass the past six years of

these activities and should identify the systems/components where the items were

installed. The list should also identify the vendor who supplied the associated item.

2

5.

List components procured as safety-related or commercial-grade items intended to

be dedicated for safety-related applications that are on hold because of concerns

identified during receipt, dedication, or from operating experience/corrective action

program as applicable. The list should identify the systems/components where the

items were intended to be installed for use.

6.

List of components procured as commercial-grade items dedicated for safety-related

applications, in the past six years, where the procurement/dedication process was

expedited to support rapid turnaround (less than seven days). If possible, the list

should identify the systems in which these items were intended for use.

7.

List of systems, system numbers/designators, corresponding names, and risk-

ranking.

8.

Copies of any self-assessments/audits of the safety-related procurement or the

commercial-grade dedication and procurement processes that were completed within

the two-years prior to the start date of this inspection.

9.

List of site contacts that will be associated with the inspection and a copy of

qualifications, as applicable, of personnel who performed commercial-grade

dedication, safety-related component procurement, and/or receipt inspection/testing

activities within the past six years.

Enclosure 2

Enclosure 2

Documents Requested Prior to Inspection Preparation Week

For the samples selected by the team lead and provided to your point of contact following the

information gathering visit, the documents and information requested below should generally be

made available to the inspection team for the team's use both onsite and offsite during the

inspection. Electronic format is the preferred media. If electronic media is made available via an

internet based remote document management system, then the remote document access must

allow inspectors to download, save, and print the documents in the NRC's regional office. Paper

records (hard copy) are acceptable when necessary. At the end of the inspection, the

documents in the team's possession will not be retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all of the

listed documents. In addition, your plant specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below for

each sample.

Documents requested by February 2, 2026 (Prior to Preparation Week):

1.

Purchase requisition and purchase orders.

2.

Other pertinent vendor/licensee correspondence.

3.

Original and updated design specifications.

4.

Catalog specifications.

5.

Procurement basis evaluation such as like-for-like, equivalency, plant design change

packages, drawing and specification updates.

6.

Title 10 of the Code of Federal Regulations (10 CFR) 50.59 documentation, if

required.

7.

Material receiving reports, packing lists/invoices, and other shipping documents.

8.

Receipt inspection reports and any related test reports.

9.

Other documents to trace the item from the time it was dedicated to the time it was

installed, tested, and accepted.

10.

Certificates of conformance/compliance/quality.

11.

Vendor test and inspection reports.

12.

Third-party or sub vendor test and inspection reports.

13.

Shelf-life information.

14.

Vendor dedication/partial dedication information.

2

15.

Design/material/process change history information.

16.

Completed commercial-grade dedication document including safety classification,

identification of safety functions/application requirements, identification of critical

characteristics, identification of verification methods and acceptance criteria for the

critical characteristics, evaluation of credible failure modes, if applicable, and

identification of the suppliers quality assurance program that meets 10 CFR 50,

Appendix B.

17.

Any deviation from design, material, and performance characteristics relevant to the

safety function (nonconformance dispositions).

18.

Documents showing objective evidence such as special test and inspection

procedures and results, commercial-grade survey reports-item, design, material, and

specific performance characteristic (relevant to safety function), and source

inspection reports.

19.

Completed post-installation test procedure and results.

20.

Completed stock or material issue forms and installation work orders or reports.

21.

Historical performance information.

Enclosure 3

Enclosure 3

Inspection Team Contact Information

Eric C. Miller (Lead)

Senior Reactor Inspector

(610) 337-5116

Eric.Miller2@nrc.gov

Joseph Cunningham

Reactor Inspector

(610) 337-5390

Joseph.Cunningham@nrc.gov

Andrey Turilin

Reactor Inspector

(610) 337--5177

Andrey.Turilin@nrc.gov

Mailing Address:

U.S. NRC, Region I

Attn: Eric C. Miller

475 Allendale Road

STE 102

King of Prussia, PA 19406-1415