ML24281A078
ML24281A078 | |
Person / Time | |
---|---|
Site: | 07109315 |
Issue date: | 10/11/2024 |
From: | Pierre Saverot Storage and Transportation Licensing Branch |
To: | Shenk J US Dept of Energy, Office of Packaging and Transportation |
Shared Package | |
ML24281A077 | List: |
References | |
EPID L-2022-LLA-0116 | |
Download: ML24281A078 (1) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Julia C. Shenk, Director Office of Packaging and Transportation U.S. Department of Energy EM-4.24/Germantown Building 1000 Independence Ave, S.W.
Washington, DC 20585
SUBJECT:
APPLICATION FOR REVISION OF CERTIFICATE OF COMPLIANCE NO. 9315 FOR THE MODEL NO. ES-3100 PACKAGE - REQUEST FOR ADDITIONAL INFORMATION
Dear Julia Shenk:
By letter dated February 5, 2024 (Agencywide Documents Access and Management System Package Accession No. ML24060A090), as supplemented on April 17, 2024 (ML24164A259),
the U.S. Department of Energy (DOE) submitted an application for revision of certificate of compliance No. 9315 to the Model No. ES-3100 package. In particular, DOE proposed the addition of (i) tri-structural isotropic fuel as authorized contents, and (ii) Packcrete thermal insulating and impact limiting material to the design of the package.
In connection with our review, we need the information identified in the enclosure to this letter.
At this time, I am transmitting the requests for additional information (RAIs) completed up to this point to allow you to start working on your responses. I will let you know by December 20, 2024, if we have RAIs from the materials evaluation, the only outstanding technical review area not yet completed.
To assist us in scheduling our review of your responses, we request that you provide you responses either within 2 months from the date of this letter or from the date of the letter providing the materials RAIs, if any. The staff is available to clarify these RAIs, and, if necessary, to meet and discuss your proposed responses.
October 11, 2024
J. Shenk Please reference Docket No. 71-9315 and Enterprise Project Identifier No. L-2022-LLA-0116 in future correspondence related to this request. If you have any questions, please contact me via email at pierre.saverot@nrc.gov.
Sincerely, Pierre Saverot, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 71-9315 EPID No. L-2022-LLA-0116
Enclosure:
Request for Additional Information Signed by Saverot, Pierre on 10/11/24
ML24281A077(pkg); ML24281A078(ltr);
ML24281A079(encl)
OFFICE NMSS/DFM NMSS/DFM NMSS/DFM NMSS/DFM NAME PSaverot JBorowsky BPatel JDrabble DATE 10/8/2024 10/8/2024 10/9/2024 10/9/2024 OFFICE NMSS/DFM NMSS/DFM NMSS/DFM NMSS/DFM NAME TBoyce ASotomayor-Rivera SFigueroa YDiaz-Sanabria DATE 10/9/2024 10/9/2024 10/9/2024 10/11/2024 OFFICE NMSS/DFM NAME PSaverot DATE 10/11/2024