Am entrifu rating June 30, 2025 ACO 25-0039 CUI // SP-SRI Security-Related Information-Withhold Under 10 CFR 2.390 ATTN: Document Control Desk Tara Inverso, Director Division of Security Operations Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 American Centrifuge Plant; Docket Number 70-7004; License Number SNM-2011 Substantive Change for American Centrifuge Operating, LLC's Security Plan in Oak Ridge, Tennessee INFORMATION TRANSMITTED HERE WITH IS PROTECTED FROM PUBLIC DISCLOSURE AS SECURITY-RELATED INFORMATION PURSUANT TO 10 CFR 2.390
Dear Tara Inverso:
The purpose of this letter is to submit a new proposed documentNR-SP-ACO-OR-0002, Temporary Construction Security Plan for Oak Ridge, TN, to the U.S. Nuclear Regulatory Commission (NRC) for review and approval to support manufacturing readiness and preparation for expanding manufacturing capabilities at the Technology Manufacturing Center in Oak Ridge, TN.
As previously discussed with NRC staff on several occasions, the need for unclassified construction to prepare the faci lity to support this expansion wi ll be required. Enclosure I provides a detailed description, justification, and ACO's significance determination for the new proposed document. provides NR-SP-ACO-OR-0002. This new proposed temporary construction security plan was determined not to decrease the effectiveness of the Security Programs/Plans in accordance with 10 Code of Federal Regulations (CFR) 70.32; however, the new security plan was determined to be a substantive change in accordance with IO CFR 95.19 and requires NRC's prior review and approval.
Information transmitted herewith contains CUI// SP-SRI Security-Related Information-Withhold Under 10 CFR 2.390 When separated from Enclosures, this letter is uncontrolled.
American Centrifuge Operating, LLC 3930 U.S. Route 23 South - P.O. Box 628 Piketon, OH 45661
CUI // SP-SRI Security-Related Information-Withhold Under 10 CFR 2.390 Tara Inverso June 30, 2025 ACO 25-0039, Page 2 Enclosures l and 2 contain Security-Related Information and American Centrifuge Operating, LLC (ACO) requests these enclosures be withheld from pub I ic disclosure pursuant to 10 CFR 2.390( d)( I).
After the NRC staff has had an opportunity to review the enclosures, ACO is available to support any discussions to address questions, clarify issues, or host an onsite walkdown of the proposed construction area. ACO respectfully requests NRC complete their review and approval on or before September 30, 2025, to support the ongoing schedule for manufacturing readiness and expansion.
If you have any questions regarding this matter, please contact me at (740) 897-3859.
Sincerely,
~!JifcA Regulatory Manager
Enclosures:
As Stated cc:
S. Bazian, NRC HQ T. Bluth, DOE Idaho J. Burns, DOE Idaho J. Downs, NRC Y. Faraz, NRC HQ A. Ford, DOE Idaho J. Hutson, Contractor J. Lingard, DOE Idaho M. McAnulty, DOE Idaho N. Pitoniak, NRC Region n L. Pitts, NRC Region II M. Reim, DOE-NE S. Rice, Contractor T. Vukovinsky, NRC Region II
- 0. Woodyatt, NRC HQ Information transmitted herewith contains CUI// SP-SRI Security-Related Information-Withhold Under 10 CFR 2.390 When separated from Enclosures, this letter is uncontrolled.