ML25178A309

From kanterella
Jump to navigation Jump to search
Notification of Cyber Security Inspection and Request for Information (NRC Inspection Report 05000261/2025403)
ML25178A309
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/30/2025
From: Daniel Bacon
NRC/RGN-II/DORS
To: Basta L
Duke Energy Progress
References
IR 2025403
Download: ML25178A309 (1)


See also: IR 05000261/2025403

Text

Laura A. Basta

Site Vice President

H. B. Robinson Steam Electric Plant

Duke Energy Progress, LLC

3581 West Entrance Road, RNPA11

Hartsville, SC 29550

SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - NOTIFICATION OF

CYBER SECURITY INSPECTION AND REQUEST FOR INFORMATION (NRC

INSPECTION REPORT 05000261/2025403)

Dear Laura A. Basta:

On September 8, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0

at your H. B. Robinson Steam Electric Plant, Unit 2. The inspection will be performed to

evaluate and verify your ability to provide assurance that your digital computer and

communication systems and networks associated with safety, security, or emergency

preparedness (SSEP) functions are adequately protected against cyber-attacks in accordance

with the requirements of Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, and

the NRC approved Cyber Security Plan (CSP). The onsite portion of the inspection will take

place during the week of September 8, 2025.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. To minimize the inspection impact on the site and to

ensure a productive inspection for both parties, we have enclosed a request for documents

needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should

be made available electronically no later than July 25, 2025. The inspection team will review

this information and, by August 1, 2025, will request the specific items that should be provided

for review. The second group of additional requested documents will assist the inspection team

in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive

architecture, and the areas of the licensees CSP selected for the cyber-security inspection. This

information will be requested for review in the regional office prior to the inspection by

September 1, 2025.

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, September 8, 2025.

June 29, 2025

L. Basta

2

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Larry J. Jones Jr. If there are any questions about the

inspection or the material requested, please contact the lead inspector at 404-997-4837 or via

e-mail at Larry.Jones@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRCs Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Daniel Bacon, Branch Chief

Engineering Branch 2

Division of Operating Reactor Safety

Docket No.:

50-261

License No.:

DPR-23

Enclosure:

H.B. Robinson Steam Electric Plant Unit 2 Cyber-Security Inspection Document Request

cc w/encl: Distribution via LISTSERV

Signed by Bacon, Daniel

on 06/29/25

ML25178A309

X

SUNSI Review

X

Non-Sensitive

Sensitive

X

Publicly Available

Non-Publicly Available

OFFICE

RII/DORS/EB2

RII/DORS/EB2

RII/DORS/EB1

NAME

J. Alamudun

L. Jones

D. Bacon

DATE

6/27/2025

6/27/2025

6/29/2025

Enclosure

Inspection Report: 05000261/2025403

Inspection Dates:

September 8 - 12, 2025

Inspection Procedure:

IP 71130.10, Cyber-Security, Revision 0

NRC Inspectors:

Larry J. Jones Jr., Lead

Folajimi (Jimi) Alamudun

404-997-4837

404-997-4490

Larry.Jones@nrc.gov

Folajimi.Alamudun@nrc.gov

NRC Contractors:

James Hartman

Trace Coleman

James.hartman@nrc.gov

trace.coleman@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and CSP

elements to develop a site-specific inspection plan. The first RFI is used to identify the

list of critical systems and critical digital assets (CSs/CDAs) plus operational and

management (O&M) security control portions of the CSP to be chosen as the sample

set required to be inspected by the cyber-security IP. The first RFIs requested

information is specified below in Table RFI #1. The Table RFI #1 information is

requested to be provided to the regional office by July 25, 2025 or sooner, to facilitate

the selection of the specific items that will be reviewed during the onsite inspection

week.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by August 1, 2025, which will

identify the specific systems and equipment that will be utilized to evaluate the

CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the

cyber-security inspection. We request that the additional information provided from the

second RFI be made available to the regional office prior to the inspection by

September 1, 2025.

