Correction to Issuance of Amendment to Relocate Selected Surveillance Frequencies to a Licensee Controlled Program
ML25167A006
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/27/2025
From: Geoffrey Miller
NRC/NRR/DORL/LPL2-1
To: Carr E
Dominion Energy South Carolina
References
EPID L-2021-LLA-0064
Download: ML25167A006 (1)


Text

June 27, 2025 Eric S. Carr Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, VA2 3060 6711

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 - CORRECTION TO ISSUANCE OF AMENDMENT TO RELOCATE SELECTED SURVEILLANCE FREQUENCIES TO A RISK-INFORMED LICENSEE CONTROLLED PROGRAM (EPID L-2021-LLA-0064)

Dear Mr. Carr:

On August 16, 2022 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML22160A365), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 222 to Renewed Facility Operating License No. NPF-12 for the Virgil C.

Summer Nuclear Station, Unit 1. The amendments revised the Technical Specifications (TSs) by relocating selected TS Surveillance Frequencies to a licensee-controlled document. This change was consistent with Technical Specification Task Force (TSTF) traveler TSTF-425, Revision 3 (ADAMS Package Accession No. ML090850642).

Subsequently, by letter dated June 5, 2025 (ML25156A130), Dominion Energy identified that some of the camera-ready pages provided with the amendment request had unintentional changes introduced in them. The NRC staff confirmed that the marked-up pages provided with the amendment request indicated no changes were intended to the identified parts of the TS pages identified in the June 5, 2025, letter. Additionally, the NRC staff verified that the pages identified had not been affected by subsequent amendments such that those changes would need to be included in the re-issued pages.

Accordingly, the corrected pages 3/4 1-2, 3/4 1-3, 3/4 1-8, 3/4 1-18, 3/4 2-15, 3/4 3-72, 3/4 4-1, 3/4 4-2, 3/4 4-24, 3/4 4-29, 3/4 4-33, 3/4 5-1, 3/4 5-8, 3/4 6-5, 3/4 6-14, 3/4 7-23, 3/4 7-37, 3/4 8-2a, 3/4 8-9, 3/4 8-16, 3/4 8-23, 3/4 8-24, 3/4 9-1, 3/4 9-10, 3/4 10-2, and 3/4 10-4 are enclosed with this letter. The corrections do not change any of the conclusions associated with the issuance of Amendment No. 222 to Renewed Facility Operating License No. NPF-12, and do not affect the no significant hazards consideration published in the Federal Register on June 15, 2022 (86 FR 31741).

E. Carr If you have any questions, please contact me at 301-415-4032, or via email at Ed.Miller@nrc.gov.

Sincerely,

/RA/

G. Edward Miller, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-395

Enclosure:

Corrected TS Pages cc: Listserv

SUMMER - UNIT 1 3/4 1-2 Amendment No. 222 REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 4.1.1.1.2 The overall core reactivity balance shall be compared to predicted values to demonstrate agreement within r 1% delta k/k in accordance with the Surveillance Frequency Control Program. This comparison shall consider at least the following factors:

1.

Reactor Coolant System boron concentration,

2.

Control rod position,

3.

Reactor Coolant System average temperature,

4.

Fuel burnup based on gross thermal energy production,

5.

Xenon concentration, and

6.

Samarium.

The predicted reactivity values shall be adjusted (normalized) to correspond to the actual core conditions prior to exceeding a fuel burnup of 60 Effective Full Power Days after each fuel loading.

SUMMER - UNIT 1 3/4 1-3 Amendment No. 46, 222 REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN - MODES 3, 4 AND 5 LIMITING CONDITION FOR OPERATION 3.1.1.2 The SHUTDOWN MARGIN shall be greater than or equal to the limits shown in Figure 3.1-3.

APPLICABILITY: MODES 3, 4 and 5.

ACTION:

With the SHUTDOWN MARGIN less than the required value, immediately initiate and continue boration at greater than or equal to 30 gpm of a solution containing greater than or equal to 7000 ppm boron or equivalent until the required SHUTDOWN MARGIN is restored.

