From:
Mahesh Chawla Sent:
Thursday, December 12, 2024 4:26 PM To:
Garcia, Richard M.
Cc:
Ali Rezai; Matthew Mitchell; Tony Nakanishi; Christopher Highley; Patricia Vossmar; Russ Bywater
Subject:
Columbia Generating Station - Acceptance of Requested Licensing Action -
Relief Request for Alternative 5ISI-03 for Fifth Interval (EPID No. L-2024-LLR-0075)
Dear Mr. Garcia:
By letter dated November 18, 2024 (Agencywide Documents Access and Management System Accession No. ML24323A191), Energy Northwest submitted a relief request for Columbia Generating Station. The proposed relief request would provide alternative test method for Standby Liquid Control System piping in accordance with 10 CFR 50.55a(z)(2), hardship or unusual difficulty without compensating increasing in level of quality and safety. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Pursuant to Section 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 85 hours9.837963e-4 days <br />0.0236 hours <br />1.405423e-4 weeks <br />3.23425e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 11 months, which is November 21, 2025. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please me, at (301) 415-8371.
Sincerely, Mahesh(Mac) Chawla, Project Manager Licensing Branch LPL4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301) 415-8371 Email: Mahesh.Chawla@nrc.gov Mac
Hearing Identifier:
NRR_DRMA Email Number:
2668 Mail Envelope Properties (PH0PR09MB1041524CE815F681BB77A7811F13F2)
Subject:
Columbia Generating Station - Acceptance of Requested Licensing Action -
Relief Request for Alternative 5ISI-03 for Fifth Interval (EPID No. L-2024-LLR-0075)
Sent Date:
12/12/2024 4:25:44 PM Received Date:
12/12/2024 4:25:00 PM From:
Mahesh Chawla Created By:
Mahesh.Chawla@nrc.gov Recipients:
"Ali Rezai" <Ali.Rezai@nrc.gov>
Tracking Status: None "Matthew Mitchell" <Matthew.Mitchell@nrc.gov>
Tracking Status: None "Tony Nakanishi" <Tony.Nakanishi@nrc.gov>
Tracking Status: None "Christopher Highley" <Christopher.Highley@nrc.gov>
Tracking Status: None "Patricia Vossmar" <patricia.vossmar@nrc.gov>
Tracking Status: None "Russ Bywater" <Russell.Bywater@nrc.gov>
Tracking Status: None "Garcia, Richard M." <rmgarcia@energy-northwest.com>
Tracking Status: None Post Office:
PH0PR09MB10415.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3397 12/12/2024 4:25:00 PM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: