From:
Zozula, Camille T.
Cc:
Harper, Zachary S; Ewing, Jerrod; Mackereth, Nathaniel J; Gerond George; Scott Krepel
Subject:
U.S. NRC Draft Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-18904-P/NP, Revision 0, "Critical Power Experiments and D6 CPR Correlation for TRITON11 Fuel" Date:
Friday, December 20, 2024 7:25:00 PM Camille Zozula Manager, Infrastructure & Facilities Licensing Westinghouse Electric Company 1000 Westinghouse Drive, Building 1, Suite 165 Cranberry Township PA 16066
Dear Camille Zozula,
By letter dated November 3, 2023, Westinghouse Electric Company (Westinghouse) submitted to the U.S. Nuclear Regulatory Commission (NRC) Westinghouse Topical Report (TR) WCAP18904-P, Revision 0, Critical Power Experiments and D6 CPR Correlation for TRITON11 Fuel (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML23307A183). Based on its review of the information submitted in the TR, the NRC staff finds the TR acceptable for referencing subject to the limitations specified in the TR, and in the NRC safety evaluation (SE).
A copy of the draft SE has been placed in the box.com folder.Nathaniel Mackereth, Westinghouse, has been given access to the folder. The draft SE is being provided for a proprietary information review.
Pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR), we have determined that the draft SE may contain proprietary information.If you believe that any information in the draft SE is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390.Use bold brackets and yellow highlight to identify any [proprietary information].
Your response must be via a letter from an authorized individual.The final SE will be issued after making any necessary changes.
Note that at this stage of the process, the NRC staff has completed its review of the submitted information and will not entertain technical arguments.The NRC staff conclusions and conditions will not change unless new information is provided on the docket that was not available during our review.If Westinghouse would like to discuss the draft SE in detail, we can do that in a noticed meeting.
The draft SE for TR WCAP18904-P, Revision 0, has been placed in ADAMS as nonpublic because it may contain proprietary information.This email will be placed into ADAMS, made an Official Agency Record, and declared public.
If you have any questions, please feel free to contact me at 301-415-3151 or by email at Ekaterina.Lenning@nrc.gov.
Ekaterina Lenning, Project Manager
Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission
Docket No.: 99902038
ML24278A173 (Package)
ML24278A178 (E-mail)
ML24278A174 (Enclosure Proprietary Draft SE)
OFFICE NRR/DORL/LLPB/
PM NRR/DORL/LLPB/
LA NRR/DSS/SFNB/
BC OGC-NLO NRR/DORL/LLPB/
BC NAME ELenning DHarrison SKrepel PLom GGeorge DATE 10/11/2024 10/24/2024 10/28/2024 12/11/2024 12/20/2024