SURVEILLANCE REQUIREMENTS 4.1.1.2 The SHUTDOWN MARGIN shall be demonstrated to be greater than or equal to the required value:

a.

Within one hour after detection of an inoperable control rod(s) and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter while the rod(s) is inoperable. If the inoperable control rod is immovable or untrippable, the SHUTDOWN MARGIN shall be verified acceptable with an increased allowance for the withdrawn worth of the immovable or untrippable control rod(s).

b.

In accordance with the Surveillance Frequency Control Program by consideration of the following factors:

1.

Reactor coolant system boron concentration,

2.

Control rod position,

3.

Reactor coolant system average temperature,

4.

Fuel burnup based on gross thermal energy generation,

5.

Xenon concentration, and

6.

Samarium concentration.

SUMMER - UNIT 1 3/4 1 - 8 Amendment No. 222 REACTIVITY CONTROL SYSTEMS FLOW PATHS - OPERATING LIMITING CONDITION FOR OPERATION 3.1.2.2 At least two of the following three boron injection flow paths shall be OPERABLE:

a.

The flow path from the boric acid tanks via a boric acid transfer pump or a gravity feed connection and a charging pump to the Reactor Coolant System.

b.

Two flow paths from the refueling water storage tank via charging pumps to the Reactor Coolant System.

APPLICABILITY:

MODES 1, 2, 3 and 4#.

ACTION:

With only one of the above required boron injection flow paths to the Reactor Coolant System OPERABLE, restore at least two boron injection flow paths to the Reactor Coolant System to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY and borated to a SHUTDOWN MARGIN equivalent to at least 2 percent delta k/k at 200qF within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />; restore at least two flow paths to OPERABLE status within the next 7 days or be in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.2.2 At least two of the above required flow paths shall be demonstrated OPERABLE:

a.

In accordance with the Surveillance Frequency Control Program by verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.

b.

In accordance with the Surveillance Frequency Control Program by verifying that the flow path required by Specification 3.1.2.2.a delivers at least 30 gpm to the Reactor Coolant System.

  1. Only one boron injection flow path is required to be OPERABLE whenever the temperature of one or more of the RCS cold legs is less than or equal to 300q F.

SUMMER - UNIT 1 3/4 1 - 18 Amendment No. 222 REACTIVITY CONTROL SYSTEMS POSITION INDICATION SYSTEM - SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.3 One rod position indicator (excluding demand position indication) shall be OPERABLE and capable of determining the control rod position within +/- 12 steps for each shutdown or control rod not fully inserted.

APPLICABILITY:

MODES 3*#, 4*# and 5*#

ACTION:

With less than the above required position indicator(s) OPERABLE, immediately open the reactor trip system breakers.

SURVEILLANCE REQUIREMENTS 4.1.3.3 Each of the above required rod position indicator(s) shall be determined to be OPERABLE by performance of an ANALOG CHANNEL OPERATIONAL TEST in accordance with the Surveillance Frequency Control Program.

  • With the reactor trip system breakers in the closed position.
  1. See Special Test Exception 3.10.5.

SUMMER - UNIT 1 3/4 2-15 Amendment No. 75, 222 POWER DISTRIBUTION LIMITS 3/4 2.5 DNB PARAMETERS LIMITING CONDITION FOR OPERATION 3.2.5 The following DNB related parameters shall be maintained within the limits shown on Table 3.2-1:

a. Reactor Coolant System Tavg.
b. Pressurizer Pressure APPLICABILITY:

MODE 1.

ACTION:

With any of the above parameters exceeding its limits, restore the parameter to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.2.5 Each of the parameters of Table 3.2-1 shall be verified to be within their limits in accordance with the Surveillance Frequency Control Program.

SUMMER - UNIT 1 3/4 3-72 Amendment No. 104, 222 INSTRUMENTATION LOOSE-PART DETECTION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.10 The loose-part detection system shall be OPERABLE.

APPLICABILITY: MODES 1 and 2 ACTION:

a.

