Summary of Westinghouse Electric Company 2025 Fuel Performance Update Closed Meeting
ML25268A060
Person / Time
Site: Westinghouse
Issue date: 11/14/2025
From: Ekaterina Lenning
Licensing Processes Branch
To: Jennivine Rankin
Licensing Processes Branch
References
EPID L-2025-NTM-0003
Download: ML25268A060 (1)


Text

November 14, 2025 MEMORANDUM TO:

Jennivine K. Rankin, Branch Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Ekaterina Lenning, Project Manager

/RA/

Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF WESTINGHOUSE ELECTRIC COMPANY 2025 FUEL PERFORMANCE UPDATE CLOSED MEETING (EPID L-2025-NTM-0003)

On September 9, 2025, a closed annual hybrid meeting between Westinghouse Electric Company (Westinghouse) representatives and U.S. Nuclear Regulatory Commission (NRC) staff was held to discuss proprietary information related to Westinghouse fuel performance and future topical report (TR) submittals. The Westinghouse representatives shared Westinghouses perspectives on the increased enrichment (IE) rulemaking along with an overview of the industrys messaging and feedback from IE workshops. As part of the same presentation, the Westinghouse representatives discussed FULL SPECTRUM' loss-of-coolant accident (LOCA) and beyond design basis LOCA analysis along with the Electric Power Research Institute Alternative Licensing Strategy for fuel dispersal timeline. The Westinghouse representatives provided updates on Westinghouse EnCore high energy fuel and accident tolerant fuel programs and boiling water reactor (BWR) control rod blade performance including the details on a planned TR. Additionally, Westinghouse representatives provided updates on pressurized water reactor (PWR) fuel performance codes and methods, BWR fuel performance codes and methods including BWR technology roadmap, and the departure from nucleate boiling predictive modeling using machine learning technology. The Westinghouse representatives concluded the presentations with an overview of time-at-temperature initiative for PWR and BWRs, Westinghouse methodologies applicable to core operating limits reports, and updates on eVinci microreactor including details on future license application submittal and TRs plans. The NRC staff also participated in the tour of Westinghouse eVinci facility.

By letter dated September 3, 2025, Westinghouse submitted presentation slides to the NRC (Agencywide Documents Access and Management System (ADAMS) Accession No. ML25247A227). The meeting notice (ML25251A099) is available in ADAMS. The list of meeting attendees is enclosed.

Enclosure:

List of Attendees CONTACT:

Ekaterina Lenning, NRR/DORL Ekaterina.Lenning@nrc.gov 301-415-3151

Enclosure ATTENDEES LIST FOR THE CLOSED MEETING BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND WESTINGHOUSE ELECTRIC COMPANY 2025 FUEL PERFORMANCE UPDATE SEPTEMBER 9, 2025 8:30 AM - 4:45 PM EASTERN TIME Attendees Organization Victor Cusumano U. S. Nuclear Regulatory Commission (NRC)

Aida Rivera-Varona NRC Jennivine Rankin NRC Scott Krepel NRC Ekaterina Lenning NRC Ankur Bhattacharya NRC Daniel King NRC Michael Benson NRC Jonathan Marcano Lozada NRC John Lehning NRC Jeremy Dean NRC Richard Fu NRC James Delosreyes NRC Gokul Vasudevamurthy NRC Joseph Messina NRC Lucieann Vechioli Feliciano NRC Patrick Boyle NRC Adam Rau NRC Joshua Kaizer NRC Noushin Amini NRC Antonio Barrett NRC Brandon Wise NRC Jack Vande Polder NRC Aaron Armstrong NRC Andrew Bielen NRC John Budzynski NRC James Corson NRC Alice Chung NRC Zhian Li NRC Jerrod Ewing Westinghouse Electric Company (Westinghouse)

Camille Zozula Westinghouse Nathaniel Mackereth Westinghouse Joshua Yagozinski Westinghouse Parvez Khambatta Westinghouse Kevin Barber Westinghouse Brian Kleinfeldt Westinghouse Virginia Lilly Westinghouse Attendees Organization Matthew Leonard Westinghouse Pyry Savolainen Westinghouse Sukhwans Singh Westinghouse Pyry Savolainen Westinghouse Michael Boone Westinghouse Jeffrey Kobelak Westinghouse Kevin Lasswell Westinghouse Yixing Sung Westinghouse Lauren Wirick Westinghouse Julia Leonelli Westinghouse Zeses Karoutas Westinghouse Melanie Arnold Westinghouse Victoria Mott Westinghouse Emre Tatli Westinghouse James Smith Westinghouse Jason Smith Westinghouse Stephen Castellino American Electric Power Thomas Remick Arizona Public Service (APS)

Don Buth APS Rosanne Carmean Constellation Energy Nuclear Christopher Clemens Dominion Energy Cailyn Ludwig Dominion Energy Brian Vitiello Dominion Energy Michael Blom Duke Energy David Addington Entergy Scott Stanchfield Entergy Benone Lohan Florida Power and Light company (FPL)/NextEra Energy Isaac Sayre FPL/NextEra Energy Jennifer Baker Xcel Energy Melissa Limbeck Xcel Energy Jason Douglass Southern Nuclear Operating Company, Inc.

Doug Brown Vistra

ML25268A061 (Package)

ML25251A099 (Notice)

ML25268A060 (Meeting Summary)

OFFICE NRR/DORL/LLPB/PM NRR/DORL/LLPB/LA NRR/DORL/LLPB/BC NRR/DORL/LLPB/PM NAME ELenning DHarrison JRankin ELenning DATE 9/25/2025 9/30/2025 11/13/2025 11/14/2025