December 05, 2024 Jaime McCoy, Site Vice President Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT:

WOLF CREEK GENERATING STATION - SECURITY BASELINE INSPECTION REPORT 05000482/2024402

Dear Jaime McCoy:

On November 21, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jesse M. Rollins, Chief Physical Security Branch Division of Radiological Safety & Security Docket No. 05000482 License No. NPF-42

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV Signed by Rollins, Jesse on 12/05/24

ML24338A271 SUNSI Review By: CAJ Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE SPSI:DRSS:PSB C:DRSS:PSB NAME CJewett JRollins SIGNATURE

/RA/

/RA/

DATE 12/05/24 12/05/24

Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Number:

05000482 License Number:

NPF-42 Report Number:

05000482/2024402 Enterprise Identifier:

I-2024-402-0012 Licensee:

Wolf Creek Nuclear Operating Corporation Facility:

Wolf Creek Generating Station Location:

Burlington, KS Inspection Dates:

November 18, 2024, to November 21, 2024 Inspectors:

C. Jewett, Sr Physical Security Inspector Approved By:

Jesse M. Rollins, Chief Physical Security Branch Division of Radiological Safety & Security

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

3 INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS 71130.02 - Access Control The inspector evaluated the access control program through completion of the following inspection elements:

Access Control (1 Sample)

(1)

Tier I: All Requirements Tier II: All Requirements Tier III: All Requirements 71130.09 - Security Plan Changes The inspector evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee did not complete all actions associated with a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP at the time of this inspection.

OTHER ACTIVITIES - BASELINE 71151 - Performance Indicator Verification The inspector verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1)

January 01, 2023, through November 21, 2024

4 INSPECTION RESULTS No findings were identified.

EXIT MEETINGS AND DEBRIEFS The inspector verified no proprietary information was retained or documented in this report.

On November 21, 2024, the inspector presented the security baseline inspection results to Jaime McCoy and other members of the licensee staff.

5 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date Corrective Action Documents 10022769; 10025375; 10028442; 10029344; 10029461; 10030321; 10031475; 10031585; 10033836; 10034565 Corrective Action Documents Resulting from Inspection 10038041; 10038043; 10038044; 10038091; 10038092; 10038103 Miscellaneous Physical Security Plan 18 AI 27-006 Safety/Security Interface 04 AP 27-004 Controlling Safeguards Information 28 SEC 01-202A Personnel Access to the Protected Area 10 SEC 01-204A Badge Preparation and Maintenance 06 SEC 01-206A Lock and Key Control 03 SEC 01-207 Vehicle Access Control 64 SEC 01-208A Security System Performance Testing 17 Procedures SEC 50-020A Insider Threat 00 71130.02 Self-Assessments QH-2024-2708 NRC Security Baseline Inspection readiness Assessment Checklist IP 71130.02, Access Control 08/15/2024