With one or more loose part detection system channels inoperable for more than 30 days, prepare and submit a Special Report to the Commis-sion pursuant to Specification 6.9.2 within the next 10 days outlining the cause of the malfunction and the plans for restoring the channel(s) to OPERABLE status.

b.

The provisions of Specification 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.3.3.10 Each channel of the loose-part detection system shall be demonstrated OPERABLE by performance of:

a.

A CHANNEL CHECK in accordance with the Surveillance Frequency Control Program,

b.

An ANALOG CHANNEL OPERATIONAL TEST in accordance with the Surveillance Frequency Control Program, and

c.

A CHANNEL CALIBRATION in accordance with the Surveillance Frequency Control Program.

SUMMER - UNIT 1 3/4 4-1 Amendment No. 222 3/4.4 REACTOR COOLANT SYSTEM 3/4.4.1 REACTOR COOLANT LOOPS AND COOLANT CIRCULATION STARTUP AND POWER OPERATION LIMITING CONDITION FOR OPERATION 3.4.1.1 All Reactor Coolant loops shall be in operation.

APPLICABILITY:

MODES 1 and 2.*

ACTION:

With less than the above required Reactor Coolant loops in operation, be in at least HOT STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.1.1 The above required Reactor Coolant loops shall be verified to be in operation and circulating Reactor Coolant in accordance with the Surveillance Frequency Control Program.

  • See Special Test Exception 3.10.4.

SUMMER - UNIT 1 3/4 4-2 Amendment No. 222 REACTOR COOLANT SYSTEM HOT STANDBY LIMITING CONDITION FOR OPERATION 3.4.1.2 At least two of the Reactor Coolant loops listed below shall be OPERABLE and at least one of these Reactor Coolant loops shall be in operation.*

a.

Reactor Coolant Loop A and its associated steam generator and Reactor Coolant

pump,
b.

Reactor Coolant Loop B and its associated steam generator and Reactor Coolant

pump,
c.

Reactor Coolant Loop C and its associated steam generator and Reactor Coolant

pump, APPLICABILITY: MODE 3 ACTIONS:
a.

With less than the above required Reactor Coolant loops OPERABLE, restore the required loops to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

b.

With no Reactor Coolant loop in operation, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and immediately initiate corrective action to return the required coolant loop to operation.

SURVEILLANCE REQUIREMENTS 4.4.1.2.1 At least the above required Reactor Coolant pumps, if not in operation, shall be determined OPERABLE in accordance with the Surveillance Frequency Control Program by verifying correct breaker alignments and indicated power availability.

4.4.1.2.2 At least one cooling loop shall be verified to operation and circulating reactor coolant in accordance with the Surveillance Frequency Control Program.

4.4.1.2.3 The required steam generator(s) shall be determined OPERABLE by verifying secondary side water level to be greater than or equal to 10% of wide range indication in accordance with the Surveillance Frequency Control Program.

  • All Reactor Coolant pumps may be de-energized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided (1) no operations are permitted that would cause dilution of the reactor coolant system boron concentration, and (2) core outlet temperature is maintained at least 10qF below saturation temperature.

SUMMER - UNIT 1 3/4 4-24 Amendment No. 222 REACTOR COOLANT SYSTEM TABLE 4.4-3 CHEMISTRY LIMITS SURVEILLANCE REQUIREMENTS SAMPLE AND PARAMETER ANALYSIS FREQUENCY DISSOLVED OXYGEN*

SFCP CHLORIDE SFCP FLUORIDE SFCP

  • Not required with Tavg < 2500F

SUMMER - UNIT 1 3/4 4 - 29 Amendment No. 53, 113, 222 REACTOR COOLANT SYSTEM 3/4.4.9 PRESSURE/TEMPERATURE LIMITS REACTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION 3.4.9.1 The Reactor Coolant System (except the pressurizer) temperature and pressure shall be limited in accordance with the limit lines shown on Figures 3.4-2 and 3.4-3 during heatup, cooldown, criticality, and inservice leak and hydrostatic testing with:

a. A maximum heatup of 1000F in any one hour period,
b. A maximum cooldown of 1000F in any one hour period, and
c. A maximum temperature change of less than or equal to 100F in any one hour period during inservice hydrostatic and leak testing operations above the heatup and cooldown limit curves.

