NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - Application to Revise TS to Adopt TSTF-65-A, Revision 1, Use of Generic Titles - EPID L-2025-LLA-0041
ML25094A020
Person / Time
Site: Columbia 
Issue date: 04/03/2025
From: Mahesh Chawla
NRC/NRR/DORL/LPL4
To: Collis T
Office of Nuclear Reactor Regulation
References
L-2025-LLA-0041
Download: ML25094A020 (3)


Text

From:

Mahesh Chawla Sent:

Thursday, April 3, 2025 6:58 PM To:

Collis, Tracey M.

Cc:

Craig Harbuck; Tony Nakanishi; Shivani Mehta; Patricia Vossmar; Russ Bywater; Christopher Highley; Jason Brodlowicz

Subject:

LIC-109 Acceptance Review - Columbia Generating Station - Application to Revise TS to Adopt TSTF-65-A, Revision 1, Use of Generic Titles - EPID: L-2025-LLA-0041 Importance:

High

Dear Ms.Collis,

By \

letter dated February 27, 2025 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML25058A497), as supplemented by letter dated April 1, 2025 (ML25091A193), Energy Northwest (the licensee) submitted a license amendment request (LAR) to revise the Technical Specifications (TS) for Columbia Generating Station (Columbia).

The proposed amendment adopts NRC-approved Technical Specifications Task Force (TSTF)

Traveler TSTF-65-A, Revision 1. The proposed change will allow the use of generic personnel titles instead of plant-specific titles. Additionally, an enhancement is proposed to replace the term "plant-specific titles" with "generic titles" in TS Section 5.0 Administrative Controls and to use appropriately de-capitalized titles for positions, ensuring consistency with the Columbia TS listed sections. None of the proposed changes result in changes to technical requirements.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the TS) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 5 months, which is August 15, 2025. If there are

emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application, and they could change due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at (301) 415-8371.

Mahesh(Mac) Chawla, Project Manager Licensing Branch LPL4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301) 415-8371 Email: Mahesh.Chawla@nrc.gov

Hearing Identifier:

NRR_DRMA Email Number:

2749 Mail Envelope Properties (PH0PR09MB1041580E328A8F8AEA7D743BDF1AE2)

Subject:

LIC-109 Acceptance Review - Columbia Generating Station - Application to Revise TS to Adopt TSTF-65-A, Revision 1, Use of Generic Titles - EPID L-2025-LLA-0041 Sent Date:

4/3/2025 6:57:44 PM Received Date:

4/3/2025 6:57:00 PM From:

Mahesh Chawla Created By:

Mahesh.Chawla@nrc.gov Recipients:

"Craig Harbuck" <Craig.Harbuck@nrc.gov>

Tracking Status: None "Tony Nakanishi" <Tony.Nakanishi@nrc.gov>

Tracking Status: None "Shivani Mehta" <Shivani.Mehta@nrc.gov>

Tracking Status: None "Patricia Vossmar" <patricia.vossmar@nrc.gov>

Tracking Status: None "Russ Bywater" <Russell.Bywater@nrc.gov>

Tracking Status: None "Christopher Highley" <Christopher.Highley@nrc.gov>

Tracking Status: None "Jason Brodlowicz" <jason.brodlowicz@nrc.gov>

Tracking Status: None "Collis, Tracey M." <tmcollis@energy-northwest.com>

Tracking Status: None Post Office:

PH0PR09MB10415.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 4093 4/3/2025 6:57:00 PM Options Priority:

High Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: