NRC Public Workshop ADVANCE Act, Section 505 Graded Review Approach:
Expanding the Use of LIC-206 for Streamlined Operating Reactor Licensing Reviews August 5, 2025 Accelerating Licensing, Anchored in Safety Meena Khanna Acting Director, DRA Jamie Pelton Acting Director, DORL John Hughey DRA/APOB Ed Miller DORL/LPL 2-1 David Gennardo DRA/APLA 1
Opening Remarks Jeremy Groom, Acting Deputy Director, NRR
- Meeting New Mandates
- Streamlined Reviews Through the Use of a Graded Approach
- Efficiency with Impact
- Focusing on What Matters the Most 2
Four-Pronged Approach for Conducting Efficient Operating Reactor Licensing Reviews, While Maintaining a Safety Focus (I) Approach to grade operating reactor licensing reviews (Updates in LIC-206, Appendix C) (DORL Handbook)
(II) Best Practices and Process Efficiencies (NRR staff and licensees)
(III) Roles and Responsibilities (for all levels of NRR Staff and Management)
(IV) Expectations and Contributions to Ensure Success 3
BLUF
- The NRC LIC-206 Tiger Team is providing an update to the new, proposed graded review process for the operating reactor licensing action reviews as discussed at a previous Public Meeting on May 22, 2025.
- This draft, iterative process is scheduled for initial implementation in fall 2025 that will be refined over time using lessons learned and best practices
- The new graded review process will be applied to all technical reviews for license amendment requests, exemption requests, and relief requests, but will exclude LR/SLR and EPU reviews.
- We have created a Process Guide to better facilitate the implementation of the graded approach.
- A fuller revision of LIC-206 will be completed in the Fall 2025.
- NRR ET and LT have approved the graded review approach, including the streamlined schedule and resource reduction targets.
4
Graded Approach - Leverages the LIC-206 Technical Reviewer (TR) Checklist/Review Grading Tool The TR Checklist/Grading tool will be applied by each technical reviewer for their assigned scope of review in RRPS. Note, Figure 2, above, is an abbreviated set of criteria and does not include all the details that will be provided in the LIC-206 update, which are also included in the following slides.
5 (Example)
Summary of Graded Approach and Criteria 6
Summary of Graded Approach and Criteria, Contd.
7
Summary of Graded Approach and Criteria, Contd.
8
Summary of Graded Approach and Criteria, Contd.
9
Graded Approach - Streamlined Schedule and Resource Reductions Based on Type of Review 10
GEM Resource Determinations 11
- PM Determination of Initial Schedule/Project Type o Precedent project - DORL level of effort tables.
o Non-Precedent project - EASE tool with Technical SME input as needed.
o Example:
GEM Resource Determinations 12
- TRs/BCs Scope Individual Review and Designate Type of Review oUse TR checklist/ TR Checklist/Review Grading tool to designate individual technical review as Limited, Typical, or Comprehensive.
- Determination of Individual Branch Resources based on BC/TR Review Type Designations
- PM will ensure cumulative branch resource estimates < project resource cap.
oAdditional resources above resource caps will be agreed to by DORL/Technical Branch BCs, with supporting justification.
Next Steps
- August 2025: Issue GEM Process Guide and Conduct Workshops with NRR Staff
- August 2025: Implement Graded Approach
- Fall 2025: Obtain LT Concurrence and Issue LIC-206 Update 13
Questions/
Comments/
Feedback 14 Thank you!