ML25057A068

From kanterella
Jump to navigation Jump to search
Ile Proposed Exam Submittal Letter
ML25057A068
Person / Time
Site: Byron  Constellation icon.png
Issue date: 11/27/2024
From:
NRC/RGN-III/DORS/OB
To:
Exelon Generation Co
B. Bergeon
Shared Package
ML23202A124 List:
References
Download: ML25057A068 (1)


Text

,J

!Im a* Constellation, November 27, 2024 L TR:

BYRON 2024-0061 File:

1 D.101 John Giessner Regional Administrator - Region Ill U. S. Nuclear Regulatory Commission 2056 Westings Avenue, Suite 400 Naperville, IL 60563-2657 Byron Station, Units 1 and 2 Constellation Energy Generation, LLC (CEG)

Byron Station 4450 N. German Church Road Byron, IL 61010-9794 www.constellationenergy.com Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455

Subject:

Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials Byron Generating Station is submitting in support of the initial license exam scheduled for February 10 - 21, 2025, at Byron Generating Station.

This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations and Job Performance Measures and Integrated Plant Operation Scenario Guides.

These examination materials have been developed in accordance with NUREG-1021, Revision 12, "Operator Licensing Examination Standards for Power Reactors." Please note that reference materials are attached to each individual examination question or item.

Some minor modifications have been made to the Integrated Examination Outline with regards to the operational scenarios in order to improve balance and content. These changes improve examination quality and are in compliance with NUREG-1021, Revision 12, "Operator Licensing Examination Standards for Power Reactors."

Some modifications or adjustments to the examination material may be required due to procedural changes.

In accordance with NUREG-1021, Revision 12, Section ES-1.3, Examination Security, please ensure these materials are withheld from public disclosure until after the examinations are complete.

L TR: BYRON 2024-0061 November 27, 2024 Page 2 Should you have any questions concerning this letter, please contact Ms. Zoe Cox, Regulatory Assurance Manager, at (779) 231-6606. For questions concerning examination materials, please contact Mr. Barry Mingus at (815) 406-3103.

Respectfully, Harris Welt Site Vice President Byron Generating Station HW/BM/JA/hh Enclosures cc:

Bryan Bergeon, Chief Examiner, NRC Region Ill, with delivered enclosures Paul Zurawski, Chief Operations Branch NRC, without enclosures Ashley Demeter, NRC Senior Resident Inspector, Byron Station, without enclosures

Enclosures:

Control Room systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:

1. Written Exam Quality Checklist (Form 2.3-4)
2. Record of Rejected K/A's (Form 4.1-1)

Examination Security Agreements (Form 1.3-1)

RO/SRO Composite Examination with references attached