Notification of Readiness for NRC 95001 Supplemental Inspection
ML25073A014
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 03/13/2025
From: Moodie P
Constellation Energy Group
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
Download: ML25073A014 (1)


Text

Constellation0

  • March 13, 2025 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 0001 Calvert Cliffs Nuclear Power Plant Unit Nos. 2; Docket No. 50-318 Renewed Facility Operating License No. DPR-69

Subject:

Notification of Readiness for NRC 95001 Inspection Peter F. Moodie Site Vice President Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby. MD 20657 410-495-5200 Office 603-548-7775 Mobile www constellat1on.com Peter Mood1e'1i constellat1on.com

References:

1. Letter from Blake Welling (NRC) to David P. Rhoades (Constellation Energy Generation, LLC), Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, (Report 05000318/2024007), dated November 6, 2024 (ADAMS Accession No. ML24309A247)

In the Reference 1 letter, Constellation Energy Generation, LLC (CEG) was informed that the Calvert Cliffs Nuclear Power Plant Unit 2 Unplanned Scrams per 70000 Critical Hours Performance Indicator had crossed the Green to White threshold due to four unplanned scrams in four (1tJarters As a result of this the NRC r!P.terminert thP. performance at Calvert Cliffs Nuclear Power Plant, Unit 2, to be in the Regulatory Response Column (Column 2) of the NRC's Reactor Oversight Process Action Matrix in Inspection Manual Chapter 0305, "Operating Assessment Program," as of July 1, 2024.

The NRC plans to conduct a supplemental inspection for this finding in accordance with Inspection Procedure 95001, "Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs," following CEG's notification of readiness for this inspection.

This letter notifies the NRC that Calvert Cliffs is ready for the supplemental inspection.

There are no new regulatory commitments contained in this letter. If you should have any questions, please contact Mr. Larry Smith, Regulatory Assurance Manager, at 667-313-6503.

Respectfu I ly,

~L-L-Peter F. Moodie Site Vice President PFM/LDS/jj cc:

USN RC Regional Administrator, Region I USNRC Senior Resident Inspector, CCNPP USNRC Project Manager, CCNPP S. Seaman, State of Maryland