ML25181A053

From kanterella
Jump to navigation Jump to search
American Centrifuge Plant, Description of Change for Fundamental Nuclear Material Control Plan Documentation
ML25181A053
Person / Time
Site: 07007004
Issue date: 06/23/2025
From: Karen Fitch
American Centrifuge Operating
To: Julio Lara, John Lubinski
NRC/RGN-II, Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
ACO 25-0054
Download: ML25181A053 (1)


Text

Ame entrifug rating June 23, 2025 ACO 25-0054 ATTN: Document Control Desk John W. Lubinski, Director Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Julio Lara, (Acting) Regional Administrator U.S. NRC Region II Marquis One Tower 245 Peachtree Center Avenue N.E., Suite 1200 Atlanta, GA 30303 American Centrifuge Plant; Docket Number 70-7004; License Number SNM-2011 Description of Change for Fundamental Nuclear Material Control Plan Documentation

Dear John Lubinski and Julio Lara:

In accordance with 10 Code of Federal Regulations (CFR) 70.32( c )(2)(ii), American Centrifuge Operating, LLC (ACO) hereby submits to the U.S. Nuclear Regulatory Commission a description of change for the Fundamental Nuclear Material Control Plan documentation as Enclosure 1 of this letter.

The changes noted in Enclosure 1 have been reviewed in accordance with 10 CFR 70.32 and have been determined not to decrease the effectiveness of the Fundamental Nuclear Material Control Plan documentation.

If you have any questions regarding this matter, please contact me at (740) 897-3859.

Enclosure:

As Stated Sincerely,

~i7JJ~

Kelly L. Fitch Regulatory Manager American Centrifuge Operating, LLC 3930 U.S. Route 23 South - P.O. Box 628 Piketon, OH 45661

Jf!SSZD

~Q/JL>L

µH5S

/( tAJ-!L

L__

John W. Lubinski and Julio Lara June 23, 2025 ACO 25-0054, Page 2 cc:

S. Ani, NRC HQ T. Bluth, DOE Idaho J. Downs, NRC HQ Y. Faraz, NRC HQ A. Ford, DOE Idaho J. Lingard, DOE Idaho L. Pitts, NRC Region II M. Reim, DOE-NE D. Woodyatt, NRC HQ to ACO 25-0054 Description of Change for the Fundamental Nuclear Material Control Plan Documentation Information Contained Within Does Not Contain Export Controlled Information Reviewing Official :

Lori Hawk / ACO Date:

6/18/2025

PCE Numbers PCE 25-0021 Rev.

0 to ACO 25-0054 Description of Change for the Fundamental Nuclear Material Control Plan Documentation Description/Reason for the Change

Title:

Revision to LA-3605-0001, License Application for the American Centrifuge Plant; R-3605-000SA, (U) Program for Precluding and Detecting Unauthorized Production/Enrichment Activities; NR-3605-0005B, Addendum I

of the Fundamental Nuclear Material Control Plan for the American Centrifuge Plant -

HALEU Demonstration: NR-3605-0005C, (U) Program for Precluding and Detecting Unauthorized Production/Enrichment and Diversion Activities for the HALEU Demonstration Centrifuge Facility; SP-3605-0042, Security Plan for the Physical Protection of Special Nuclear Material at the American Centrifuge Plant: NR-SP-ACO-OR-0001, Security Program for American Centrifuge Operating, LLC at Oak Ridge, Tennessee; SEC-18-0002, lnformation System Security Plan (ISSP) for Oak Ridge, TN, Piketon, OH, and Bethesda, MD; LA-3605-0003, Integrated Safety Analysis Summary for the American Centrifuge Plant; LA-3605-0003O, (U)

Classified Hazard Evaluation Tables for the Integrated Safety Analysis Summary:

and LA-3605-0003A, Addendum I of the Integrated Safety Analysis Summary for the American Centrifuge Plant - HALEU Demonstration Description of Change: Made formatting and grammatical changes throughout the following licensing documents: LA-3605-000 I, NR-3605-000SA.

R-3605-000SB.

NR-3605-0005C, SP-3605-0042, NR-SP-ACO-OR-000 I, SEC-18-0002, LA-3605-0003, LA-3605-0003O, and LA-3605-0003A. Such changes included correctly identify the Licensee as American Centrifuge Operating, LLC; add spacing; delete references; delete unnecessary inside covers and blank pages; update Table of Contents to match the text; adjust third and fourth level headings; add hyphen in X-3346A building; and correct spelling.

Reason for the Change: Clarify licensing documentation.

Approval Date 5/8/2025 Change to SSC?

No Documents Modified Due to Change LA-3605-0001 Executive Summary, Sections 1.2.5, 1.3.2.2.3, 1.6, and 3.1.2.3.2.8 NR-3605-0005A Inside Cover and Blank Pages NR-3605-000SB TOC NR-3605-000SC Inside Cover SP-3605-0042 Cover Blank; Inside Cover and Blank; TOC Blank pg. iv R-SP-ACO-OR-0001 TOC, Sections I 1.5. I. I and 11.5.1.2 SEC-1 8-0002 TOC LA-3605-0003 TOC. Sections 1.9 and 3.7.5. l LA-3605-0003O Cover Blank; Inside Cover and Blank; ULOEP Blank; Last Blank LA-3605-0003A, Appendix C ISA Summary Update Required?

Yes