June 03, 2025 Joseph Sullivan, Site Vice President Entergy Operations, Inc.
17265 River Road Killona, LA 70057
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000382/2025003) AND REQUEST FOR INFORMATION
Dear Joseph Sullivan:
During the week of July 14, 2025, two inspectors from the Nuclear Regulatory Commissions (NRC) Region IV office will perform the baseline biennial requalification inspection at Waterford, using NRC Inspection Procedure 71111.11B, Licensed Operator Requalification Program.
Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. To minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
These documents have been divided into three groups:
The first group (Section A of the enclosure) identifies information to be provided prior to the inspection to ensure that the inspectors are adequately prepared.
The second group (Section B of the enclosure) identifies the information the inspectors will need upon arrival at the site.
The third group (Section C of this enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the inspectors have left the site.
It is important that all these documents are up to date and complete to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Wesley Wesley of your training organization. Our inspection dates are subject to change based on your updated schedule of
J. Sullivan 2
examination activities. If there are any questions about this inspection or the material requested, please contact me, Chris Harrington, at (817) 200-1254 (christopher.harrington@nrc.gov).
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Chris Harrington, Operations Engineer Operations Branch Division of Reactor Safety Docket No. 05000382 License No. NPF-38
Enclosure:
Initial Request for Information Biennial Requalification Inspection Signed by Harrington, Chris on 06/03/25
ML25154A557 SUNSI Review ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: CMH13 Yes No Publicly Available Sensitive NRC-002 OFFICE OE:DORS/OB NAME CHarrington SIGNATURE
/RA/
DATE 06/03/25
Enclosure Initial Request for Information Biennial Requalification Inspection Waterford Inspection Report: 05000382/2025003 Inspection Dates:
July 14, 2025 - July 18, 2025 Inspection Procedure:
IP 71111.11B, Licensed Operator Requalification Program Lead Inspector:
Chris Harington, Operations Engineer A. The following information is requested to support inspection preparation activities.
These items are listed by section as they appear in the inspection module (i.e. 03.04a, 03.04b, etc.). Requested materials can be sent via a file hosting service (preferably Sharepoint) or in an electronic format on CD/DVD to arrive at the Region IV office no later than June 30, 2025.
CD/DVD to: US Nuclear Regulatory Commission, Region IV ATTN: Chris Harrington 1600 E. Lamar Blvd Arlington, TX 76011 General Requests:
List of licensed operators (SRO & RO) by crew (operating & staff)
Training and Operations Department organization charts (with qualified LOR evaluators identified)
Procedures that identify process for revising and maintaining LO continuing training program up to date List of outstanding LOR program changes List of plant events and industry operating experience incorporated into LOR program since last BRQ Audits and/or self-assessment reports addressing the licensed operator requalification training program Last 2 years of Simulator Review Committee (or equivalent) meeting minutes Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes A summary report of all condition reports related to operator actions/errors in the control room
2 Any revised requalification training that was based on licensed operator performance issues 03.04a: Biennial Requalification Written Examinations The current and approved biennial written examination schedule The current requalification cycle written examination results for both SRO & RO that have already been administered up to the week prior to the inspectors arrival onsite.
All written examinations that have been approved for administration up to and including the week before the inspectors are onsite. This will need to have adequate password protection or double envelope protection if mailed via regular mail per NUREG-1021.
The current requalification cycle examination methodology (sample plan) 03.04b: Annual Requalification Operating Tests The schedule for the operating tests (JPMs & scenarios) to be given the week of July 14, 2025 (week inspectors are onsite)
The operating tests (JPMs & scenarios) (password protected and provide separately via telephone at later date) to be given the week of July 14, 2025 Current requalification cycle operating tests (SRO & RO) and results up to the week prior to the inspection inspectors arrival onsite All 2024 NRC required annual operating tests Current requalification cycle operating test methodology (sample plan) 03.04c: Administration of an Annual Requalification Operating Test All procedures used to administer the annual operating test All procedures used to assess operator performance All procedures that describe conduct of simulator training All procedures used to test, operate, and maintain the simulator 03.04d: Requalification Examination Security Submit any tracking tools that you use to prevent excessive overlap on the written examinations and meet the intent of sampling all required topics on a periodic basis.
