Letter Sequence Other |
|---|
|
|
MONTHYEARML24093A2202024-04-0404 April 2024 University of Illinois at Urbana-Champaign, NRC Form 898 for Acceptance of Fuel Qualification Methodology Topical Report Project stage: Acceptance Review ML24093A2212024-04-0404 April 2024 University of Illinois at Urbana-Champaign, Email Transmitting NRC Form 898 for Acceptance of Fuel Qualification Methodology Topical Report Project stage: Acceptance Review ML24107A9102024-04-16016 April 2024 University of Illinois at Urbana Champaign, Email Transmitting Form 897 Proprietary Determination for Fuel Qualification Topical Report Project stage: Other ML24107A9092024-04-16016 April 2024 University of Illinois at Urbana Champaign, Form 897 Proprietary Determination for Fuel Qualification Topical Report Project stage: Other ML24166A2232024-06-14014 June 2024 NRR E-mail Capture - Regulatory Audit Plan for the University of Illinois Urbana-Champaign High-Temperature Gas-Cooled Research Reactor Fuel Qualification Methodology Topical Report Project stage: Other ML24220A0622024-08-0707 August 2024 NRR E-mail Capture - Regulatory Audit Questions for the University of Illinois Urbana-Champaign High-Temperature Gas-Cooled Research Reactor Fuel Qualification Methodology Topical Report Project stage: Other ML25031A2402025-02-0303 February 2025 University of Illinois at Urbana-Champaign, Email Transmitting NRC Form 897 for Withholding Determination for Release 2 of the Fuel Qualification Topical Report Project stage: Other ML25031A2392025-02-0303 February 2025 University of Illinois at Urbana-Champaign, NRC Form 897 for Withholding Determination for Release 2 of the Fuel Qualification Topical Report Project stage: Other ML25076A6062025-03-17017 March 2025 NRR E-mail Capture - Transmittal of NRC Staff Draft Safety Evaluation Regarding Uiuc Fuel Qualification Methodology Topical Report, Release 2 Project stage: Draft Approval ML25086A1912025-03-27027 March 2025 University of Illinois at Urbana-Champaign, Response to Request for Proprietary Review of Draft Safety Evaluation for Fuel Qualification Methodology Topical Report Project stage: Draft Request ML25077A1652025-04-0101 April 2025 University of Illinois at Urbana-Champaign, Final Safety Evaluation of Fuel Qualification Methodology Topical Report Project stage: Request ML25077A1662025-04-0101 April 2025 University of Illinois at Urbana-Champaign, Transmittal of Final Safety Evaluation of Fuel Qualification Methodology Topical Report Project stage: Approval ML25077A1682025-04-0101 April 2025 University of Illinois at Urbana-Champaign, Final Safety Evaluation of Fuel Qualification Methodology Topical Report (Redacted) Project stage: Approval ML25101A1912025-04-11011 April 2025 Written Communication as Specified by 10 CFR 50.4 Regarding the University of Illinois at Urbana-Champaign - Safety Evaluation for Topical Report Related to Fuel Qualification Methodology (EPID L-2024-NFN-0003), Dated April 1, 2025 Project stage: Other ML25111A1692025-04-23023 April 2025 University of Illinois at Urbana-Champaign, Form 896 for -A Verification for Fuel Qualification Methodology Topical Report Project stage: Other ML25111A1682025-04-23023 April 2025 University of Illinois at Urbana-Champaign, Email Transmitting Form 896 for -A Verification for Fuel Qualification Methodology Topical Report Project stage: Other 2025-02-03
[Table View] |
Text
From:
Edward Helvenston To:
Brooks, Caleb Cc:
Grunloh, Timothy P; lfoyto@illinois.edu; Holly Cruz; Greg Oberson; Dan Beacon; Patrick Boyle
Subject:
NRC Form 897 for Withholding Determination for UIUC Fuel Qualification Methodology Topical Report Release 2 Date:
Monday, February 3, 2025 10:35:00 AM Attachments:
NRC 897 - Withholding Determination for UIUC FQM TR Release 2.pdf
Dear Dr. Brooks,
Attached please find the completed NRC Form 897 for the U.S. Nuclear Regulatory Commission staff proprietary determination review of the University of Illinois at Urbana-Champaign topical report titled, University of Illinois Urbana-Champaign High Temperature Gas-cooled Research Reactor: Fuel Qualification Methodology, Release 2, submitted by letter dated December 12, 2024 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24347A211). Should you have any questions, please feel free to contact me at Edward.Helvenston@nrc.gov or 301-415-4067.
Thank you,
Ed Helvenston, U.S. NRC Non-Power Production and Utilization Facility Licensing Branch (UNPL)
Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU)
Office of Nuclear Reactor Regulation (NRR)
(301) 415-4067
Project No. 99902094