The required Table RFI 1 information shall be provided electronically to the lead

inspector by July 25, 2025. The preferred file format for all lists is a searchable Excel

spreadsheet file. These files should be indexed and hyper-linked to facilitate ease of

use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

2

Table RFI #1

Request:

IP Ref

1

A list of all identified Critical Systems and Critical Digital Assets, -

highlight/note any additions, deletions, reclassifications due to new

guidance from white papers, changes to NEI 10-04, 13-10, etc. since

the last cyber security inspection.

Overall

2

Network Topology Diagrams to include information and data flow for

critical systems in levels 2, 3, and 4 (If available)

Overall

3

The most recent effectiveness analysis and self-assessment(s) of the

Cyber Security Program.

03.01(b)

4

Cyber Security Incident Response documentation, including incident

detection, response, and recovery documentation as well as

contingency plan development, implementation, and including any

program documentation that requires testing of security boundary

device functionality.

03.02(a)

5

Design change/ modification program documentation and a list of all

design changes completed since the last cyber security inspection,

including either a summary of the design change or the 50.59

documentation for the change.

03.03(a)

6

Configuration Management documentation including any security

impact analysis performed due to configuration changes since the last

inspection

03.03(a)

and (b)

7

Cyber Security Plan and any 50.54(p) analysis to support changes to

the plan since the last cyber inspection.

03.04(a)

8

Provide a list of all cybersecurity procedures and policies with their

descriptive name and associated number.

Overall

9

Cyber Security Performance Metrics tracked (if applicable).

03.06(b)

10

Performance testing report (if applicable).

03.06(a)

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by August 1, 2025, for the

second RFI (i.e., RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table RFI #1 and submit the list of specific systems and

equipment to your staff by August 1, 2025, for the second RFI (i.e., RFI #2). The

3

second RFI will request additional information required to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber-

security inspection. The additional information requested for the specific systems and

equipment is identified in Table RFI #2.

The Table RFI 2 information shall be provided electronically to the lead inspector by

September 1, 2025. The preferred file format for all lists is a searchable Excel

spreadsheet file. These files should be indexed and hyper-linked to facilitate ease of

use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

Table RFI #2

Request:

Items

For the Critical Systems / CDAs chosen for inspection provide:

1

Ongoing Monitoring and Assessment (OM&A) activity performed on

the selected inspection samples Critical Systems.

03.01(a)

2

All Security Control Assessments for the selected design changes

and Critical System selected CDAs.

03.01(a)

3

Copy of vulnerability management program documentation.

All vulnerability screenings and assessments completed prior to

placing new CDA equipment into service as part of the selected

design changes.

03.01(c)

4

Documentation (including configuration files and rules sets) for

Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),

Host-based Intrusion Detection Systems (HIDS), and Security

Information and Event Management (SIEM) for the systems chosen

for inspection.

03.02(b)

5

Documentation (including configuration files and rule sets) for intra-

security level firewalls and boundary devices used to protect the

selected critical systems.

03.02(c)

6

Copies of all periodic reviews of the access authorization list for the

selected systems since the last inspection. Provide documentation

describing any cyber security changes to the access authorization

program (AAP) since the last cyber security inspection.

03.02(d)

7

Baseline configuration data sheets for the selected CDAs.

03.03(a)

8

Copies of the purchase order documentation for any new equipment

purchased for the selected Critical Systems and design changes.

03.03(c)

4

9

Copies of any cyber security drills performed since the last

inspection, along with any reports or assessments generated.

03.02(a)

10

Vulnerability Management program screening and assessment

policies and procedures.

03.01(c)

11

Portable Media and Mobile Device (PMMD) control documentation,

including kiosk security control assessment/documentation.

03.02(e)

12

Device Access and Key Control program documentation.

03.02(c)

13

The most recent Cybersecurity Quality Assurance audit and/or self-

assessment and a list of Corrective Actions generated as a result.

Overall

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table Week Onsite) electronically by September 8, 2025.

Table: Week Onsite

Request:

Items

1

Any cyber security event reports submitted in accordance with 10

CFR 73.77 since the last cyber security inspection.

03.04(a)

IV.

Information Requested to Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member during daily de-brief meetings).