Submit any tracking tools that you use to prevent excessive overlap on the operating tests and meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.
3 All procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations in current exam cycle tests and prior year examinations List of all condition reports since the last biennial requalification inspection related to examination security and overlap 03.04e: Remedial Training and Re-Examinations List of remedial training conducted or planned since last requalification exam (includes training provided to operators to enable passing requalification exam and training provided to correct generic or individual weaknesses observed during previous requalification exam cycle)
Remediation plans (lesson plans, reference materials, and attendance documentation) 03.04f: Operator License Conditions All procedures and program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators All procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection 03.04g: Control Room Simulator All simulator management and configuration procedures if not already provided Simulator discrepancy report summary list for all open discrepancy reports and summary list for those items closed since July 15, 2023.
Primary parameters tested to verify core physics parameters (such as moderator temperature coefficient, integral rod worth). The applicable reference graphs from the plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results.
All simulator modification packages that are on hold, delayed, or not completed in the last 2 years A list of simulator modification packages completed in the last two-year window
4 B. The following information is requested to support the onsite inspection activities.
Requested materials should be available to the inspectors, either electronically or hardcopy, upon site arrival on July 14, 2025.
03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written Exam and Annual Requalification Operating Tests Quality All operating tests (JPMs & scenarios) to be given in all subsequent weeks after onsite week, if available All results up to the day the inspectors leave the site 03.04f: Conformance with Operator License Conditions Access to licensed operators records (operating and staff crews)
Access to licensed operators training attendance records Access to licensed operators medical records 03.04g: Control Room Simulator Performance Simulator discrepancies from July 15, 2023 - July 14, 2025. This should include all open and closed simulator discrepancy reports, including the documentation/justification for closure.
Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available)
Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant All current model deficiencies, including FSAR vs design differences in the simulator (any documentation on this)
Summary list of modifications from July 15, 2023 - July 14, 2025.
Plant modifications (both hardware and software) completed on the simulator by due date from July 15, 2023 - July 14, 2025.
Simulator differences lesson plan used in training (current to July 14, 2025)
The complete book of all simulator annual performance test packages (usually in a single book but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests. This should also include the test procedures for each test, the acceptance criteria, and results. For each transient test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the ANSI standard requirements.
5 All test packages used to verify core physics parameters (such as moderator temperature coefficient and integral rod worth). The applicable reference graphs from the plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and the acceptance criteria with results.
All simulator tests, configuration management, and related documents available in the room for inspectors to review. This includes training needs analysis packages, Simulator Review Committee meeting minutes, etc.
Current copy of ANSI 3.5 standard you are committed to for simulator testing C. Waterford is required to send the final results summary (see Table 1 below) and any remaining exams and operating tests that have not been reviewed to the regional office lead inspector for this inspection for final review and comparison against the Significance Determination Tools to communicate the exit results for the inspection.
TABLE 1: EXAMINATION RESULTS
- 1. Total number of licensed operators.
- 2. Number of licensed operators administered a requalification examination required by 10 CFR 55.59(a).
- 3. Number of individual licensed operators who failed any portion of a requalification examination (written, JPM, or individual simulator scenario failures).
- 4. Divide line 3 by line 2 to obtain the individual requalification examination failure rate. Line 3/Line 2.
- 5. Number of crews administered simulator scenarios as part of a requalification examination required by 10 CFR 55.59(a).
- 6. Number of crews who performed unsatisfactorily on the simulator scenarios.
- 7. Divide line 6 by line 5 to obtain the crew simulator scenario failure rate. Line 6/Line 5.
%