Baseline Inspection Report 05000275/2025420 and 05000323/2025420
ML25050A112
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/25/2025
From: Clark J
Security Performance Evaluation Branch
To: Gerfen P
Pacific Gas & Electric Co
References
IR 2025420
Download: ML25050A112 (1)


Text

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000275/2025420 AND 05000323/2025420

Dear Paula Gerfen:

On February 13, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2, and discussed the results of this inspection with Adam Peck, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket Nos. 05000275 and 05000323 License Nos. DPR-80 and DPR-82

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000275 and 05000323

License Numbers:

DPR-80 and DPR-82

Report Numbers:

05000275/2025420 and 05000323/2025420

Enterprise Identifier:

I-2025-420-0003

Licensee:

Pacific Gas & Electric Company

Facility:

Diablo Canyon Power Plant, Units 1 and 2

Location:

Avila Beach, California

Inspection Dates:

January 13, 2025, to February 14, 2025

Inspectors:

J. Berry, Team Leader, NSIR

P. Coughlin, Senior Physical Security Inspector, NSIR

D. Hostetter, Senior Physical Security Inspector, NSIR

T. Weir, Physical Security Inspector, RIV

A. Woyansky, Senior Physical Security Inspector, NSIR

Approved By:

Jefferson K. Clark, Chief

Security Performance Evaluation Branch

Division of Security Operations

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Diablo Canyon Power Plant, Units and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. Two NRC-evaluated FOF exercises were conducted for the evaluation.

REPORT ATTACHMENTS

Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS126199.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 13, 2025, the inspectors presented the security baseline inspection results to Adam Peck, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Condition Report

CR-51145052

March 2,

22

Condition Report

CR-51145053

March 2,

22

Condition Report

CR-51145045

March 2,

22

Corrective Action

Documents

Condition Report

CR-51145044

March 2,

22

Condition Report

CR-51268388

January 14,

25

Condition Report

CR-51268514

January 14,

25

Condition Report

CR-51268515

January 14,

25

Condition Report

CR-51268614

January 15,

25

Corrective Action

CR-51271876

February 13,

25

Corrective Actions

CR-51271910

February 12,

25

Corrective Actions

CR-51271911

February 12,

25

Corrective Actions

CR-51271875

February 12,

25

Corrective Action

Documents

Resulting from

Inspection

Corrective Actions

CR-51271866

February 13,

25

Diablo Canyon

Nuclear Security

Protective Strategy

September

9, 2022

OM11.DC7

Compensatory Card A3 Awareness

January 13,

25

OM11.DC7

Compensatory Card CAS EWS COMP

May 3, 2024

71130.03

Miscellaneous

OM11.DC7

Compensatory Card ISFSI Camera

May 20,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

24

OM11.DC7

Compensatory Card D14 EWS Comp

September

26, 2022

OM11.DC7

Compensatory Card TWR 5 Expanding

May 20,

24

OM11.DC7

Compensatory Card D13 Expanding

May 20,

24

Timeline

Adversary Timeline Map

November

24

Timeline

Officer/Adversary Timelines

November

11, 2024

XPI-TRN

LLEA MOU Review

November

13, 2024

4Q27QualPrac

Rifle/Pistol

Revision 0

CT25GasPistol

Gas Mask Pistol

Revision 0

CT27 Aimpoint

Aimpoint H-1 Sight System

Revision 1

CT27REVTH

Vehicle Engagement

Revision 2

CT2DayCombt

Rifle/Pistol Range Drills

Revision 1

IT27MANIP

Rifle Manipulations

Revision 2

IT27Marksman

Marksmanship Fundamentals

Revision 0

OIT25GUNRNGE

Handgun

Revision 7

OJT/TPE J28B

Use of Protective Equipment

Revision 0

OMD11.ID1

Site Access Process

Revision 56

Physical Security

Plan

Diablo Canyon Nuclear Power Plant Physical Security Plan,

Training and Qualification Plan, Safeguards Contingency

Plan, and Independent Spent Fuel Storage Installation

Revision 19

SP301

Central and Secondary Alarm Station General Operating

Procedure

Revision 25

SP302

Operation of Security Communications Equipment

Revision 10

SP305A

Owner Controlled Area Camera Operation and Testing

Revision 19

SP308A

Performance Testing of Site Microwave Intrusion Alarm

System

Revision 45

Procedures

SP322

Operability and Performance Testing of Perifield Systems

Revision 19

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SP325

Operability and Performance Testing of Sick Laser System

Revision 2

ML25050A112

OFFICE

NSIR/DPCP/RSB

R-IV/DRS/PSB1

NSIR/DSO/SPEB

/ETB

NSIR/DSO/SPEB

/ETA

NAME

DHostetter

AWeir

JBerry

JClark

DATE

Feb 19, 2025

Feb 19, 2025

Feb 25, 2025

Feb 25, 2025