Form 2.1-1 Examination Preparation Checklist Facility: Limerick Date of Examination: November 12, 2024 Developed by: Written:
Facility NRC
//
Operating:
Facility NRC Target Date*
Task Description Chief Examiners Initials
-240
- 1. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
3/17/2024
-210
- 2. NRC examiners and facility licensee contact assigned (B.1 and C.1-3).
4/16/2024
-210
- 3. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
4/16/2024
-210
- 4. Reference material due for NRC-prepared examinations (F).
4/16/2024
-210
- 5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
4/16/2024
-195
- 6. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1 A.2.a).
5/1/2024
-150
- 7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
6/15/2024
-136
- 8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
6/29/2024
-100
- 9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
8/4/2024
-75
- 10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
8/29/2024
-60
- 11. Preliminary waiver/excusal requests due (ES-2.2 E.1).
9/13/2024
-50
- 12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
9/23/2024
-50
- 13. Examination review results discussed between the NRC and the facility licensee (B.14).
9/23/2024
-35
- 14. Examination preparatory week conducted by the NRC and the facility licensee (I).
10/8/2024
-30
- 15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1).
10/13/2024
-14
- 16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
10/29/2024
-7
- 17. Written examinations and operating tests approved by the NRC supervisor (C.9) 11/5/2024
-7
- 18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
11/5/2024
-7
- 19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
11/5/2024
-7
- 20. Written examination administration guidelines reviewed with the facility licensee (D.14).
11/5/2024
-7
- 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
11/5/2024
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
11/5/2024 11/5/2024 Donald Jackson /
11/5/2024 CML CML CML Christopher M Lally
11/5/2024 11/5/2024 11/5/2024 Christopher M Lally
11/5/2024 11/5/2024 11/5/2024 Christopher M Lally
Form 3.4-1 Events and Evolutions Checklist Facility: Limerick Date of Exam: 11/11/24 Operating Test No.: 1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M*
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P RO I
U SRO-I 1
RX 2
1 1
1 0
NOR 1
1 1
1 1
I/C 2,3,4,5
,8 3,5,7 1,2,3,4,5, 6,8,9 16 4
4 2
MAJ 6
6 7
3 2
2 1
Man.Ctrl 3
1 1
1 0
TS 2,4 3,5 4
0 2
2 SRO-I 2
RX 2
1 1
1 0
NOR 1
1 1
1 1
I/C 2,3,4,5
,8 3,5,7 8
4 4
2 MAJ 6
6 2
2 2
1 Man.Ctrl 3
1 1
1 0
TS 2,4 2
0 2
2 SRO-I 3
RX 5
1 1
1 0
NOR 1
1 1
1 1
I/C 2,3,4,5
,8 2,6 7
4 4
2 MAJ 6
7 2
2 2
1 Man.Ctrl 6
1 1
1 0
TS 2,4 2
0 2
2 SRO-I 4
RX 5
1 1
1 0
NOR 1
1 1
1 1
I/C 2,3,4,5
,7 2,6 7
4 4
2 MAJ 6
7 2
2 2
1 Man.Ctrl 6
1 1
1 0
TS 3,4 2
0 2
2 SRO-I 5/6 RX 0
1 1
0 NOR 1
1 2
1 1
1 I/C 2,3,4,5
,9 2,3,4,5
,7 10 4
4 2
MAJ 6
6 2
2 2
1 Man.Ctrl 3
1 1
1 0
TS 3,4 2
0 2
2
Form 3.4-1 Events and Evolutions Checklist Facility: Limerick Date of Exam: 11/11/24 Operating Test No.: 1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M*
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P RO I
U SRO-I 7
RX 0
1 1
0 NOR 1
1 1
1 1
I/C 2,3,4,5
,9 1,2,3,4,5, 6,8,9 13 4
4 2
MAJ 6
7 2
2 2
1 Man.Ctrl 3
1 1
1 0
TS 3,5 2
0 2
2 SRO-I 8
RX 0
1 1
0 NOR 1
1 1
1 1
I/C 2,4,8 1,2,3,4,5, 6,8,9 11 4
4 2
MAJ 6
7 2
2 2
1 Man.Ctrl 2
1 1
1 0
TS 3,5 2
0 2
2 SRO-I 9
RX 0
1 1
0 NOR 1
1 1
1 1
I/C 1,3,4,8
,9 3,4,5,7 9
4 4
2 MAJ 7
6 2
2 2
1 Man.Ctrl 1,4 2
1 1
0 TS 4,5 2
0 2
2
Form 3.4-1 Events and Evolutions Checklist Facility: Limerick Date of Exam: 11/11/24 Operating Test No.: 1 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M*
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P RO I
U RO 1/2 RX 2
1 1
1 0
NOR 1
1 1
1 1
I/C 4,5,7 2,4,8 6
4 4
2 MAJ 6
6 2
2 2
1 Man.Ctrl 7
2 2
1 1
0 TS 0
0 2
2 RO 3
RX 2
2 2
1 1
0 NOR 0
1 1
1 I/C 4,5,7 1,3,4,8
,9 3,5 10 4
4 2
MAJ 6
7 6
3 2
2 1
Man.Ctrl 7
1,4 3
4 1
1 0
TS 0
0 2
2 RO 4
RX 2
1 1
1 0
NOR 0
1 1
1 I/C 3,5,7 1,3,4,8
,9 8
4 4
2 MAJ 6
7 2
2 2
1 Man.Ctrl 3
1,4 3
1 1
0 TS 0
0 2
2 RO 5
RX 5
1 1
1 0
NOR 1
1 1
1 1
I/C 2,6 4,5,7 5
4 4
2 MAJ 7
6 2
2 2
1 Man.Ctrl 6
4 2
1 1
0 TS 0
0 2
2
Form 3.4-1 Events and Evolutions Checklist Form 3.4-1 Instructions for the Events and Evolutions Checklist
- 1.
Mark the applicant license level for each simulator operating test number.
- 2.
For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
- Minimums are subject to the instructions in Section C.2, License Level Criteria.
KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ
Major Transient; Man. Ctrl = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U
Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP =
Balance of Plan