ML25121A217
| ML25121A217 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 04/29/2025 |
| From: | Office of Public Affairs Region II |
| To: | |
| References | |
| News Release-II-25-011 | |
| Download: ML25121A217 (1) | |
Text
No: II-25-011 April 29, 2025
Contact:
Dave Gasperson, 404-997-4417 NRC Schedules Open House to Discuss McGuire Nuclear Station Performance Nuclear Regulatory Commission staff will hold an open house May 6 to discuss the 2024 safety performance of the McGuire Nuclear Station. The plant, which has two units, is located in Huntersville, North Carolina, and operated by Duke Energy.
The event will run from 6-7 p.m. Eastern time at the EnergyExplorium, 13339 McGuire Nuclear Station Road, in Huntersville. NRC employees responsible for plant inspections, including the resident inspectors based full-time at the site, will be available to answer questions at the event.
The NRC concluded the McGuire plant operated safely throughout 2024. All inspection findings and performance indicators were of very low safety significance. As a result, the plant remains under the agencys normal level of oversight, which includes thousands of hours of inspections each year.
The NRC Reactor Oversight Process uses color-coded inspection findings and performance indicators to measure plant performance. The colors start at green and increase to white, yellow, or red based on the safety significance of the issues involved. Inspection findings or performance indicators with more than very low safety significance trigger increased NRC oversight.
The annual assessment letter for the McGuire plant, including upcoming inspection plans, is available on the NRC website. Current performance information for both units is also available and updated quarterly.
P T bA#y P T bA#y P T 3bA#y P T 4bA#y P1TB5bA#y1 P1TB6bA#y1 P T 7bA#y P T 8bA#y