APPLICABILITY:

At all times.

ACTION:

With any of the above limits exceeded, restore the temperature and/or pressure to within the limit within 30 minutes; perform an engineering evaluation to determine the effects of the out-of-limit condition on the fracture toughness properties of the Reactor Coolant System; determine that the Reactor Coolant System remains acceptable for continued operation or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce the RCS Tavg and pressure to less than 2000F and 500 psig, respectively, within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.9.1.1 The Reactor Coolant System temperature and pressure shall be determined to be within the limits in accordance with the Surveillance Frequency Control Program during system heatup, cooldown, and inservice leak and hydrostatic testing operations.

4.4.9.1.2 The reactor vessel material irradiation surveillance specimens shall be removed and examined, to determine changes in material properties, at the intervals required by 10 CFR 50, Appendix H. The results of these examinations shall be used to update Figures 3.4-2 and 3.4-3.

SUMMER - UNIT 1 3/4 4 - 33 Amendment No. 222 REACTOR COOLANT SYSTEM PRESSURIZER LIMITING CONDITION FOR OPERATION 3.4.9.2 The pressurizer temperature shall be limited to:

a. A maximum heatup of 1000F in any one hour period,
b. A maximum cooldown of 2000F in any one hour period, and
c. A maximum auxiliary spray water temperature differential of 6250F.

APPLICABILITY:

At all times.

ACTION:

With the pressurizer temperature limits in excess of any of the above limits, restore the temperature to within the limits within 30 minutes; perform an engineering evaluation to determine the effects of the out-of-limit condition on the fracture toughness properties of the pressurizer; determine that the pressurizer remains acceptable for continued operation or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce the pressurizer pressure to less than 500 psig within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.9.2 The pressurizer temperatures shall be determined to be within the limits in accordance with the Surveillance Frequency Control Program during system heatup or cooldown. The spray water temperature differential shall be determined to be within the limit in accordance with the Surveillance Frequency Control Program during auxiliary spray operation.

SUMMER - UNIT 1 3/4 5-1 Amendment No. 61,75, 222 3/4.5 EMERGENCY CORE COOLING SYSTEMS 3/4.5.1 ACCUMULATORS LIMITING CONDITION FOR OPERATION 3.5.1 Each reactor coolant system accumulator shall be OPERABLE with:

a.

The isolation valve open,

b.

A contained borated water volume of between 7489 and 7685 gallons,

c.

A boron concentration of between 2200 and 2500 ppm, and

d.

A nitrogen cover-pressure of between 600 and 656 psig.

APPLICABILITY: MODES 1, 2 and 3.*

ACTION:

a.

With one accumulator inoperable, except as a result of a closed isolation valve, restore the inoperable accumulator to OPERABLE status within one hour or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With one accumulator inoperable due to the isolation valve being closed, either immediately open the isolation valve or be in at least HOT STANDBY within one hour and in HOT SHUTDOWN within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.5.1.1 Each accumulator shall be demonstrated OPERABLE:

a. In accordance with the Surveillance Frequency Control Program by:
1. Verifying the contained borated water volume and nitrogen cover-pressure in the tanks, and
2. Verifying that each accumulator isolation valve is open.
  • Pressurizer pressure above 1000 psig.

SUMMER - UNIT 1 3/4 5-8 Amendment No. 222 EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS 4.5.3.1 The ECCS subsystem shall be demonstrated OPERABLE per the applicable Surveillance Requirements of 4.5.2.

4.5.3.2 All charging pumps except the above required OPERABLE pumps, shall be demonstrated inoperable in accordance with the Surveillance Frequency Control Program whenever the temperature of one or more of the RCS Cold legs is less than or equal to 3000F by verifying that the motor circuit breakers have been secured in the open position.

