Annual Assessment Letter for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024006)
ML25069A561
Person / Time
Site: FitzPatrick 
Issue date: 03/11/2025
From: Blake Welling
Division of Operating Reactors
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2024006
Download: ML25069A561 (1)


Text

March 11, 2025 David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)

Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2024006)

Dear David Rhoades:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of James A. FitzPatrick Nuclear Power Plant (FitzPatrick), reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at FitzPatrick during the fourth quarter of 2024 was within the Regulatory Response Column (Column 2) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Assessment Program. This conclusion was based on a single inspection finding having low-to-moderate safety significance (i.e., White) in the Mitigating Systems cornerstone originating in the third quarter of 2024, and all PIs within the expected range (i.e., Green).

Therefore, in addition to ROP baseline inspection activities planned for 2025, the NRC conducted a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs, from January 27-30, 2025. The inspection conclusions are detailed in the associated NRC Inspection Report 05000333/2025041 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML25065A041). A regulatory performance meeting was conducted in conjunction with the supplemental inspection exit meeting, which resulted in FitzPatrick returning to the Licensee Response Column (Column 1) of the NRCs ROP Action Matrix on January 30, 2025.

The enclosed inspection plan lists the inspections scheduled through December 31, 2026.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not

D. Rhoades 2

included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Jason Schussler at (610) 337-5345 with any questions you have regarding this letter.

Sincerely, Blake D. Welling, Director Division of Operating Reactor Safety Docket No. 05000333 License No. DPR-59

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV BLAKE WELLING Digitally signed by BLAKE WELLING Date: 2025.03.11 09:16:58 -04'00'

ML25069A561 x

SUNSI Review x

Non-Sensitive Sensitive x

Publicly Available Non-Publicly Available OFFICE RI/DORS RI/DORS RI/DORS NAME DBeacon JSchussler BWelling DATE 3/11/2025 3/11/2025 3/11/2025

Site Inspection Activity Plan FitzPatrick 01/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count 2025 Fitz Initial License Examination 4

1 1/20/2025 1/24/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) 1 2/17/2025 2/21/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD) 95001 Supplemental Inspection - FitzPatrick Follow-up on Corrective Actions 2

1 1/27/2025 1/31/2025 IP 71153 000749 Follow Up of Events and Notices of Enforcement Discretion 1

1/27/2025 1/31/2025 IP 95001 000938 Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs Access Authorization, FFD - FP 2

1 2/3/2025 2/7/2025 IP 71130.01 000733 Access Authorization 1

2/3/2025 2/7/2025 IP 71130.08 000740 Fitness-For-Duty Program 1

2/10/2025 2/13/2025 IP 71130.01 000733 Access Authorization 1

2/10/2025 2/13/2025 IP 71130.08 000740 Fitness-For-Duty Program RP - 71124.01 Rad Hazards 1

1 4/21/2025 4/25/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Age Related Degradation Inspection - Fitzpatrick 3

1 4/28/2025 5/2/2025 IP 71111.21N.04 001832 Age-Related Degradation 1

5/12/2025 5/16/2025 IP 71111.21N.04 001832 Age-Related Degradation RP - 71124.05 Instruments 1

1 5/5/2025 5/9/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation EP Exercise Inspection - Fitzpatrick 5

1 7/14/2025 7/18/2025 IP 71114.01 000716 Exercise Evaluation 1

7/14/2025 7/18/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1

7/14/2025 7/18/2025 IP 71151 001397 Performance Indicator Verification PI&R Biennial Team Inspection - FitzPatrick 4

1 7/14/2025 7/18/2025 IP 71152B 000747 Problem Identification and Resolution 1

7/28/2025 8/1/2025 IP 71152B 000747 Problem Identification and Resolution ISFSI - IP 60859 License Renewal 2

1 7/15/2025 7/16/2025 IP 60859 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection RP - 71124.07 REMP 1

1 8/4/2025 8/8/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program Access Control, Maintenance, Sec Trng, SPR, PIs - FP 3

1 9/15/2025 9/19/2025 IP 71130.02 000734 Access Control 1

9/15/2025 9/19/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance Prepared on 2/18/2025 8:20:23 PM 1 of 3

Site Inspection Activity Plan 1

9/15/2025 9/19/2025 IP 71130.07 000739 Security Training 1

9/15/2025 9/19/2025 IP 71130.09 001656 Security Plan Changes 1

9/15/2025 9/19/2025 IP 71151 001338 Performance Indicator Verification RP - 71124.08 Rad Transportation PIV 1

1 10/20/2025 10/24/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1

10/20/2025 10/24/2025 IP 71151 000746 Performance Indicator Verification Cyber Security - Fitzpatrick 4

1 10/20/2025 10/24/2025 IP 71130.10 000741 Cybersecurity FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - FP 4

1 3/23/2026 3/27/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1

4/13/2026 4/17/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Comprehensive Engineering Team Inspection - FitzPatrick 7

1 4/27/2026 5/1/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1

5/11/2026 5/15/2026 IP 71111.21M 000713 Comprehensive Engineering Team Inspection Fitz Biennial Requal Inspection 1

1 5/4/2026 5/8/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP 71124.03 Fitz 1

1 5/4/2026 5/8/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Sec - Access Control, Equipment Testing and Maintenance, Training, SPR, PI Verification - FP 3

1 7/27/2026 7/31/2026 IP 71130.02 000734 Access Control 1

7/27/2026 7/31/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1

7/27/2026 7/31/2026 IP 71130.07 000739 Security Training 1

7/27/2026 7/31/2026 IP 71130.09 001656 Security Plan Changes 1

7/27/2026 7/31/2026 IP 71151 001338 Performance Indicator Verification EP Program Inspection - Fitzpatrick 1

1 8/3/2026 8/7/2026 IP 71114.02 000717 Alert and Notification System Testing 1

8/3/2026 8/7/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1

8/3/2026 8/7/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1

8/3/2026 8/7/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness 1

8/3/2026 8/7/2026 IP 71151 001397 Performance Indicator Verification 2026 Fitzpatrick Initial Operator Licensing Exam 4

1 6/8/2026 6/12/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) 1 8/10/2026 8/14/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

RP 71124.04 Fitz 1

1 8/17/2026 8/21/2026 IP 71124.04 000728 Occupational Dose Assessment Prepared on 2/18/2025 8:20:23 PM 2 of 3

Site Inspection Activity Plan Inservice Inspection - FitzPatrick 1

1 9/21/2026 9/25/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP 71124.01 and PIV Fitz 1

1 9/21/2026 9/25/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1

9/21/2026 9/25/2026 IP 71151 000746 Performance Indicator Verification Prepared on 2/18/2025 8:20:23 PM 3 of 3