Letter Sequence ' |
|---|
|
|
MONTHYEARML24095A2562024-04-0303 April 2024 Kairos Power LLC, Core Design and Analysis Methodology for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor Project stage: Request ML24163A0272024-06-20020 June 2024 NRC Form 898, Topical Report Completeness Determination Project stage: Other ML24222A2762024-08-22022 August 2024 Audit Plan Kairos Core Design TR Project stage: Other ML25168A3412025-06-17017 June 2025 Kairos Power LLC, Core Design and Analysis Methodology for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor (KP-TR-024, Revision 1) Project stage: Request ML24163A1082025-06-20020 June 2025 Email Transmitting NRC Form 897 Topical Report Withholding Determination Project stage: Other ML24163A0942025-06-20020 June 2025 KP-TR-024, - KP-FHR Core Design and Analysis Methodology Topical Report Project stage: Other ML25206A0852025-07-25025 July 2025 Kairos Power Pre-App Doc - Kairos KP-FHR Core Design and Analysis Methodology Topical Report - Draft Safety Evaluation Project stage: Request ML25206A3722025-11-25025 November 2025 Final SE Kairos Core Design Methodology TR (Public) Project stage: Approval ML25206A3662025-11-25025 November 2025 Transmittal Letter Final SE for Kairos Core Design TR Project stage: Approval ML25329A3402025-12-16016 December 2025 NRC Form 896 -A Topical Report Verification Project stage: Other ML25329A3432025-12-16016 December 2025 Email Transmitting Form 896 -A TR Verification Project stage: Other 2025-11-25
[Table View] |