Shawn Hafen Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
UPDATED INSPECTION PLAN FOR MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 (REPORT 05000263/2025005)
Dear Shawn Hafen:
The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Monticello Nuclear Generating Plant, Unit 1. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the ROP is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.
August 22, 2025
S. Hafen 2
This letter and its enclosure will be made available for public inspection and copying at ADAMS Public Documents l NRC.gov and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at 630-829-9803 with any questions you have regarding this letter.
Sincerely, Dariusz Szwarc, Chief Reactor Projects Branch 3 Division of Operating Reactor Safety Docket Nos. 05000263 and 07200058 License No. DPR-22
Enclosure:
Inspection Plan cc: Distribution via LISTSERV Signed by Szwarc, Dariusz on 08/22/25
S. Hafen 3
Letter to Shawn Hafen from Dariusz Szwarc dated August 22, 2025.
SUBJECT:
UPDATED INSPECTION PLAN FOR MONTICELLO NUCLEAR GENERATING PLANT, UNIT 1 (REPORT 05000263/2025005)
DISTRIBUTION:
Rodney Clagg RidsNrrDorlLpl3 RidsNrrPMMonticello RidsNrrDroIrib Resource Jack Giessner Mohammed Shuaibi Diana Betancourt-Roldan John Pelchat Jared Heck Jennifer Dalzell R3-DORS ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML25233A272
SUNSI Review
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available OFFICE R-III NAME DSzwarc:anm DATE 08/22/2025 OFFICIAL RECORD COPY
Site Inspection Activity Plan Monticello 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Security Baseline Inspection - MON 1
1 7/28/2025 8/1/2025 IP 71130.02 000734 Access Control 1
7/28/2025 8/1/2025 IP 71130.07 000739 Security Training Radiation Protection Baseline Inspection 2
1 8/4/2025 8/8/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1
8/4/2025 8/8/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program 1
8/4/2025 8/8/2025 IP 71151 000746 Performance Indicator Verification Emergency Preparedness Exercise Inspection / Performance Indicator Review - MON 5
1 6/1/2025 8/15/2025 IP 71114.08 000723 Exercise Evaluation - Scenario Review 1
8/11/2025 8/15/2025 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event 1
8/11/2025 8/15/2025 IP 71151 001397 Performance Indicator Verification Comprehensive Engineering Team Inspection - MON 7
1 8/25/2025 9/12/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection Monticello 2025 Licensed Operator Biennial Requalification Program Inspection 2
1 10/19/2025 10/25/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Eplan and EAL Changes Review - MON 1
1 11/1/2025 12/31/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Security Baseline Inspection - MON 1
1 2/23/2026 2/27/2026 IP 71130.01 000733 Access Authorization 1
2/23/2026 2/27/2026 IP 71130.02 000734 Access Control 1
2/23/2026 2/27/2026 IP 71130.08 000740 Fitness-For-Duty Program Functional Engineering Inspection - Fire Protection - MON 3
1 4/13/2026 5/1/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Emergency Preparedness Baseline Inspection / Performance Indicator Verification - MON 1
1 4/13/2026 4/17/2026 IP 71114.02 000717 Alert and Notification System Testing 1
4/13/2026 4/17/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1
4/13/2026 4/17/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness 1
4/13/2026 4/17/2026 IP 71151 001397 Performance Indicator Verification Radiation Protection Baseline Inspection - MON 1
1 5/18/2026 5/22/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Security Baseline Inspection - MON 1
1 5/18/2026 5/22/2026 IP 71130.14 000743 Review of Power Reactor Target Sets Prepared on 8/18/2025 10:17:27 AM 1 of 3
Site Inspection Activity Plan Risk-Informed Categorization and Treatment of Structures, Systems, and Components - MON 4
1 6/1/2026 6/12/2026 IP 37060 000521 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection Biennial Problem Identification and Resolution Inspection - MON 4
1 7/20/2026 8/7/2026 IP 71152B 000747 Problem Identification and Resolution Security Baseline Inspection - MON 1
1 7/27/2026 7/31/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1
7/27/2026 7/31/2026 IP 71130.09 001656 Security Plan Changes 1
7/27/2026 7/31/2026 IP 71151 001338 Performance Indicator Verification Cyber Security - MON 4
1 9/28/2026 10/2/2026 IP 71130.10 000741 Cybersecurity Monticello October 2026 Initial License Examination 5
1 9/20/2026 9/25/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) 1 10/19/2026 10/30/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Radiation Protection Baseline Inspection - MON 1
1 10/19/2026 10/23/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1
10/19/2026 10/23/2026 IP 71124.04 000728 Occupational Dose Assessment 1
10/19/2026 10/23/2026 IP 71151 000746 Performance Indicator Verification EAL & EPlan Changes Review - MON 1
1 11/1/2026 12/31/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes Triennial Material Control and Accounting Program Inspection - MON 1
1 1/1/2027 12/31/2027 IP 71130.11 000742 Material Control and Accounting (MC&A)
Security Baseline Inspection - MON 1
1 3/15/2027 3/19/2027 IP 71130.02 000734 Access Control 1
3/15/2027 3/19/2027 IP 71130.09 001656 Security Plan Changes Monticello Inservice Inspection 1
1 4/19/2027 5/14/2027 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Radiation Protection Baseline Inspection - MON 1
1 4/19/2027 4/23/2027 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Prepared on 8/18/2025 10:17:27 AM 2 of 3
Site Inspection Activity Plan Monticello 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count ISFSI Security Inspection 1
7/27/2026 7/31/2026 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 8/18/2025 10:17:27 AM 3 of 3