ML24326A303
| ML24326A303 | |
| Person / Time | |
|---|---|
| Site: | OPTIMUS-L |
| Issue date: | 11/21/2024 |
| From: | Baldner H NAC International |
| To: | Kristina Banovac Storage and Transportation Licensing Branch |
| References | |
| EPID L-2024-LLA-0121 | |
| Download: ML24326A303 (1) | |
Text
From:
Heath Baldner To:
Kristina Banovac Cc:
Subject:
[External_Sender] RE: QUERY re: editorial discrepancies in OPTIMUS-L SAR Revision 2 Date:
Thursday, November 21, 2024 2:30:52 PM Attachments:
image001.png
- Kris,
I agree to correct the discrepancies identified below in a supplement to the ongoing OPTIMUS-L Casework.
Heath Baldner Director, Licensing NAC International Inc.
2 Sun Court, Suite 220, Peachtree Corners, GA 30092 678.328.1252 hbaldner@nacintl.com
From: Kristina Banovac <Kristina.Banovac@nrc.gov>
Sent: Thursday, November 21, 2024 2:18 PM To: Heath Baldner <hbaldner@nacintl.com>
Cc: Pierre Saverot <Pierre.Saverot@nrc.gov>
Subject:
QUERY re: editorial discrepancies in OPTIMUS-L SAR Revision 2
[External]
Hi Heath,
As discussed this morning, in our review of the 9/10/2024 SAR Revision 2 for the OPTIMUS-L CoC No. 9390, we identified the following editorial discrepancies:
Page 1.3-1, Reference 1.3 is changed from Regulatory Guide 7.6 (Design Criteria for the Structural Analysis of Shipping Cask Containment Vessels) Revision 1 to Revision 2.
Page 2.12-1, Reference 2.5 is changed from Regulatory Guide 7.8 (Load Combinations for the Structural Analysis of Shipping Casks for Radioactive Material)
Revision 1 to Revision 2.
Page 2.12-2, Reference 2.13 is changed from Regulatory Guide 7.6 Revision 1 to Revision 2.
Page 2.12-3, Reference 2.30 is changed from Regulatory Guide 1.61 (Damping Values for Seismic Design of Nuclear Power Plants) Revision 1 to Revision 2.
Page 6.3-11, the reference to keff1 in the middle of page, is changed to kef1.
Could you please advise if NAC will correct the above editorial discrepancies before the issuance of CoC No. 9390 Revision No. 5? If so, we can proceed with the approval of SAR Revision 2, and the NRC staff will verify the editorial discrepancies are corrected in the SAR changes supporting the request for CoC No. 9390 Revision No. 5.
Thank you, Kris
Kristina Banovac, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission 301-415-7116