ML25197A572

From kanterella
Jump to navigation Jump to search

VC Summer Draft RAI for License Amendment Request to Modify Containment Leakage Testing Requirements
ML25197A572
Person / Time
Site: Summer 
Issue date: 07/16/2025
From: Ed Miller
NRC/NRR/DORL/LPL2-1
To: Fulmer A
Dominion Energy South Carolina
Miller GE, NRR/DORL/LPL2-1
References
EPID L-2025-LLA-0054
Download: ML25197A572 (1)


Text

From:

Ed Miller To:

ALLEN FULMER

Subject:

Draft RAI for Containment Leakage Testing LAR Date:

Wednesday, July 16, 2025 5:56:00 AM Attachments:

VC Summer _ Containment Leak Testing LAR_ Draft RAIs.docx Mr. Fulmer,

By letter dated March 20, 2025 (Agencywide Documents Access and Management System Accession No. ML25079A198), Dominion Energy South Carolina submitted an amendment request for the VC Summer Nuclear Station. The amendment would revise Technical Specification (TS) 6.8.4.g, "Containment Leakage Rate Testing Program," to adopt NEI 94-01, Revision 3-A and the NRC conditions in Revision 2-A.

Attached is the NRC staffs draft RAI for the subject report. The questions are being transmitted to you to determine 1) If the questions clearly convey the NRC information needs, 2) Whether the regulatory basis for the questions are clear, and 3) If the information has already been provided in existing docketed correspondence. Additionally, review of the draft question will allow you to determine what response time you can support. After youve had a chance to review, please let me know if you would like to have a clarification call to discuss. Thank you.

Ed Miller (301) 415-2481