ML25148A335

From kanterella
Jump to navigation Jump to search
Notification of NRC Request for Information for Post-Approval Site Inspection for License Renewal Phase IV Inspection Report 05000346/2025011
ML25148A335
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/28/2025
From: Benny Jose
NRC/RGN-III/DORS/EB2
To: Tony Brown
Vistra Operations Company
References
IR 2025011
Download: ML25148A335 (1)


See also: IR 05000346/2025011

Text

Terry Brown

Site Vice President

Vistra Operations Company, LLC

Davis-Besse Nuclear Power Station

5501 N. State Rte. 2, Mail Stop A-DB-3080

Oak Harbor, OH 43449-9760

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION-NOTIFICATION OF NRC

REQUEST FOR INFORMATION FOR POST-APPROVAL SITE

INSPECTION FOR LICENSE RENEWAL-PHASE IV; INSPECTION

REPORT 05000346/2025011

Dear Terry Brown:

On July 14, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in

accordance with Inspection Procedure 71003 (Phase 4). This onsite inspection is scheduled to

be performed July 14 - July 18, 2025, and July 28 - August 1, 2025.

The purpose of the inspection is to review the implementation of the Aging Management

Program (AMP) elements during the Period of Extended Operation (PEO). The inspection team

will select for review a sample of the sites AMPs.

This Request for Information is separated into three Sections (A, B and C). Section A lists

the AMP samples selected by the lead inspector for this inspection. Based on these sample

selections, the licensee will provide the additional information requested under Section B.

This information will be used as part of the inspection preparation and implementation.

Requests under Section C should be available to the inspectors during the on-site week of

inspection. See the table below for specific dates:

Requested Action:

Date:

Section B Information

July 3, 2025

Section C Information

July 14, 2025

May 28, 2025

T. Brown

2

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. To minimize the impact to your onsite resources and to ensure a productive

inspection, we have enclosed a request for documents needed for this inspection. It is important

that these documents are current and complete to ensure efficiency.

We understand that our contact for this inspection will be Chad Atkinson (419-321-7844) of

your organization. If there are any questions about this inspection or the material requested,

please contact the lead inspector Benny Jose at benny.jose@nrc.gov or 630-829-9756.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

Benny Jose, Senior Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Docket No. 50-346

License No. NPF-3

Enclosure:

Document Request for License Renewal

Phase 4 Inspection

cc w/encl: Distribution via LISTSERV

Signed by Jose, Benny

on 05/28/25

T. Brown

3

Letter to Terry Brown from Benny Jose dated May 28, 2025.

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION-NOTIFICATION OF NRC

REQUEST FOR INFORMATION FOR POST-APPROVAL SITE

INSPECTION FOR LICENSE RENEWAL-PHASE IV; INSPECTION

REPORT 05000346/2025011

DISTRIBUTION:

Tim Steadham

RidsNrrDorlLpl3

RidsNrrPMDavisBesse Resource

RidsNrrDroIrib Resource

Jack Giessner

Mohammed Shuaibi

Diana Betancourt-Roldan

Bryan Bergeon

John Pelchat

David Curtis

Jared Heck

R3-DORS

ADAMS Accession Number: ML25148A335

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

RIII

NAME

BJose:gmp

DATE

05/28/2025

OFFICIAL RECORD COPY

Enclosure

DAVIS-BESSE NUCLEAR POWER STATION-REQUEST FOR

INFORMATION FOR LICENSE RENEWAL INSPECTION

(PHASE 4)

Inspection Procedure:

IP 71003, Post-Approval Site Inspection for License Renewal

(Phase 4)

Inspection Dates:

July 14 - August 1, 2025

Inspection Report: 05000346/2025011

Lead Inspector:

Benny Jose

On July 14, 2025, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in

accordance with Inspection Procedure 71003 (Phase 4). This onsite inspection is scheduled to

be performed July 14 - July 18, 2025, and July 28 - August 1, 2025.

The purpose of the inspection is to review the implementation of the Aging Management

Program (AMP) elements during the Period of Extended Operation (PEO). The inspection team

will select for review a sample of the sites AMPs.

