Letter Sequence Other |
|---|
|
|
MONTHYEARML23179A2652023-08-16016 August 2023 NRC 897, Topical Report Withholding Determination, for EPRI Report 3002023774, EPRI MOV Performance Prediction Methodology (Ppm), Version 4.1 Project stage: Other ML23179A2662023-08-16016 August 2023 NRC 898, Topical Report Completeness Determination, for EPRI Report 3002023774, EPRI MOV Performance Prediction Methodology (Ppm), Version 4.1 Project stage: Other ML23179A2642023-08-23023 August 2023 E-mail - U. S. Nuclear Regulatory Commission Completeness Determination Form 898 and Withholding Determination Form 897 for EPRI Report 3002023774, EPRI MOV Performance Prediction Methodology (Ppm), Version 4.1 Project stage: Other ML23258A2172023-09-26026 September 2023 Electric Power Research Institute (EPRI) Regulatory Audit Plan in Support of the Review of Report 3002023774, EPRI MOV Performance Prediction Methodology (Ppm), Version 4.1 Project stage: Other ML23293A2642023-11-16016 November 2023 Report Regarding October 10 - 13, 2023, Regulatory Audit for Electric Power Research Institute Technical Report 3002023774, Motor-Operated Valve Performance Prediction Methodology, Version 4.1 Project stage: Other ML24053A4042024-03-19019 March 2024 E-Mail - Draft Safety Evaluation Associated with Electric Power Research Institute (EPRI) Report 3002023774, EPRI Motor-Operated Valve (MOV) Performance Prediction Methodology (Ppm), Version 4.1 Project stage: Draft Approval ML24080A1562024-03-20020 March 2024 Electric Power Research Institute (EPRI) Informed the NRC: No Technical/Proprietary Comments on Draft Safety Evaluation for Report 3002023774, EPRI Motor-Operated Valve (MOV) Performance Prediction Methodology (Ppm), Version 4.1 Project stage: Draft Other ML24080A1642024-04-11011 April 2024 E-Mail - Final Safety Evaluation Associated with Electric Power Research Institute (EPRI) Report 3002023774, EPRI Motor-Operated Valve (MOV) Performance Prediction Methodology (Ppm), Version 4.1 Project stage: Approval ML24080A1702024-04-11011 April 2024 Final Safety Evaluation Associated with Electric Power Research Institute (EPRI) Report 3002023774, EPRI Motor-Operated Valve (MOV) Performance Prediction Methodology (Ppm), Version 4.1 Project stage: Approval ML24268A1352024-11-18018 November 2024 NRC Form 897, Topical Report Withholding Determination for Addendum 11 to Changes to Performance Prediction Methodology Software, V4.1 Project stage: Other ML24268A1292024-12-0606 December 2024 E-mail - Transmittal of Completed NRC Forms 896, -A Topical Report Verification, and 897, Topical Report Withholding Determination, for Addendum 11 to Changes to Performance Prediction Methodology Software, V4.1 Project stage: Other ML24268A1332024-12-0606 December 2024 NRC Form 896, -A Topical Report Verification for Addendum 11 to Changes to Performance Prediction Methodology Software, V4.1 Project stage: Other 2024-11-18
[Table View] |
E-mail - Transmittal of Completed NRC Forms 896, -A Topical Report Verification, and 897, Topical Report Withholding Determination, for Addendum 11 to Changes to Performance Prediction Methodology Software, V4.1| ML24268A129 |
| Person / Time |
|---|
| Site: |
Electric Power Research Institute |
|---|
| Issue date: |
12/06/2024 |
|---|
| From: |
Lois James Licensing Processes Branch |
|---|
| To: |
Camilli N Electric Power Research Institute |
|---|
| References |
|---|
| TR 3002023774, TR 3002023774, Rev 2, TR 3002023774, Revision 2, L-2023-TOP-0038 prior to fee exemp, L-2023-NTR-0006 after fee exemp |
| Download: ML24268A129 (1) |
|
Text
1 Lois James From:
Lois James Sent:
Friday, December 6, 2024 8:57 AM To:
Camilli, Nicholas Cc:
RidsNrrOd Resource; RidsNrrDex Resource; RidsNrrLADHarrison Resource; RidsNrrDorl Resource; RidsNrrDorlLlpb Resource; RidsACRS_MailCTR Resource; Lois James; Gerond George; Thomas Scarbrough; Stewart Bailey; Nick Hansing; ncamilli@epri.com; FSetzer@epri.com; vvaughn@epri.com
Subject:
Transmittal of the Completed NRC Forms 896, A Topical Report Verification, and 897, Topical Report Withholding Determination, for Addendum 11 to TR-103237-R2-Changes to Performance Prediction Methodology Software, Version 4.1 (EPID L-2023-NTR-0006)
Attachments:
MOV Performance Prediction Program - NRC 897 - signed.pdf; MOV Performance Prediction Program - NRC 896 - signed.pdf Nicholas Camilli, Principal Project Manager Nuclear Maintenance Applications Center Program (NMAC)
Electric Power Research Institute (EPRI) 1300 West W.T. Harris Boulevard Charlotte, NC 28262-8550 Nicholas Camilli:
Attached please find the completed U.S. Nuclear Regulatory Commission (NRC) Form 896, -A Topical Report Verification, and NRC Form 897, Topical Report Withholding Determination, proprietary information withholding determination for the Electric Power Research Institutes (EPRIs) Addendum 11 to TR-103237-R2-Changes to Performance Prediction Methodology Software, Version 4.1.
This completes the staffs review of EPRIs) Addendum 11 to TR-103237-R2-Changes to Performance Prediction Methodology Software, Version 4.1.
If you have any questions, please feel free to contact me via email Lois.James@nrc.gov.
Sincerely, Lois M. James, Senior Project Manager Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Docket No. 99902021 ADAMS Accession Nos.: ML24267A200 (Pkg); ML24267A192 (email); ML24267A191 (Form 896);
ML24267A193 (Form 897) ^via eConcurrence *via e-mail NRR-004 OFFICE NRR/DORL/LLPB/PM NRR/DEX/EMIB/BC NRR/DEX/EMIB/BC NRR/DORL/LLPB/BC NAME LJames TScarbrough SBailey GGeorge DATE 11/18/2024 11/08/2024 12/06/2024 12/06/2024 OFFICE NRR/DORL/LLPB/PM NAME LJames
2 DATE 12/06/2024 OFFICIAL RECORD COPY