ML25156A148
| ML25156A148 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 06/05/2025 |
| From: | Ed Miller NRC/NRR/DORL/LPL2-1 |
| To: | Fulmer A Dominion Energy South Carolina |
| References | |
| Download: ML25156A148 (1) | |
Text
From:
Ed Miller To:
ALLEN FULMER
Subject:
Draft RAI for SG Tube Inspection Report Date:
Thursday, June 5, 2025 7:58:00 AM Attachments:
RF-28 Fall 2024 SGTIR DRAI.docx Mr. Fulmer,
By letter dated April 24, 2025 (Agencywide Documents Access and Management System Accession No. ML25114A223), Dominion Energy South Carolina submitted information summarizing the results of the fall 2024 steam generator (SG) inspections performed at Virgil C. Summer Nuclear Station, Unit 1. These inspections were performed during the end of cycle 28 refueling outage (1R28).
Attached is the NRC staffs draft RAI for the subject report. The questions are being transmitted to you to determine 1) If the questions clearly convey the NRC information needs, 2) Whether the regulatory basis for the questions are clear, and 3) If the information has already been provided in existing docketed correspondence. Additionally, review of the draft question will allow you to determine what response time you can support. After youve had a chance to review, please let me know if you would like to have a clarification call to discuss. Thank you.
Ed Miller (301) 415-2481