ML25069A535
| ML25069A535 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/11/2025 |
| From: | Blake Welling Division of Operating Reactors |
| To: | Rhoades D Constellation Energy Generation, Constellation Nuclear |
| References | |
| IR 2024006 | |
| Download: ML25069A535 (1) | |
Text
March 11, 2025 David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORTS 05000317/2024006 AND 05000318/2024006)
Dear David Rhoades:
The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs), Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.
The NRC determined the performance at Calvert Cliffs, Unit 1, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all performance indicators (PIs) were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at Calvert Cliffs, Unit 1.
The NRC determined the performance at Calvert Cliffs, Unit 2, during the most recent quarter was within the Regulatory Response Column (Column 2) of the NRCs ROP Action Matrix in Inspection Manual Chapter 0305, Operating Assessment Program. This conclusion was based on the Unplanned Scrams per 7000 Critical Hours PI having crossed the Green to White threshold during the third quarter of 2024 as discussed in an assessment follow-up letter, dated November 6, 2024 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML24309A247). Because the PI returned to the Green performance band in the fourth quarter of 2024, the NRC is administratively opening a parallel White PI finding, which will remain open until Calvert Cliffs, Unit 2, satisfactorily meets the objectives of the appropriate supplemental inspection. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs.
D. Rhoades 2
This inspection procedure is conducted to provide assurance that the root and contributing causes of risk significant performance issues are understood, the extent of condition and the extent of cause are identified, and the corrective actions are prompt and sufficient to prevent recurrence.
On February 24, 2025, your staff verbally notified the NRC of your readiness for the supplemental inspection to review the actions taken to address the performance issues.
Therefore, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs, scheduled to start on April 7, 2025.
The enclosed inspection plan lists the inspections scheduled through December 31, 2026.
The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Nicole Warnek at (610) 337-6954 with any questions you have regarding this letter.
Sincerely, Blake D. Welling, Director Division of Operating Reactor Safety Docket Nos. 05000317 and 05000318 License Nos. DPR-53 and DPR-69
Enclosure:
As stated cc w/ encl: Distribution via LISTSERV BLAKE WELLING Digitally signed by BLAKE WELLING Date: 2025.03.11 09:18:25 -04'00'
SUNSI Review X
Non-Sensitive Sensitive X
Publicly Available Non-Publicly Available OFFICE RI/DORS RI/DORS RI/DORS NAME RClagg NWarnek BWelling DATE 3/6/2025 3/7/2025 3/10/2025
Site Inspection Activity Plan Calvert Cliffs 01/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count Inservice Inspection - Calvert Cliffs Unit 2 1
2 2/24/2025 3/7/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP-71124.01-RadHazard 1
2 3/3/2025 3/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Access Control, Equipment, Sec Trng, Sec Plan Review, PI - CC 3
1,2 3/31/2025 4/4/2025 IP 71130.02 000734 Access Control 1,2 3/31/2025 4/4/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 3/31/2025 4/4/2025 IP 71130.07 000739 Security Training 1,2 3/31/2025 4/4/2025 IP 71130.09 001656 Security Plan Changes 1,2 3/31/2025 4/4/2025 IP 71151 001338 Performance Indicator Verification 95001 Supplemental Inspection - Calvert Cliffs Follow-up on Corrective Actions 2
2 4/7/2025 4/11/2025 IP 95001 000938 Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs Cyber Security - Calvert Cliffs 4
1,2 4/21/2025 4/25/2025 IP 71130.10 000741 Cybersecurity 2025 CC Initial Operator Licensing Exam 4
1,2 5/26/2025 5/30/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) 1,2 6/23/2025 6/27/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Comprehensive Engineering Team Inspection - Calvert Cliffs 7
1,2 6/9/2025 6/13/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 6/16/2025 6/20/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2 6/23/2025 6/27/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection Material Control and Accounting - Calvert Cliffs 1
1,2 8/11/2025 8/15/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
EP Program Inspection - Calvert Cliffs 2
1,2 9/8/2025 9/12/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 9/8/2025 9/12/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 9/8/2025 9/12/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 9/8/2025 9/12/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 9/8/2025 9/12/2025 IP 71151 001397 Performance Indicator Verification PI&R Biennial Team Inspection - Calvert Cliffs 4
1,2 9/15/2025 9/19/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 9/29/2025 10/3/2025 IP 71152B 000747 Problem Identification and Resolution Prepared on 2/12/2025 9:48:55 AM 1 of 3
Site Inspection Activity Plan RP-71124.08-Radwaste 1
1,2 9/22/2025 9/26/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CC 5
1,2 10/6/2025 10/10/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 10/27/2025 10/31/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RP-71124.05-Instrumentation and IP-71151-PIV 1
1,2 11/3/2025 11/7/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 11/3/2025 11/7/2025 IP 71151 000746 Performance Indicator Verification CC Requal Inspection with P/F Results 2
1,2 11/17/2025 11/21/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 11/17/2025 11/21/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Sec - AA, FFD - CC 2
1,2 1/26/2026 1/30/2026 IP 71130.01 000733 Access Authorization 1,2 1/26/2026 1/30/2026 IP 71130.08 000740 Fitness-For-Duty Program 1,2 2/23/2026 2/27/2026 IP 71130.01 000733 Access Authorization 1,2 2/23/2026 2/27/2026 IP 71130.08 000740 Fitness-For-Duty Program Inservice Inspection - Calvert Cliffs Unit 1 1
1 2/23/2026 3/6/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
2 3/2/2026 3/6/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Fire Protection - Calvert Cliffs 3
1,2 4/20/2026 4/24/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) 1,2 5/4/2026 5/8/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) 2026 CC Initial Operator Licensing Exam 4
1,2 5/4/2026 5/8/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) 1,2 6/22/2026 6/26/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
RP - 71124.03 Airborne and 71124.04 Dose 1
1,2 5/11/2026 5/15/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 5/11/2026 5/15/2026 IP 71124.04 000728 Occupational Dose Assessment EP Exercise Inspection - Calvert Cliffs 5
1,2 9/14/2026 9/18/2026 IP 71114.01 000716 Exercise Evaluation 1,2 9/14/2026 9/18/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 9/14/2026 9/18/2026 IP 71151 001397 Performance Indicator Verification Sec - Access Control, Equipment Testing and Maintenance, Training, SPR, PI Verification, ISFSI - CC 3
Prepared on 2/12/2025 9:48:55 AM 2 of 3
Site Inspection Activity Plan 1,2 11/16/2026 11/20/2026 IP 71130.02 000734 Access Control 1,2 11/16/2026 11/20/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 11/16/2026 11/20/2026 IP 71130.07 000739 Security Training 1,2 11/16/2026 11/20/2026 IP 71130.09 001656 Security Plan Changes 1,2 11/16/2026 11/20/2026 IP 71151 001338 Performance Indicator Verification 1,2 11/16/2026 11/20/2026 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 2/12/2025 9:48:55 AM 3 of 3