MONTHYEARML25142A3852025-05-22022 May 2025 Request for ASME Code Relief Regarding 48-Hour Hold Time When Performing Repairs Using Ambient Temperature GTAW Temper Bead Method Per ASME Code Case N-638-11 (Relief Request I5R-01) Project stage: Request ML25142A3872025-05-22022 May 2025 Relief Request I5R-01 Project stage: Request ULNRC-06947, Request for ASME Code Relief Regarding 48-Hour Hold Time When Performing Repairs Using Ambient Temperature GTAW Temper Bead Method Per ASME Code Case N-638-11 (Relief Request I5R-01)2025-05-22022 May 2025 Request for ASME Code Relief Regarding 48-Hour Hold Time When Performing Repairs Using Ambient Temperature GTAW Temper Bead Method Per ASME Code Case N-638-11 (Relief Request I5R-01) Project stage: Request ML25147A1262025-05-23023 May 2025 Unit 1 - Verbal Authorization - Relief Request I5R-01 - Verbal Approval from 48-hour Hold Time Project stage: Approval ML25148A2892025-05-28028 May 2025 Revision (Supplement) to Request to ASME Code Relief Regarding 48-Hr Hold Time When Performing Repairs Using Ambient Temperature GTAW Temper Bead Method Per ASME Code Case N-638-11 (Relief Request 15R-01) Project stage: Request ML25148A2912025-05-28028 May 2025 Enclosure 1: Callaway Plant, Unit 1 - Revision (Supplement) to Request to ASME Code Relief Regarding 48-Hr Hold Time When Performing Repairs Using Ambient Temperature GTAW Temper Bead Method Per ASME Code Case N-638-11 (Relief Request 15R-0 Project stage: Supplement ULNRC-06949, Revision (Supplement) to Request to ASME Code Relief Regarding 48-Hr Hold Time When Performing Repairs Using Ambient Temperature GTAW Temper Bead Method Per ASME Code Case N-638-11 (Relief Request 15R-01)2025-05-28028 May 2025 Revision (Supplement) to Request to ASME Code Relief Regarding 48-Hr Hold Time When Performing Repairs Using Ambient Temperature GTAW Temper Bead Method Per ASME Code Case N-638-11 (Relief Request 15R-01) Project stage: Supplement ML25153A5812025-05-30030 May 2025 Second Verbal Authorization of Request for Alternative I5R-01 - 48-Hour Non-Destructive Examination Hold - Project stage: Other ML25163A0382025-06-11011 June 2025 Request for Relief from Flaw Characterization and Flaw Removal Requirements of ASME Code, Section XI - Relief Request Project stage: Request ML25168A3302025-06-17017 June 2025 Closed Teleconference with Union Electric Company to Discuss Proprietary Material Provided in the Submittal of Relief Request I5R-02 for the Callaway Plant, Unit No. 1 Project stage: Meeting ML25175A3432025-06-24024 June 2025 Supplement to Request for Relief from Flow Characterization and Flaw Removal Requirements of ASME Code, Section XI - Relief Relief 15R-02 Project stage: Request ML25175A3462025-06-24024 June 2025 Enclosure 3: Non-Proprietary Documents Project stage: Request ML25178A2232025-06-26026 June 2025 Verbal Authorization of Relief Request from Flaw Characterization and Removal Requirements - I5R-02 - EPID L-2025-LLR-0059 Project stage: Approval ML25183A3372025-06-26026 June 2025 Verbal Authorization of Relief Request from Flaw Characterization and Removal Requirements - I5R-02 - Project stage: Approval ML25205A1332025-08-0404 August 2025 June 18, 2025, Summary of Closed Teleconference with Union Electric Company Regarding Relief Request I5R-02 – Alternate Repair of Reactor Vessel Bottom Mounted Instrumentation Nozzles for Callaway Plant, Unit No. 1 Project stage: Meeting ML25294A1482025-10-21021 October 2025 Second Supplement to Request for Relief from Flw Characterization and Flaw Removal Requirements of ASME Code, Section XI - Relief Request 15R-02 Project stage: Supplement ML25322A1962025-11-18018 November 2025 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML25324A2372025-12-0202 December 2025 Authorization and Safety Evaluation for Alternative Request No. I5R-01 and I5R-02, Epids L-2025-LLR-0054 and L-2025-LLR-0059 Project stage: Approval 2025-05-28
[Table View] |
Text
August 4, 2025 LICENSEE:
Union Electric Company FACILITY:
Callaway Plant, Unit No. 1
SUBJECT:
SUMMARY
OF JUNE 18, 2025, CLOSED TELECONFERENCE WITH UNION ELECTRIC COMPANY REGARDING RELIEF REQUEST I5R ALTERNATE REPAIR OF REACTOR VESSEL BOTTOM MOUNTED INSTRUMENTATION NOZZLES FOR CALLAWAY PLANT, UNIT NO. 1 (EPID L-2025-LLR-0059)
On June 18, 2025, a closed meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Union Electric Company, doing business as Ameren Missouri (the licensee), via teleconference. The purpose of the meeting was to discuss Proprietary Information provided in the submittal of Relief Request I5R-02, and inspection results of repaired reactor pressure vessel (RPV) bottom mounted instrument (BMI) nozzles at Callaway Plant, Unit 1.