SUMMER - UNIT 1 3/4 6-5 Amendment No.119, 135, 222 CONTAINMENT SYSTEMS SURVEILLANCE REQUlREMENTS 4.6.1.3 Each reactor building air lock shall be demonstrated OPERABLE:

a.

By verifying leakage rates in accordance with the Containment Leakage Rate Testing Program.

b.

Deleted.

c.

In accordance with the Surveillance Frequency Control Program by verifying that only one door in each air lock can be opened at a time.

d.

Deleted.

CONTAINMENT SYSTEMS REACTOR BUILDING COOLING SYSTEM LIMITING CONDITIONS FOR OPERATION 3.6.2.3 Two independent groups of reactor building cooling units shall be OPERABLE with at least one of two cooling units OPERABLE in slow speed in each group.

APPLICABILITY:

MODES 1, 2, 3 and 4.

ACTION:

a.

With one group of the above required reactor building cooling units inoperable and both reactor building spray systems OPERABLE, restore the inoperable group of cooling units to OPERABLE status within 7 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

b.

With two groups of the above required reactor building cooling units inoperable, and both reactor building spray systems OPERABLE, restore at least one group of cooling units to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore both above required groups of cooling units to OPERABLE status within 7 days of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

c.

With one group of the above required reactor building cooling units inoperable and one reactor building spray system inoperable, restore the inoperable spray system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore the inoperable group of containment cooling units to OPERABLE status within 7 days of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.2.3 Each group of reactor building cooling units shall be demonstrated OPERABLE:

a.

In accordance with the Surveillance Frequency Control Program by:

1.

Starting each cooling unit group from the control room, and verifying that each cooling unit group operates for at least 15 minutes in the slow speed mode.

b.

In accordance with the Surveillance Frequency Control Program by:

1.

Verifying that each fan group starts automatically on a safety injection test signal.

2.

Verifying a cooling water flow rate of greater than or equal to 2,000 gpm to each cooling unit group.

SUMMER - UNIT 1 3/4 6-14 Amendment No. 69, 222

SUMMER - UNIT 1 3/4 7-23 Amendment No. 222 PLANT SYSTEMS 3/4.7.8 SEALED SOURCE CONTAMINATION LIMITING CONDITION FOR OPERATION 3.7.8 Each sealed source containing radioactive material either in excess of 100 microcuries of beta and/or gamma emitting material or 5 microcuries of alpha emitting material, shall be free of greater than or equal to 0.005 microcuries of removable contamination.

APPLICABILITY: At all times.

ACTION:

a.

With a sealed source having removable contamination in excess of the above limits, withdraw the sealed source from use and either:

1.

Decontaminate and repair the sealed source, or

2.

Dispose of the sealed source in accordance with Commission regulations.

b.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.7.8.1 Test Requirements - Each sealed source shall be tested for leakage and/or contamination by:

a.

The licensee, or

b.

Other persons specifically authorized by the Commission or an Agreement State.

The test method shall have a detection sensitivity of at least 0.005 microcuries per test sample.

4.7.8.2 Test Frequencies - Each category of sealed sources (excluding startup sources and fission detectors previously subjected to core flux) shall be tested at the frequency described below.

a. Sources in use - In accordance with the Surveillance Frequency Control Program for all sealed sources containing radioactive materials:
1.

With a half-life greater than 30 days (excluding Hydrogen 3), and

2.

In any form other than gas.

SUMMER - UNIT 1 3/4 7-37 Amendment No. 86, 222 PLANT SYSTEMS 3/4.7.9 AREA TEMPERATURE MONITORING LIMITING CONDITION FOR OPERATION 3.7.9 The temperature of each area shown in Table 3.7-7 shall be maintained below the limits indicated in Table 3.7-7.

APPLICABILITY: Whenever the equipment in an affected area is required to be OPERABLE.

ACTION:

With one or more areas exceeding the temperature limit(s) shown in Table 3.7-7:

a.

For more than eight hours, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 30 days providing a record of the amount by which and the cumulative time the temperature in the affected area exceeded its limit and an analysis to demonstrate the continued OPERABILITY of the affected equipment.

b.

