Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection
ML25036A218
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/07/2025
From: Robert Williams
NRC/RGN-II/DORS
To: Snider S
Duke Energy Carolinas
References
Download: ML25036A218 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 Steven Snider Site Vice President Duke Energy Carolinas, LLC Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672-0752

SUBJECT:

OCONEE NUCLEAR STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Steven Snider:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Oconee Nuclear Station during the weeks of April 14, and April 28, 2025. The inspection team will be led by Evan Robinson, Resident Inspector, from the NRCs Region II office. This inspection will be conducted in accordance with the baseline inspection procedure 71152, Problem Identification and Resolution, effective January 1, 2024.

The biennial PI&R inspection and assessment of the licensees corrective action program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.

On February 5, 2025, Evan Robinson confirmed with Laura Boyce of your staff, the two-week onsite inspection.

The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than March 17, 2025, unless otherwise stated. Contact Evan Robinson with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Evan Robinson will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.

February 7, 2025

S. Snider 2

In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Evan Robinson at (240) 460-7727.

Sincerely, Robert E. Williams Jr., Chief Projects Branch 1 Division of Operating Reactor Safety (DORS)

Docket Nos. 05000269 and 05000270 and 05000287 License Nos. DPR-38 and DPR-47 and DPR-55

Enclosure:

Information Request for Oconee Nuclear Station Problem Identification and Resolution Inspection cc Distribution via Listserv PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

Signed by Williams, Robert on 02/07/25

ML25036A218 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DORS RII/DORS NAME E. Robinson R. Williams DATE 2/6/25 2/7/25

2 INFORMATION REQUEST FOR OCONEE NUCLEAR STATION PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (April 14 - 18 and April 28 - May 2, 2025)

Note: Unless otherwise noted, the information requested below corresponds to documents generated since March 1, 2023. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

1.

Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program (CAP). This should include procedures related to:

a) Corrective action process b) Cause evaluation c)

Operability determination process d) Operating experience program e) 10 CFR Part 21 and programs for reporting defects and non-compliance f)

Employee concerns program g) Self-assessment program h) Maintenance rule program and implementing procedures i)

System health process or equivalent equipment reliability improvement programs j)

Work management (i.e., work orders (WOs) and work requests (WRs))

k)

Quality assurance program If any of the procedures requested above were revised after March 2023, please provide (or have available) copies of all subsequent revisions during the onsite inspection 2.

List of top ten risk significant systems, top ten risk significant components for each one of the top ten risk significant systems, and top ten risk significant operator manual actions.

Please provide by February 17, 2025.

3.

List of all nuclear condition reports (NCRs) initiated including the following information for each NCR:

a) NCR number b) Subject line c) Problem description d) Affected system e) Affected component f)

Responsible organization g) CAP characterization h) Status Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system and organization.

NCR #

Subject Description System Component Org CAP/

Not CAP Status 02351551 A RHR Pump failed flow criteria per SR 5.0.5.4 Should include initial description section from NCR entry RHR 2-RHR-PMP-A ENG CAP APPR OVED

3 4.

List of outstanding corrective actions including the following information for each action:

a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc.)

c)

Brief, but complete corrective action description d) Associated NCR/action request (AR) number e) Corrective action initiation date f)

Number of extensions g) Corrective action due date h) Completion status Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system and organization.

Corrective Action #

Type Subject AR Initiation Date Extensions Due Date Status 02351551-01 CAPR Revise Procedure NGK- 003-4585 AR0058 01/05/22 2

06/15/23 Awaiting review 5.

List of control room deficiencies with a brief description and corresponding CR/AR and/or WO/WR number.

6.

List of operator workarounds and operator burdens with a brief description and corresponding AR/NCR number and/or WO/WR number.

7.

List of all prompt operability determinations or other engineering evaluations to provide reasonable assurance of operability; if fewer than approximately 20, provide full NCR package.

8.

List of all NCRs that have been voided, cancelled, or deleted. Please provide the following information for each NCR:

a) NCR number b) Subject line c) Affected system d) Responsible organization e) CAP characterization f)

Reason voided, cancelled, or deleted 9.

List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the maintenance rule since March 2023. Please include the following information for each system in (a)(1):

a) Date of classification in (a)(1) b) Reason for being placed in (a)(1) c) Planned actions and their status d) Copy of evaluations for each

10. List of Maintenance Preventable Functional Failures of risk significant systems with actions completed and current status.

4

11. List of corrective maintenance WOs and WRs and any WOs and WRs considered high risk. Please include the following information for each:

a) WR/WO number b) Brief, but complete work description c) Affected system and component(s) d) Date of initiation and due date e) CAQ designation f)

Priority g) Status h) Associated NCR (if applicable)

Provide this list in a format compatible with spreadsheet software (example shown below) and ensure the list is searchable and can be filtered by system.

WR/WO #

Description System Component Initiation Date Due Date CAQ Priority Status WO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump.

SI 2A-SI-PMP, BKR-08-BB4 01/05/11 03/15/22 Yes 3

Closed

12. Corrective action closeout packages, including CRs with description of corrective actions, for all NRC findings and Licensee identified violations (LIVs). Please include a cross reference relating NRC finding and LIVs to appropriate CR numbers.
13. Corrective action closeout packages, including CRs with description of corrective actions, for all licensee event reports (LERs) submitted. Please include a cross reference relating LER number to appropriate CR number.
14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OpE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., AR/NCR/WO/WR number) for the documents that evaluated the aforementioned OpE information.
15. Copies of all quality assurance/Nuclear Oversight audits and/or assessments issued, including the last two audits/assessments of the CAP.
16. Copies of all department self-assessments. Include cross-reference list.
17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends.
18. If performed, provide all self-assessments of the site safety culture completed.
19. Copies of CAP documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods.

5

20. Contact information and availability during inspection period for Employee Concerns
21. Copy of the latest CAP statistics (if exists) such as the number of CRs initiated by department, human performance errors by department, and others as may be available
22. List of routine meetings agendas involving the CAP (including but not limited to CAP screening, maintenance rule, operating experience, new work screening team, operations focus, management review, challenge, etc.,) to be held during the inspection period.
23. Five-year Review: NCRs related to equipment aging issues in the top ten risk significant systems since March 2020 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;

environmental qualification). Please provide the following information for each NCR, in a format compatible with spreadsheet software and ensure the list is sortable and searchable:

a) NCR number b) Subject line c) Problem description d) Affected system e) Affected component f)

Responsible organization g) CAP characterization h) Status

24. List of all root cause, apparent cause, common cause and related or similar cause evaluations with a brief description. Provide complete corrective action packages (NCR and all attachments) for all root cause evaluations.
25. System health reports, system design basis documents, maintenance rule functions and status, and system description information upon notification of system selections.