ML24325A610

From kanterella
Jump to navigation Jump to search
Westinghouse - Columbia Fuel Fabrication Facility Leu+ Manufacturing Building Design
ML24325A610
Person / Time
Site: Westinghouse
Issue date: 11/20/2024
From:
Westinghouse
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML24325A608 List:
References
LTR-RAC-24-57
Download: ML24325A610 (1)


Text

Westinghouse Non-Proprietary Class 3 l © 2024 Westinghouse Electric Company LLC. All Rights Reserved.

Columbia Fuel Fabrication Facility LEU+ Manufacturing Building Design November 2024

Westinghouse Non-Proprietary Class 3 l © 2024 Westinghouse Electric Company LLC. All Rights Reserved.

Project Objectives To support US pressurized water reactor transitions to 24 month refueling cycles, Westinghouse is pursuing an increase in allowable U235 enrichment (>5 wt%) at the Columbia Fuel Fabrication Facility (CFFF) site located in Hopkins, SC.

Westinghouse will construct a new building adjacent to the existing facility to produce fuel assemblies greater than the existing license requirements of 5 wt%.

The new building will operate at up to 8 wt%. No changes to the existing fuel factory.

The expansion and processes for 8 wt% will require prior NRC approval of the License Amendment Request to the CFFF Special Nuclear Material License (SNM-1107) per 10 CFR 70.72.

Westinghouse Non-Proprietary Class 3 l © 2024 Westinghouse Electric Company LLC. All Rights Reserved.

Overview of LEU+ Manufacturing Conversion

  • Dry conversion process 8% enriched UF6
  • Ammonia free process
  • Lower emissions with use of dry process
  • Automated conversion lines and enclosed processes Pelleting
  • Advanced Doped Pellet Technology (ADOPT) blending
  • Automated pelleting lines and enclosed processes Burnable Absorbers/

Rods

  • Integrated Fuel Burnable Absorber (IFBA) dry room
  • Automatic rod loading and welding Uranium Recovery
  • Ammonia free process
  • Reduces Nitrate discharge
  • New processes do not require retention ponds
  • 30B cylinder wash and recertification
  • Eliminate fuel assembly washing
  • Single control access point
  • Ship to customers in Traveller package

Westinghouse Non-Proprietary Class 3 l © 2024 Westinghouse Electric Company LLC. All Rights Reserved.

LEU+ Building Design

  • Baseline Design Criteria 70.64(a)(2)
  • New process at existing facility that requires a license amendment
  • Designed for adequate protection against most severely documented historical events
  • Seismic
  • Winds/Tornados/Hurricanes
  • Flood
  • Heavy Precipitation
  • Application of various building codes or analysis

Westinghouse Non-Proprietary Class 3 l © 2024 Westinghouse Electric Company LLC. All Rights Reserved.

Questions?

End of the open portion