Nicole Flippin Site Vice President Catawba Nuclear Station Duke Energy Carolinas, LLC 4800 Concord Road York, SC 29745-9635

SUBJECT:

CATAWBA NUCLEAR STATION - NOTIFICATION OF NRC SUPPLEMENTAL INSPECTION (95001) AND REQUEST FOR INFORMATION

Dear Nicole Flippin:

By letter dated September 5, 2024 (ADAMS ML24234A291), the U.S. Nuclear Regulatory Commission (NRC) communicated to Duke Energy the final significance determination of a finding having low-to-moderate safety significance (White) at Catawba Nuclear Station, Unit 2.

The finding was associated with a failure to maintain the functionality of the emergency ventilation system which resulted in 2A emergency diesel generator inoperability.

On February 21, 2025; Kevin Ellis, General Manager of Regulatory Affairs, Policy, and Emergency Preparedness; notified Robert Williams, Chief, Projects Branch 1; of Duke Energys readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the White finding. Accordingly, the NRC plans to conduct a supplemental inspection, beginning on March 10, 2025, at Catawba Nuclear Station, Unit 2 using Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response)

Inputs. This on-site inspection is scheduled to be performed March 10 through March 14, 2025.

In order to minimize the impact to your on-site resources and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for this inspection. It is important that all of the documents are up-to-date and complete in order to minimize the number of additional documents requested during the on-site portion of the inspection. To the extent possible, please organize the information as specified in the Request for Information.

Experience has shown that poorly organized files can lead to a less efficient inspection and places additional burden on licensee staff. Secure file server access such as Certrec or SharePoint is preferred. During the inspection, the inspectors may request additional documents. If there are questions regarding the documents or material requested, or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector, Jamin Seat, at (404) 997-4475. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms.

Sherry Andrews of your organization.

February 27, 2025

N. Flippin 2

2 In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Robert Williams, Chief Projects Branch 1 Division of Operating Reactor Safety Docket No. 05000414 License No. NPF-52

Enclosure:

Supplemental Inspection Document Request cc w/encl: Distribution via LISTSERV Signed by Williams, Robert on 02/27/25

N. Flippin 3

SUBJECT:

CATAWBA NUCLEAR STATION - NOTIFICATION OF NRC SUPPLEMENTAL INSPECTION (95001) AND REQUEST FOR INFORMATION DATED FEBRUARY 27, 2025 DISTRIBUTION J. Seat, RII, DORS R. Williams, RII, DORS ADAMS ACCESSION NUMBER: ML25058A103 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DRS NAME R. Williams DATE 2/27/25 OFFICIAL RECORD

Enclosure SUPPLEMENTAL INSPECTION DOCUMENT REQUEST Inspection Report: 05000414/2025040 Inspection Dates:

March 10-14, 2025 Inspection Procedure:

IP 95001 Please assemble the following documents and upload to your secure file server (e.g., Certrec) or SharePoint before March 5, 2025. Please ensure the documents are text searchable.

Information provided onsite should be the latest approved documentation. The information should be transmitted in such a manner as to reach the addressee by the specified date. Any requested hard copies of the documents are requested to be on site and available for the inspectors to review on the first date of inspection. As a part of the document request, please include a summary of contents page to describe the contents of each document/folder for ease of inspection. Proprietary information and security related information should be clearly marked.

Draft documentation should not be provided as part of this information request.

1.

Administrative procedures governing the following:

a.

The corrective action program b.

Identification and resolution of problems c.

Root cause, apparent cause and other types of causal evaluations d.

Common cause assessments, effectiveness reviews, and self-assessments e.

Applicability Determination 2.

The root cause evaluation report(s) and associated documents for the White finding 3.

All corrective actions implemented for the White finding:

a.

Documentation supporting completion of any corrective actions b.

Current schedule and resource commitments for open corrective actions 4.

The evaluation of the extent of condition and extent of cause for the White finding 5.

Ongoing, planned, or completed effectiveness reviews associated with the implemented corrective actions. Include schedule for ongoing and planned effective reviews 6.

Results of any effectiveness reviews, audits, self-assessments, mock inspections, etc.

Include any internal and/or external assessments (e.g., departmental assessments, corporate assessments, etc.) of the root cause evaluation and any follow-up assessments that occurred because of the root cause evaluation to assess readiness for the inspection 7.

If applicable, any evaluations of the effectiveness of previous corrective actions to prevent recurrence 8.

Drawings, Design Bases Documents, Procurement, Inspection, and Plant Procedures associated with the Emergency Diesel Generator Ventilation System 9.

Condition reports that (1) resulted from the root cause evaluation and/or (2) resulted from any assessments of the root cause evaluation

N. Flippin 2

2

10. Updated Final Safety Analyses Report (UFSAR), Technical Specifications (TS), and TS Bases
11. Corrective Action Documents associated with Catawba Licensee Event Report 2024-001-00