ML25084A145

From kanterella
Jump to navigation Jump to search
Notification of North Anna Power Station, Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000338/2025010 and 05000339/2025010
ML25084A145
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/26/2025
From: Renee Taylor
NRC/RGN-II/DORS/EB1
To: Carr E
Virginia Electric & Power Co (VEPCO)
References
IR 2025010
Download: ML25084A145 (1)


See also: IR 05000338/2025010

Text

Eric S. Carr

President - Nuclear Operations

and Chief Nuclear Officer

Innsbrook Technical Center

5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT: NOTIFICATION OF NORTH ANNA POWER STATION UNITS 1 & 2

COMPREHENSIVE ENGINEERING TEAM INSPECTION - U.S. NUCLEAR

REGULATORY COMMISSION INSPECTION REPORT 05000338/2025010 AND

05000339/2025010

Dear Eric S. Carr:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a Comprehensive Engineering Team Inspection (CETI) at your North

Anna Power Station, Units 1 & 2, during the weeks of July 14 and July 28, 2025. Geoffrey

Ottenberg, a Senior Reactor Inspector from the NRCs Region II office, will lead the inspection

team. The inspection will be conducted in accordance with Inspection Procedure 71111.21M,

Comprehensive Engineering Team Inspection (CETI), issued October 7, 2022.

The inspection will evaluate the capability of components that have been modified and risk-

significant/low-margin components to function as designed and to support proper system

operation. The inspection will also include a review of selected operator actions, and operating

experience, and modifications.

We confirmed arrangements with . Bob Page for an information-gathering site visit and the two-

week onsite inspection. The schedule is as follows:

Information-gathering visit: Week of June 2, 2025

Onsite weeks: Weeks of July 14 and July 28, 2025

The purpose of the information-gathering visit is to meet with members of your staff to identify

components that have been modified, risk-significant components, and operator actions.

Information and documentation needed to support the inspection will also be identified.

Andy Rosebrook, a Region II Senior Reactor Analyst, will support Geoffrey. Ottenberg during

the information-gathering visit to review probabilistic risk assessment data and identify

components to be examined during the inspection. Additionally, during the onsite weeks, time

may be needed on the plant-referenced simulator to facilitate the development of operator

action-based scenarios.

The enclosure lists documents that will be needed prior to the information-gathering visit. Please

provide the referenced information to the Region II Office by Monday, May 26, 2025. Additional

documents will be requested following the information-gathering visit.

March 26, 2025

E. Carr

2

The inspectors will try to minimize your administrative burden by specifically identifying only

those documents required for inspection preparation. The additional information will be needed

in the Region II office by Friday, July 4, 2025, to support the inspection teams preparation

week. During the information-gathering trip, Mr. Ottenberg will also discuss the following

inspection support administrative details: (1) availability of knowledgeable plant engineering and

licensing personnel to serve as points of contact during the inspection; (2) method of tracking

inspector requests during the inspection; (3) licensee computer access; (4) working space;

(5) arrangements for site access; and (6) other applicable information.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for

Withholding.

Thank you for your cooperation in this matter. If you have any questions, regarding the

information requested or the inspection, please contact Mr. Ottenberg at 404-997-4658 or

contact me at 404-997-4630.

Sincerely,

Ryan C. Taylor, Chief

Engineering Branch 1

Division of Operating Reactor Safety

Docket Nos. 05000338 and 05000339

License Nos. NPF-4 and NPF-7

Enclosure:

Information Request for North Anna Power Station Units 1 & 2 Comprehensive Engineering

Team Inspection

cc w/ encl: Distribution via LISTSERV

Signed by Taylor, Ryan

on 03/26/25

ML25084A145

x

SUNSI Review

x

Non-Sensitive

Sensitive

x

Publicly Available

Non-Publicly Available

OFFICE

R2/DORS/EB1

R2/DORS/EB1

NAME

G. Ottenberg

R. Taylor

DATE

03/25/25

03/26/25

Enclosure

INFORMATION REQUEST FOR NOTH ANNA POWER STATION UNITS 1 & 2

COMPREHENSIVE ENGINEERING TEAM INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM (or FTP site, SharePoint, etc.). The CDROM (or website) should be indexed and

hyperlinked to facilitate ease of use. The requested items below, identified with an asterisk (*),

should have a date range from January 1, 2022, until present.

