15800 Northup Way, Bellevue, WA 98008 www.TerraPower.com P. +1 (425) 324-2888 F. +1 (425) 324-2889 February 27, 2025 TP-LIC-LET-0403 Docket Number 50-613 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTN: Document Control Desk
Subject:
Transmittal of TerraPower Tribal Information Workshop Presentation TerraPower, LLC (TerraPower) on behalf of US SFR Owner, LLC (USO), a wholly owned subsidiary of TerraPower, submits this letter to provide TerraPower Tribal Information Workshop Presentation. Enclosure 1 contains the Tribal Information Workshop Presentation.
This letter and enclosure make no new or revised regulatory commitments.
If you have any questions regarding this submittal, please contact Nick Kellenberger at nkellenberger@terrapower.com.
Sincerely, George Wilson Vice President of Regulatory Affairs TerraPower, LLC
Enclosure:
- 1.
TerraPower Tribal Information Workshop Presentation
February 27, 2025 Page 2 of 2 cc:
Mallecia Sutton, NRC Josh Borromeo, NRC Patricia Vokoun, NMSS Daniel Barnhurst, NMSS Nathan Howard, DOE Jeff Ciocco, DOE
TP-LIC-LET-0403 TerraPower Tribal Information Workshop Presentation
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Natrium reactor is a TerraPower & GE Hitachi technology Tribal Information Workshop February 25, 2025 Kemmerer Power Station Unit 1
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Kemmerer Power Station Unit 1 2
- TerraPower selected as participant in DOEs Advanced Reactor Demonstration Program
- The Natrium project is demonstrating the ability to design, license, construct, startup and operate a Natrium reactor.
- The construction permit application for the Natrium project was submitted on March 28, 2024, and is currently under NRC staff review.
- Natrium Reactor Plant is an 840-megawatt thermal pool-type sodium-cooled fast neutron spectrum reactor that contains a molten salt energy storage system which enables the plant to vary its supply of electrical energy to the grid, up to 500 megawatts electric net, while maintaining constant reactor power
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Kemmerer Power Station Unit 1 3
- TerraPower/USO and partners
- Natrium Reactor Plant
- Lincoln County south of Kemmerer and Diamondville
- Construction beginning 2025
- Reduce carbon emissions
- Advance US nuclear power industry
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Project Location 4
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved 5
1 2
3 4
5 6
7 1.
Fuel Handling Building 2.
Reactor Building 3.
Control Building 4.
Reactor Auxiliary Building 5.
Salt Piping 6.
Steam Generation 7.
Turbine Building 1
2 3
4 5
6 7
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Natrium reactor is a TerraPower & GE Hitachi technology 3D Model Virtual Tour
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved 7
Reactor Aux. Building Intermediate Sodium Hot Leg Intermediate Sodium Cold Leg Reactor and Core Intermediate Air Cooling Head Access Area Refueling Access Area Reactor Air Cooling / Reactor Cavity Reactor Building Fuel Handling Building Reactor Air Cooling Ducts Spent Fuel Pool (water)
Sodium Int. loop Sodium/Salt HXs Salt Piping to/from Thermal Storage System Ground Level Nuclear Island
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Control Motor-driven control rod runback and scram follow Gravity-driven control rod scram Inherently stable with increased power or temperature Cool In-vessel primary sodium heat transport (limited penetrations)
Intermediate air cooling natural draft flow Reactor air cooling natural draft flow - always on Contain Low primary and secondary pressure Sodium affinity for radionuclides Multiple radionuclides retention boundaries Safety Features 8
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved
- Simplified Response to Abnormal Events
- Reliable reactor shutdown
- Transition to coolant natural circulation
- Indefinite passive emergency decay heat removal
- Low pressure functional containment
- No reliance on Energy Island for safety functions
- No Safety-Related Operator Actions or AC power
- Pool-type Metal Fuel SFR with Molten Salt Energy Island
- Metallic fuel and sodium have high compatibility
