ML25254A233

From kanterella
Jump to navigation Jump to search
Attachment 4: HI-STORM FW CoC Appendix a Revised Page
ML25254A233
Person / Time
Site: 07201032
Issue date: 09/11/2025
From:
Holtec
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML25254A228 List:
References
5018126
Download: ML25254A233 (1)


Text

Programs 5.0 Certificate of Compliance No. 1032 Proposed Amendment No. 710 Appendix A 5.0-3 5.0 ADMINISTRATIVE CONTROLS AND PROGRAMS (continued) 5.2 Transport Evaluation Program (continued)

Table 5-1. TRANSFER CASK and VENTILATED OVERPACK Lifting Requirements.

ITEM ORIENTATION LIFTING HEIGHT LIMIT (in.)

TRANSFER CASK VERTICAL 11 TRANSFER CASK HORIZONTAL None Established (Note 1)

VENTILATED OVERPACK VERTICAL 11 VENTILATED OVERPACK HORIZONTAL Not Permitted Note 1: See Technical Specification 5.2.c.4.b. to Holtec Letter 5018126 NON-PROPRIETARY INFORMATION Page 1 of 1