1.

  • List of modifications to systems, structures or components (SSCs) that are permanent

and field work completed. (For the purpose of this inspection, modifications include

permanent: plant changes, design changes, calculation changes, procedure changes, and

set point changes.)

The list should contain the number of the modification, a short description, affected system

and unit. If multiple categories/stages of modifications exist, provide a description of the

types relative to the coding scheme in your transmittal. Additionally, the list should be

categorized by quality level (i.e., safety or non-safety) as well as whether accompanied by

a screening or 10 CFR 50.59 evaluation. A query report return-field-set might look like:

1

e.g. If systems are provided with some type of number or acronym designation,

define the systems designation on a separate list or document

2

e.g. Engineering Design/Document Change, Design Change Notice, Test,

Experiment, etc.

3

e.g. Closed, Returned to Operation, Void, Partially Completed, Released for

Installation, Phase 1 Completed, etc.

4

e.g. Safety Related or Non-Safety Related

5

e.g. Screened Out or Full 10 CFR 50.59 Evaluation

2.

From your most recent probabilistic safety analysis (PSA) excluding external events and

fires:

a.Two risk rankings of components from your site-specific PSA: one sorted by

Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance

b.A list of the top 500 cut-sets

c.A list of the top 500 LERF contributors

3.

From your most recent PSA including external events and fires:

a.Two risk rankings of components from your site-specific PSA: one sorted by

RAW, and the other sorted by Birnbaum Importance

b.A list of the top 500 cut-sets

4.

Risk ranking of operator actions from your site-specific PSA sorted by RAW and human

reliability worksheets for these items

5.

List of time-critical operator actions with a brief description of each action with applicable

administrative procedures used to maintain them

6.

  • List of components with low-design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design-required output, heat exchangers close to

Identifier

Unit

System1

Description

Type2

Status3

QA Condition4

50.595

2

rated design heat removal, and motor-operated valve risk-margin rankings, etc.) and

associated evaluations or calculations

7.

  • List and brief description of Root Cause Evaluations performed

8.

  • List and brief description of common-cause component failures that have occurred

9.

List and brief description of equipment currently in degraded or nonconforming status as

described in NRC Generic Letter 91-18, Revision 1

10. *List and brief description of Operability Determinations and Functionality Assessments

11. *List and reason for equipment that has been classified in maintenance rule (a)(1) status

12. *List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list, and summaries (if

available) of your plans to address the issue(s) along with dates added or removed from

the issues list

13. List of current operator work arounds/burdens

14. Copy of Technical Specifications Bases

15. Copy of Technical Requirements Manual (TRM)

16. Copy of the Quality Assurance Program Description document

17. Copy of Corrective Action Program Procedure(s)

18. Copy of Operability Determination Procedure(s)

19. Copy of procedures addressing the following: Modifications, design changes, set point

changes, equivalency evaluations or suitability analyses, commercial grade dedications,

post-modifications testing, 10 CFR 50.59 screenings and evaluations, and UFSAR updates

20. Copy of procedures addressing the following: loss of service water system or ultimate heat

sink (UHS); controls to prevent clogging due to macrofouling; and performance, testing,

and inspection requirements for service water system and UHS

21. List of heat exchangers or equipment cooled by service water directly or indirectly. Include

the risk ranking for each listed heat exchanger.

22. List of motor operated valves and air operated valves in valve programs, and their

associated design margin and risk ranking

23. Primary AC and DC calculations for safety-related buses

24. One-line diagram of electrical plant (Electronic only)

25. Index and legend for electrical plant one-line diagrams

26. Piping and instrumentation diagrams (P&IDs) for safety-related systems (Electronic)

27. Index and legend for P&IDs

28. Index (procedure number, title, and current revision) of station Emergency Operating

Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures

3

29. Copies of corrective action documents generated from previous design bases assurance

inspections

30. Copy of any self-assessments performed, and corrective action documents generated, in

preparation for current comprehensive engineering team inspection

31. Contact information for a person to discuss PSA information prior to and during the

information-gathering trip (Name, title, phone number, and e-mail address)