By more than 30qF, in addition to the Special Report required above, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> either restore the area to below its temperature limit or declare the equipment in the affected area inoperable.

SURVEILLANCE REQUIREMENTS 4.7.9 The temperature in each of the areas of Table 3.7-7 shall be determined to be within its limit in accordance with the Surveillance Frequency Control Program.

SUMMER - UNIT 1 3/4 8-2a Amendment No. 77, 98, 222 ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

ACTION: (Continued)

d.

With two of the required offsite A. C. Circuits inoperable:

1. Demonstrate the OPERABILITY of the two EDGs by sequentially performing Surveillance Requirement 4.8.1.1.2.a.3 on both within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, unless the EDGs are already operating, and
2. Restore one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
3. Following restoration of one offsite source, follow Action Statement a. with the time requirements of that Action Statement based on the time of initial loss of the remaining inoperable offsite A. C. circuit.
e.

With two of the above required EDGs inoperable:

1. Demonstrate the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and
2. Restore one of the inoperable EDGs to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
3. Following restoration of one EDG, follow Action Statement b. with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable diesel generator.

SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Each of the above required physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system shall be determined OPERABLE in accordance with the Surveillance Frequency Control Program by verifying correct breaker alignment and indication of power availability for each Class 1E bus and its preferred offsite power source.

SUMMER - UNIT 1 3/4 8-9 Amendment No. 222 ELECTRICAL POWER SYSTEMS 3/4.8.2 D.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.2.1 As a minimum the following D.C. electrical sources shall be OPERABLE:

a. 125-volt Battery bank No. 1A and its associated full capacity charger.
b. 125-volt Battery bank No. 1B and its associated full capacity charger.

APPLICABILITY:

Modes 1, 2, 3 and 4.

ACTION:

a. With one of the required battery banks inoperable, restore the inoperable battery bank to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With one of the required full capacity chargers inoperable, demonstrate the OPERABILITY of its associated battery bank by performing Surveillance Requirement 4.8.2.1.a.1 within one hour, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If any Category A limit in Table 4.8-2 is not met, declare the battery inoperable.

SURVEILLANCE REQUIREMENTS 4.8.2.1 Each 125-volt battery bank and charger shall be demonstrated OPERABLE:

a. In accordance with the Surveillance Frequency Control Program by verifying that:
1. The parameters in Table 4.8-2 meet the Category A limits, and
2. The total battery terminal voltage is greater than or equal to 129 volts on float charge.

SUMMER - UNIT 1 3/4 8-16 Amendment No. 63, 222 ELECTRICAL POWER SYSTEMS 3/4.8.4 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES LIMITING CONDITION FOR OPERATION 3.8.4.1 For each containment penetration provided with a penetration conductor overcurrent protective device(s), each device(s) shall be operable.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With one or more of the above required containment penetration conductor overcurrent protective device(s) inoperable:

a.

Restore the protective device(s) to OPERABLE status or de-energize the circuit(s) by tripping the associated backup circuit breaker or racking out or removing the inoperable circuit breaker within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, declare the affected system or component inoperable, and verify the backup circuit breaker to be tripped or the inoperable circuit breaker racked out, or removed, at least once per 7 days thereafter; the provisions of Specification 3.0.4 are not applicable to overcurrent devices in circuits which have their backup circuit breakers tripped, their inoperable circuit breakers racked out, or removed, or

b.

Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.8.4.1 Protective devices required to be operable as containment penetration conductor overcurrent protective devices shall be demonstrated OPERABLE.

a.

In accordance with the Surveillance Frequency Control Program:

1.

By verifying that the medium voltage (7.2 KV) circuit breakers are OPERABLE by selecting, on a rotating basis, at least 10% of the circuit breakers of each voltage level, and performing the following:

(a)

A CHANNEL CALIBRATION of the associated protective relays, and (b)

An integrated system functional test which includes simulated automatic actuation of the system and verifying that each relay and associated circuit breakers and control circuits function as designed.

