ML25091A292
| ML25091A292 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 04/01/2025 |
| From: | Duke Energy Progress |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML25091A290 | List: |
| References | |
| RA-25-0067 | |
| Download: ML25091A292 (1) | |
Text
Enclosure 1 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NUMBER 2 SUBSEQUENT LICENSE RENEWAL APPLICATION ENCLOSURE
SUMMARY
ENCLOSURE
SUMMARY
- H.B. Robinson Steam Electric Plant, Unit Number 2 Subsequent License Renewal Application Enclosure Summary : Application for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 : Affidavit CAW-24-032 for Westinghouse WCAP-15628-P, Revision 1 : Affidavit CAW-24-056 for Westinghouse WCAP-18900-P, Revision 0 : Affidavit CAW-24-058 for Westinghouse WCAP-18944-P, Revision 1 : Affidavit CAW-25-009 for Westinghouse WCAP-18939-P, Revision 1 : H.B. Robinson Steam Electric Plant, Unit Number 2 Subsequent License Renewal Application : Subsequent License Renewal Application (Safety Report) : Subsequent License Renewal Application, Appendix E, Environmental Report : Non-proprietary Reference Documents and a Redacted Version of a Proprietary Reference Document (Public Version) :
WCAP-18909-NP, Determination of T0 for H.B. Robinson Unit 2 Heat Number W5214, Linde 1092 Weld Metal Based on Unirradiated Data, Revision 2, dated March 2025 :
WCAP-18933-NP, Determination of T0 for H.B. Robinson Unit 2 Heat Number W5214 Weld Metal and Upper Shell Plate W10201-1 Based on Available Irradiated Data, Revision 1, dated March 2025 :
WCAP-15628-NP, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for the H.B.
Robinson Unit 2 Nuclear Power Plant for the Subsequent License Renewal Program, Revision 1, dated May 2024 :
WCAP-18900-NP, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Piping Components for H.B. Robinson Unit 2, Revision 0, dated November 2024 :
WCAP-18939-NP, H.B. Robinson Unit 2 Subsequent License Renewal: Fracture Mechanics Assessment of Reactor Pressure Vessel Structural Steel Supports, Revision 1, dated January 2025 :
WCAP-18944-NP, H.B. Robinson Unit 2 Subsequent License Renewal: Reactor Vessel Upper Shelf Energy Equivalent Margins Analysis, Revision 1, dated December 2024 : 10 CFR 2.390 Withheld Proprietary Reference Documents (Non-Public Version)
WCAP-15628-P, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for the H.B.
Robinson Unit 2 Nuclear Power Plant for the Subsequent License Renewal Program, Revision 1, dated May 2024 :
WCAP-18900-P, Flaw Tolerance Evaluation for Susceptible Reactor Coolant Loop Cast Austenitic Stainless Steel Piping Components for H.B. Robinson Unit 2, Revision 0, dated November 2024 :
WCAP-18939-P, H.B. Robinson Unit 2 Subsequent License Renewal:
Fracture Mechanics Assessment of Reactor Pressure Vessel Structural Steel Supports, Revision 1, dated January 2025 :
WCAP-18944-P, H.B. Robinson Unit 2 Subsequent License Renewal:
Reactor Vessel Upper Shelf Energy Equivalent Margins Analysis, Revision 1, dated December 2024