This Request for Information is separated into three Sections (A, B and C). Section A lists

the AMP samples selected by the lead inspector for this inspection. Based on these sample

selections, the licensee will provide the additional information requested under Section B.

This information will be used as part of the inspection preparation and implementation.

Requests under Section C should be available to the inspectors during the on-site week of

inspection. See the table below for specific dates:

Requested Action:

Date:

Section B Information

July 3, 2025

Section C Information

July 14, 2025

A. AMP Samples Selected

(1)

Aboveground Steel Tanks Inspection Program.

(2)

Buried Piping and Tanks Inspection Program.

(3)

External Surfaces Monitoring Program.

(4)

Fire Protection Program.

(5)

Fire Water Program.

(6)

Inaccessible Medium Voltage Cables not Subject to 10 CFR 50.49, EQ

Requirements Program.

2

(7)

Leake Chase Monitoring Program.

(8)

Masonry Wall Inspection Program.

(9)

Nickel Alloy Management Program.

(10) Nickel Alloy Reactor Vessel Closure Head Nozzles Program.

(11) One Time Inspection Program.

(12) Open Cycle Cooling Water Program.

(13) Selective Leaching Inspection Program.

(14) Small Bore Class 1 Piping Inspection Program

(15) Structures Monitoring Program.

(16) Shield Building Monitoring Program.

B. Information Requested for Each AMP Selected for Review (As Applicable)

(1)

Program basis documents and administrative procedures describing key program

attributes such as program objectives, scope, detection and monitoring methods,

administrative controls, acceptance criteria, corrective actions, and scope expansion

requirements.

(2)

Provide a summary document listing which implementing procedures are included in

the selected AMP and what are their required performance frequency.

(3)

Copies of implementing procedures for program activities (e.g., visual examination

procedures, ultrasonic examination procedures, maintenance procedures, system

walkdowns, etc.)

(4)

Completed Work Orders (WOs) for the most recent aging management activities

performed, including associated inspection and testing reports, as applicable. This

request is limited to the last two completed activities (per procedure). If this request

becomes too onerous based on the number of Work Orders, reach out to the lead

inspector for additional scope clarification.

(5)

Copies of aging related corrective actions documents associated with the selected

AMP, and SSCs under its purview (for the last three years). A search of corrective

action documents should include keywords such as: aging, age management,

degradation, wear, delamination, peeling, crazing, chipping, leak, crack,

corrosion, rust, leaching, embrittlement, fatigue, blister, spalling, oxidation,

loss of function, failed acceptance criteria, flow-accelerated, or other site-specific

terms/codes used in aging monitoring as appropriate.

3

(6)

Updated license renewal scoping drawings showing the SSCs within the scope of the

AMP.

(7)

Any gap analyses performed to assess the differences between the current AMP and

the recommendations in the latest revision of NUREG-1801, Generic Aging Lessons

Learned (GALL), and subsequent Interim Staff Guidance.

(8)

Copy of evaluations performed for applicable external and internal operating

experience (OE) issues associated with license renewal. This request is limited to OE

items issued after entering the PEO.

(9)

Description of instances where examination scope expansion was required based on

the examination of an SSC in accordance with the AMP. Please describe the logic to

select the scope expansion, and any resulting changes to the AMP. (This request is

limited to work performed in the PEO.)

(10) Description of instances where AMP examinations/inspections were eliminated or

deferred. (This request is limited to work performed in the PEO.)

(11) Description of instances where examination/inspection scope changes were required

based on limitations encountered during the examination. (This request is limited to

work performed in the PEO.)

C. Information Requested to be Available During the Onsite Week of Inspection

(1)

Provide a brief presentation (informal) to the inspection team regarding aging

management at the site. Topics to be covered:

a.

How are aging related issues identified, documented, and evaluated within

the corrective action program and/or other aging tracking software/program.

b.

Describe which individuals and/or organizations are responsible for identifying

and evaluating aging related issues.

c.

Describe the responsibilities regarding age management, if any, of the following:

i.

System/Strategic Engineers

ii.

AMP Owners

iii.

Corporate office

(2)

Copy of simplified system drawings (a.k.a. Horse Notes or Training Notes).

(3)

A computer with network access to the sites corrective action program.