SUMMER - UNIT 1 3/4 8-23 Amendment No. 38, 63, 102, 222 ELECTRICAL POWER SYSTEMS CIRCUIT PROTECTION DEVICES LIMITING CONDITION FOR OPERATION 3.8.4.3 Circuit breakers for non-Class 1E cables located in trays which do not have cable tray covers and which provide protection for cables that if faulted could cause failure in both adjacent, redundant Class 1E cables shall be OPERABLE.

APPLICABILITY: All modes ACTION:

a.

With one or more of the above required non-Class 1E circuit breaker(s) inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, either:

1.

Restore the circuit breaker(s) to OPERABLE status; or

2.

De-energize the circuit breaker(s); or

3.

Establish a one (1) hour roving fire watch for those areas in which redundant systems or components could be damaged.

b.

The provisions of Specification 3.0.4 are not applicable.

SURVEILLANCE REQUIREMENTS 4.8.4.3 The above required circuit breakers shall be demonstrated OPERABLE.

a.

In accordance with the Surveillance Frequency Control Program:

1.

By verifying that the medium voltage (7.2 KV) circuit breakers are OPERABLE by selecting, on a rotating basis, at least 10% of the circuit breakers and performing the following:

(a)

A CHANNEL CALIBRATION of the associated protective relays, and (b)

An integrated system functional test which includes simulated automatic actuation of the system and verifying that each relay and associated circuit breakers and control circuits function as designed.

(c)

For each circuit breaker found inoperable during these functional tests, an additional representative sample of at least 10% of all the circuit breakers of the inoperable type shall also be functionally tested until no more failures are found or all circuit breakers of that type have been functionally tested.

SUMMER - UNIT 1 3/4 8-24 Amendment No. 38, 63, 102, 222 ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

2.

By selecting and functionally testing a representative sample of at least ten percent (10%) of each type of lower voltage circuit breakers. Circuit breakers selected for functional testing shall be selected on a rotating basis. Testing of these circuit breakers shall consist of injecting a current in excess of the breaker's nominal setpoint and measuring the response time. The measured response time will be compared to the manufacturers data to insure that it is less than or equal to a value specified by the manufacturer. Circuit breakers found inoperable during functional testing shall be restored to OPERABLE status prior to resuming operation. For each circuit breaker found inoperable during these functional tests, an additional representative sample of at least ten percent (10%) of all the circuit breakers of the inoperable type shall also be functionally tested until no more failures are found or all circuit breakers of that type have been functionally tested.

b.

In accordance with the Surveillance Frequency Control Program by subjecting each circuit breaker to an inspection and preventive maintenance in accordance with procedures prepared in conjunction with its manufacturer's recommendations.

SUMMER - UNIT 1 3/4 9-1 Amendment No. 222 3/4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION LIMITING CONDITION FOR OPERATION 3.9.1 The boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restrictive of the following reactivity conditions is met:

a.

Either a Keff of 0.95 or less, or

b.

A boron concentration of greater than or equal to 2000 ppm.

APPLICABILITY:

MODE 6

  • with the reactor vessel head closure bolts less than fully tensioned or with the head removed.

ACTION:

With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes and initiate and continue boration at greater than or equal to 30 gpm of a solution containing greater than or equal to 7000 ppm boron or its equivalent until Keff is reduced to less than or equal to 0.95 or the boron concentration is restored to greater than or equal to 2000 ppm, whichever is the more restrictive.

SURVEILLANCE REQUIREMENTS 4.9.1.1 The more restrictive of the above two reactivity conditions shall be determined prior to:

a.

Removing or unbolting the reactor vessel head, and

b.

Withdrawal of any full length control rod in excess of 3 feet from its fully inserted position within the reactor pressure vessel.

4.9.1.2 The boron concentration of the reactor coolant system and the refueling canal shall be determined by chemical analysis in accordance with the Surveillance Frequency Control Program.

4.9.1.3 The following valves shall be verified locked closed ** in accordance with the Surveillance Frequency Control Program: 8430, 8454, 8441 and 8439.

