Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides
ML25118A244
Person / Time
Site: Millstone  
Issue date: 04/28/2025
From:
Division of Operating Reactors
To:
References
Download: ML25118A244 (1)


Text

Millstone Units 2 & 3 2024 Annual Assessment Meeting Reactor Oversight Process Nuclear Regulatory Commission Region I April 30, 2025 ML25118A244

Agenda

  • Opening Remarks
  • 2024 Millstone Reactor Oversight Process (ROP) Assessment Summary
  • Q&A 2

Overall Assessment Millstone Units 2 and 3 were operated safely in 2024 and continue to operate safely today 3

Inspection and Oversight

  • Three full-time residents assigned to Millstone Justin Fuller Dominic Antonangeli Earl Bousquet Senior Resident Resident Inspector Resident Inspector 4

Reactor Oversight Process 5

  • Baseline Inspection Program

- Minimum level of inspection conducted at all facilities regardless of their performance.

- Events involving reactor facilities are investigated in a timely, objective, systematic and technically sound manner.

  • Supplemental Inspections (e.g., IP 95001)

- Applies NRC inspection resources in a graded manner when risk-significant performance issues are identified.

6 Types of Inspections

7 Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Licensee

Response

Regulatory

Response

Degraded Performance Multiple/Repetitive Degraded Cornerstone Unacceptable Performance Action Matrix Concept

Millstone Units 2 & 3 2024 Assessment Summary Operated safely and in a manner that preserved the public health and safety and protected the environment Licensee Response Column Regulatory Response Column April 11, 2024, to July 11, 2024 9495 hours0.11 days <br />2.638 hours <br />0.0157 weeks <br />0.00361 months <br /> of inspection and related activities Green Performance Indicators 11 Green Findings and 4 Severity Level IV Violations A Greater-Than-Green finding and Greater-Than-Severity Level IV violation in the Security cornerstone 8

Safety Culture Cross-Cutting Aspects No Human Performance concerns 2024 Problem Identification and Resolution (PI&R) Inspection No SCWE concerns Allegations 3 allegations in 2024 (National Avg. = 3)

Resident inspectors and regional staff are highly accessible and take all allegation matters seriously 9

Millstone Finding Summary - 2024

  • Security Cornerstone Greater-than-Green Finding and Greater-than-Severity Level IV Violation

- Special Inspection Report, November 16, 2023 (ML24010A182)

- Special Inspection Follow-up Report and Choice Letter, April 25, 2024 (ML24116A045)

- Final Significance Determination and Notice of Violation, May 2, 2024 (ML24123A204)

- Supplemental Inspection Report, August 6, 2024 (ML24219A016)

- NCV 05000336/2024001-01, Failure to Implement Structures Monitoring, Infrequently Accessed Areas, and Buried Piping Aging Management Programs for the Condensate Storage Tank (CST) Pipe Trench 10

Millstone Power History - 2024 11 Date Unit Cause January 9, 2024 3

Unplanned Downpower - Feedwater Leak Repair September 4, 2024 3

Planned Maintenance Outage - Pressurizer Safety Relief Valve Replacement October 4, 2024 2

Refueling Outage November 14, 2024 2

Unplanned Downpower - Switchyard Repair

Millstone Licensee Event Reports - 2024 Event Date Unit Topic Status October 20, 2023 3

Pressurizer power operated relief valve failed to open during surveillance testing resulting in a condition prohibited by Technical Specifications Closed (Inspection Report 2024004)

April 14, 2024 2

Control room air conditioning unit inoperable due to refrigerant overcharge resulting in a condition prohibited by Technical Specifications Closed (Inspection Report 2024002)

August 21, 2024 3

Loss of safety function and condition prohibited by Technical Specifications for loss of secondary containment boundary Closed (Inspection Report 2024004)

October 1, 2024 2

Two main steam safety valves failed to lift within the acceptance criteria resulting in a condition prohibited by Technical Specifications Open October 10, 2024 3

Door latch failure resulted in loss of safety function for secondary containment boundary Closed (Inspection Report 2024004) 12

Office of Public Affairs Diane Screnci Diane.Screnci@nrc.gov 610-337-5330 13

NRC Social Media Channels

  • Facebook www.facebook.com/nrcgov
  • Twitter twitter.com/nrcgov
  • YouTube www.youtube.com/user/NRCgov
  • Instagram www.instagram.com/nrcgov
  • Flickr www.flickr.com/photos/nrcgov/sets
  • LinkedIn www.linkedin.com/company/u-s--nuclear-regulatory-commission/mycompany/
  • GovDelivery service.govdelivery.com/accounts/USNRC/subscriber/new 14

More Information

  • Inspection Reports

- https://www.nrc.gov/reactors/operating/oversight/listofrpts-body.html

  • Reactor Oversight Process

- https://www.nrc.gov/reactors/operating/oversight.html

  • Fact Sheets and Brochures

- https://www.nrc.gov/reading-rm/doc-collections/fact-sheets/

  • NRC Information Digest

- https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/

  • Regulations

- https://www.nrc.gov/reading-rm/doc-collections/cfr/

15

Annual Assessment Meeting Feedback Ways to submit feedback:

  • Scan QR Code
  • Visit the NRC Public Meeting Schedule after the meeting and click the Meeting Feedback Form link Meeting number: 20250469 16

Questions and Answers 17

18 This Ends the Meeting Thank You for Attending