- No sodium-water reaction in steam generator
- Large thermal inertia enables simplified response to abnormal events
- Technology Based on U.S. SFR Experience Safety Features 9
Emergency Planning Zone 10
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved HALEU Fuel Fabrication 11
- HALEU metal feedstock will be used for fuel assembly fabrication
- GNF will fabricate Natrium fuel at a new Category II facility in Wilmington, NC with operations starting in 2028
- GNF kicked off design and licensing of fuel shipping container
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved HALEU Fuel Storage 12
- Licensed under 10 CFR 72
- Spent Fuel Pool capacity for up to 10 years
- Independent Spent Fuel Storage Installation (ISFSI)
- Natrium Fuel compatible with existing LWR Casks
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Project Phases and Timeline 13 Activity Timeline Construction Permit Application Submittal March 2024 Industrial Siting Permit Application Approved January 2025 DOE NEPA Review Complete February 2025 Kemmerer Unit 1 Site Preparation Start Q2 2025 Nuclear Island First Concrete Q4 2026 Operating License Application Submittal Q3 2027 Kemmerer Unit 1 Construction Complete Q4 2029 Fuel Load Start Q3 2030
- Sodium Test and Fill Facility Construction
- Started May 2024
- Pre-Construction Activities
- DOE completed Final Environmental Assessment and Finding of No Significant Impact
- NRC Environmental Report and Construction Permit Application Review and Approval
- Kemmerer Unit 1 Operating License Submittal to NRC
- Operation-Power Generation
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Project Tribal Engagements 14
- Project initiated Tribal engagements in December 2021
- Project presented project briefing and initial survey plans for the consulting Tribal Nations in April 2022
- Field Surveys for the Class III Cultural Resources Inventory completed late summer 2022
- A total of 1,508 acres of private land was inventoried
- Tribal cultural specialists from three Tribes (Northern Arapaho Tribe, Comanche Nation, and Arapaho Tribe of Oklahoma) participated in the field work portion of the inventory
- Initial Class III report was shared with the Tribes for review August 23, 2022
- Tribal summit hosted in Kemmerer October 18, 2022
- Attended by representatives from Northern Arapaho, Northwestern Band of Shoshone, and Eastern Shoshone
- Tribal Blessing on April 29, 2024
- Participation from Northern Arapaho, Northwestern Band of Shoshone and Fort Belknap
- Wind River Job Corp Tour October 2024
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Cultural Resource Protection 15
- Training of all workers about importance of:
- Avoiding and protecting cultural resources
- Remaining outside exclusion areas
- Notifying supervisors of possible discoveries
- Archaeologist monitors any work conducted near the exclusion areas
- Archaeologist conducts monthly inspections to ensure protection measures are being followed and are effective.
- To date, all measures have been implemented as planned and have been effective
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Construction Facilities Plan with Cultural Site Overlay 16 Figure Withheld Under 10 CFR 2.390(a)(3) Sensitive Unclassified Nonsafeguards Information
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Cultural Site Overlay 17 Figure Withheld Under 10 CFR 2.390(a)(3) Sensitive Unclassified Nonsafeguards Information Figure Withheld Under 10 CFR 2.390(a)(3) Sensitive Unclassified Nonsafeguards Information
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Site 48LN740 18 Figure Withheld Under 10 CFR 2.390(a)(3) Sensitive Unclassified Nonsafeguards Information
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved Site 48LN8940 19 Figure Withheld Under 10 CFR 2.390(a)(3) Sensitive Unclassified Nonsafeguards Information
SUBJECT TO DOE COOPERATIVE AGREEMENT NO. DE-NE0009054 Copyright © 2025 TerraPower, LLC. All Rights Reserved
- NRC notification of adverse effects letter (February 4, 2025)
- Class III cultural resource survey review WYSHPO, ACHP and Tribes
- Historic Properties Treatment Plan
- NRC to initiate drafting Memorandum of Agreement Cultural Resources - Next Steps 20