The licensee submitted the subject relief request dated June 11, 202 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML25163A037). The meeting notice and agenda, dated May 20, 2025, are available in ADAMS at Accession No. ML25168A330. Enclosed is a list of attendees at the meeting.
During the meeting, the NRC staff discussed discrepancies in classification of proprietary information. The staff also had additional questions relating to inspection results of repaired RPV BMI nozzles.
No regulatory decisions were made during this teleconference. If you have any questions, please contact me at 301-415-8371 or via email at Mahesh.Chawla@nrc.gov.
/RA/
Mahesh L. Chawla, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
List of Attendees cc: Listserv
Enclosure LIST OF ATTENDEES JUNE 18, 2025, CLOSED MEETING WITH UNION ELECTRIC COMPANY REGARDING RELIEF REQUEST I5R ALTERNATE REPAIR OF REACTOR VESSEL BOTTOM MOUNTED INSTRUMENTATION NOZZLES FOR CALLAWAY PLANT, UNIT NO. 1 U.S. NUCLEAR REGULATORY COMMISSION NAME TITLE DIVISION Mahesh Chawla Project Manager NRR1/DORL2/LPL43 Tony Nakanishi Branch Chief William Orders Senior Project Manager Matthew Mitchell Branch Chief NRR/DNRL4/NPHP5 Jay Collins Senior Materials Engineer Angie Buford Branch Chief NRR/DNRL/NVIB6 John Tsao Senior Materials Engineer Ami Agrawal Branch Chief Region IV UNION ELECTRIC COMPANY NAME TITLE DIVISION Erin Smith Licensing Engineer Regulatory Affairs and Licensing Jeremy Morton Supervising Engineer EFIN FRAMATOME NAME TITLE DIVISION Brandon Caldwell Project Engineer Engineering Analysis Stacey Yoder Analysis Engineer Materials Analysis David Mancier Supervisor Component Repair Design Kaihong Wang Analysis Engineer Fracture Mechanics Craig Wicker Supervisor Materials Analysis Bogdan Wasiluk Supervisor Fracture Mechanics Rhimou Sulldi Supervisor Component Analysis 1 Office of Nuclear Reactor Regulation 2 Division of Operating Reactor Licensing 3 Plant Licensing Branch IV 4 Division of New and Renewed Licenses 5 Piping and Head Penetrations Branch 6 Vessels and Internals Branch
ML25205A189 (Package)
ML25168A330 (Meeting Notice)
ML25140A461 (Draft Relief Request)
ML25205A133 (Meeting Summary)
OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DNRL/NVIB/BC NAME MChawla PBlechman ABuford DATE 7/23/2025 7/28/2025 7/29/2025 OFFICE NRR/DNRL/NPHP/BC NRR/DORL/LPL/BC NRR/DORL/LPL4/PM NAME MMitchell TNakanishi MChawla DATE 7/29/2025 7/31/2025 8/4/2025