DATE: MAY 22, 2025 TIME: 2:00PM - 5:00PM PUBLIC MEETING ON QUALITY ASSURANCE REVIEW FOR FRAMATOME TXS COMPACT TOPICAL REPORT, ANP-10357P, REV. 0
Meeting Agenda Time Topic Speaker OPEN SESSION 2:00pm Introductions & Opening Remarks NRC & Framatome 2:10pm Quality Assurance Discussion NRC 2:30pm Public Questions/Comments NRC & Public 2:35pm End of Open Session CLOSED SESSION 2:40pm Quality Assurance Discussion Framatome 4:15pm Break All 4:30pm Summary & Next Steps NRC & Framatome 5:00pm Meeting Adjourn All
Regulatory Basis Appendix B to Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants, to Title 10 of the Code of Federal Regulations, (10 CFR) Part 50, Domestic Licensing of Production and Utilization Facilities, prescribes requirements for quality assurance (QA) to ensure that structures, systems, and components (SSCs) will perform satisfactorily in service. Specific criteria in Appendix B to 10 CFR Part 50 that are applicable to this request for additional information include:
Criterion II, Quality Assurance Program, requires the identification of SSCs to be covered by the QA program.
Criterion III, Design Control, requires in part that (1) measures be established for the selection and review for suitability of application of materials, parts, equipment, and processes that are essential to the safety-related functions of SSCs, and (2) quality standards be specified and that design control measures shall provide for verifying or checking the adequacy of design.
Criterion IV, Procurement Document Controls, requires that measures be established to assure that applicable regulatory requirements, design bases, and other requirements are suitably included or referenced in the documents for procurement of materials, equipment, and services.
Criterion VII, Control of Purchased Material, Equipment, and Services," addresses control of purchased material, equipment, and services.
March 31-April 4, 2025, Audit Observations
- The NRC staff plans to discuss specific observations from the audit during the closed session.
- The NRC staff plans to discuss a path forward regarding the Quality Assurance aspect of the TXS Compact Topical Report review.
Current Review Schedule Milestone Date Submittal August 2, 2024 Acceptance October 7, 2024 Audit (In-person)
March 31-April 4, 2025 Issue Requests for Additional Information (RAI) -
Set #1 May 30, 2025 Supporting documentation Submittal TBD Issue RAIs - Set #2 July 31, 2025 Response to RAIs - Set #1 July 31, 2025 Response to RAIs - Set #2 September 30, 2025 Issue Draft SE February 20, 2026 Issue Final SE April 30, 2026
Next Steps Summary Discuss next steps Issue summary in 30 days.
Additional documentation Discuss plan for docketing documents on the portal.
1.
Audit 1.
Discuss path forward.
2.
RAIs 1.
NRC staff plans to issue requests for additional information (RAIs).