The reactor shall be maintained in MODE 6 whenever fuel is in the reactor vessel with the vessel head closure bolts less than fully tensioned or with the head removed.

Valves may be opened under administrative control to add borated makeup.

SUMMER - UNIT 1 3/4 9-10 Amendment No. 222 REFUELING OPERATIONS 3/4.9.9 WATER LEVEL - REFUELING CAVITY AND FUEL TRANSFER CANAL LIMITING CONDITION FOR OPERATION 3.9.9 At least 23 feet of water shall be maintained over the top of the reactor pressure vessel flange.

APPLICABILITY:

During movement of fuel assemblies or control rods within the reactor pressure vessel or the refueling cavity when either the fuel assemblies being moved or the fuel assemblies seated within the reactor pressure vessel are irradiated.

ACTION:

With the requirements of the above specification not satisfied, suspend all operations involving movement of fuel assemblies or control rods within the pressure vessel.

SURVEILLANCE REQUIREMENTS 4.9.9 The water level shall be determined to be at least its minimum required depth within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> prior to the start of and in accordance with the Surveillance Frequency Control Program thereafter during movement of fuel assemblies or control rods.

SUMMER - UNIT 1 3/4 10-2 Amendment No. 75, 222 SPECIAL TEST EXCEPTIONS 3/4.10.2 GROUP HEIGHT, INSERTION AND POWER DISTRIBUTION LIMITS LIMITING CONDITION FOR OPERATION 3.10.2 The group height, insertion and power distribution limits of Specifications 3.1.3.1, 3.1.3.5, 3.1.3.6, 3.2.1 and 3.2.4 may be suspended during the performance of PHYSICS TESTS provided:

a. The THERMAL POWER is maintained less than or equal to 85% of RATED THERMAL POWER, and
b. The limits of Specifications 3.2.2 and 3.2.3 are maintained and determined at the frequencies specified in Specifications 4.10.2.2 below.

APPLICABILITY:

MODE 1.

ACTION:

With any of the limits of Specifications 3.2.2 or 3.2.3 being exceeded while the requirements of Specifications 3.1.3.1, 3.1.3.5, 3.1.3.6, 3.2.1 and 3.2.4 are suspended, either:

a. Reduce THERMAL POWER sufficient to satisfy the ACTION requirements of Specifications 3.2.2 and 3.2.3, or
b. Be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.10.2.1 The THERMAL POWER shall be determined to be less than or equal to 85% of RATED THERMAL POWER in accordance with the Surveillance Frequency Control Program during PHYSICS TESTS.

4.10.2.2 The Surveillance Requirements of the below listed Specifications (a. and b.) shall be performed in accordance with the Surveillance Frequency Control Program during PHYSICS TESTS:

a. Either Specifications 4.2.2.2 or 4.2.2.4 and Specification 4.2.2.5.
b. Specification 4.2.3.2.

SUMMER - UNIT 1 3/4 10-4 Amendment No. 222 SPECIAL TEST EXCEPTIONS 3/4.10.4 REACTOR COOLANT LOOPS LIMITING CONDITION FOR OPERATION 3.10.4 The limitations of Specifications 3.4.1.1 may be suspended during the performance of start up and PHYSICS TESTS provided:

a. The THERMAL POWER does not exceed the P-7 Interlock Setpoint, and
b. The Reactor Trip Setpoints on the OPERABLE Intermediate and Power Range Channels are set at less than or equal to 25% of RATED THERMAL POWER.

APPLICABILITY:

During operation below the P-7 Interlock Setpoint.

ACTION:

With the THERMAL POWER greater than the P-7 Interlock Setpoint, immediately open the reactor trip breakers.

SURVEILLANCE REQUIREMENTS 4.10.4.1 The THERMAL POWER shall be determined to be less than P-7 interlock Setpoint in accordance with the Surveillance Frequency Control Program during start up and PHYSICS TESTS.

4.10.4.2 Each Intermediate, Power Range Channel and P-7 Interlock shall be subjected to an ANALOG CHANNEL OPERATIONAL TEST within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to initiating start up and PHYSICS TESTS.

ML25167A006