ML25098A002

From kanterella
Jump to navigation Jump to search
Nuclear Power Plant, Units 1 and 2 - Security Baseline Inspection Report 05000317/2025401 and 05000318/2025401
ML25098A002
Person / Time
Site: Calvert Cliffs  
Issue date: 04/08/2025
From: Brice Bickett
Decommissioning, ISFSI, and Reactor Health Physics Branch
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2025401
Download: ML25098A002 (1)


Text

April 8, 2025 David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)

Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000317/2025401 AND 05000318/2025401

Dear David Rhoades:

On April 3, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Calvert Cliffs Nuclear Power Plant, Units 1 and 2, and discussed the results of this inspection with Peter Moodie, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety & Security Docket Nos. 05000317 and 05000318 License Nos. DPR-53 and DPR-69

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV BRICE BICKETT Digitally signed by BRICE BICKETT Date: 2025.04.08 07:56:08 -04'00'

ML25098A002 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRSS RI/DRSS RI/DRSS RI/DRSS NAME KHussar SMcCarver CDavis BBickett DATE 4/8/2025 4/07/2025 04/07/2025 4/8/2025

Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Numbers:

05000317 and 05000318 License Numbers:

DPR-53 and DPR-69 Report Numbers:

05000317/2025401 and 05000318/2025401 Enterprise Identifier: I-2025-401-0016 Licensee:

Constellation Energy Generation, LLC Facility:

Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Location:

Lusby, MD Inspection Dates:

March 31, 2025 to April 03, 2025 Inspectors:

K. Hussar, Senior Physical Security Inspector S. McCarver, Physical Security Inspector C. Davis, Physical Security Inspector Approved By:

Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety & Security

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Calvert Cliffs Nuclear Power Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

3 INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS 71130.02 - Access Control The inspectors evaluated the access control program through completion of the following inspection elements:

Access Control (1 Sample)

(1)

Tier I: All Requirements Tier II: 8 Requirements (02.06 a, 02.07 a, 02.08 a - e, i)

Tier III: 1 Requirement (02.09) 71130.04 - Equipment Performance, Testing, and Maintenance The inspectors evaluated the security equipment testing and maintenance program through completion of the following inspection elements:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

Tier I: All Requirements Tier II: 6 Requirements (02.09 a, 02-11 a - d, 02.12 a)

Tier III: All Requirements 71130.07 - Security Training The inspectors evaluated the security training program through completion of the following inspection elements:

Security Training (1 Sample)

(1)

Tier I: All Requirements Tier II: 10 Requirements (02.05 a - d, 02.06 a - b, 02.07 a, 02.08 a, 02.09 a - b)

Tier III: 7 Requirements (02.10, 02.11 a, 02.12 a - b, 02.13 a - c)

4 71130.09 - Security Plan Changes The inspectors evaluated the security plan changes through completion of the following inspection elements:

Security Plan Changes (1 Sample)

(1)

Since the last NRC baseline inspection of this program area, Security Plan Revision 18 was implemented. Based on Calvert Cliffs' evaluation, and in accordance with 10 CFR 50.54(p)(2), the change resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan change to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of this change. Therefore, the change remains subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE 71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

(1 Sample)

(1)

April 01, 2024 through December 31, 2024 INSPECTION RESULTS No findings were identified.

EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.

On April 3, 2025, the inspectors presented the security baseline inspection results to Peter Moodie, Site Vice President, and other members of the licensee staff.

5 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date 71130.02 Corrective Action Documents 04785121 04787099 04799252 04806180 04831591 Procedures SY-AA-101-106 Control and Classification of Safeguards Information (SGI) and Sensitive Unclassified Non-Safeguards Information (SUNSI)

Revision 23 SY-AA-101-110 Security Sealing Operations Revision 14 SY-AA-101-112 Constellation Security Search Processes Revision 39 SY-AA-101-117 Processing and Escorting of Personnel and Vehicles Revision 34 SY-AA-101-118 Control of Badges Revision 11 SY-AA-101-120 Control of Security Access Control Devices Revision 10 SY-AA-101-124 Operation of the Security Control Centers Revision 16 SY-CA-101-119 OCA Material Search for Entry Into PA Revision 1 71130.04 Corrective Action Documents 04783465 04785107 04785991 04786594 04806906 04828958 Corrective Action Documents Resulting from Inspection 04852347 04851926 04851845 Procedures SY-AA-101-122 Testing Security Equipment Revision 23 SY-AA-101-145 Security Standards Of Conduct Revision 19 SY-AA-150-103-F-01 Record of Semi-Annual Functionality and Accuracy Test and Firearms Maintenance Revision 1 SY-CA-101-122 Security System Testing Revision 10 SY-CA-1015-F-02 Quarterly Duty Firearms Inspection/Cleaning Form Revision 6

6 Inspection Procedure Type Designation Description or Title Revision or Date 71130.07 Corrective Action Documents 04797841 Corrective Action Documents Resulting from Inspection 04820974 Miscellaneous IQT #16 Determine Amount of Force to Prevent an Unauthorized Act Revision 6 IQT #8 Conduct Security Patrols Revision 7 Lesson Plan 1108 CCNPP Use of Force 01/09/2025 N-AN-SY-LP-4301X Annual Written Examination Procedures SY-AA-150-101-F-15 Weapons Familiarization Training Worksheet Revision 1 SY-AA-150-101-F-44 Weapons Familiarization Training Revision 1 SY-AA-150-104 Constellation Nuclear Security OJT Program Revision 3 SY-AA-150-105-F-01 Physical Exertion Information Revision 1 SY-CA-101-145 Security Standards of Conduct Revision 19 SY-CA-101-501 Defensive Strategy Revision 18 Self-Assessments 2025 Security Training Self-Assessment Report 02/21/2025 NOSA-CAL-23-01 Security Programs Audit Report 2023 02/08/2023 NOSA-CAL-25-01 Security Programs Audit Report 2025 02/25/2025 71130.09 Corrective Action Documents AR 04830106 Miscellaneous Calvert Cliffs Nuclear Power Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (SGI)

Revision 18 71151 Procedures LS-AA-2160 Monthly Data Elements for NRC ROP Indicator - Protected Area Security Equipment Performance Index Revision 5 SY-AA-101-155 Security Events and Nuclear Regulatory Commission Performance Indicators Revision 11