Framatome-Richland – Inspection Schedule for Calendar Year 2025
ML24179A117
Person / Time
Site: Framatome ANP Richland
Issue date: 06/27/2024
From: Eric Michel
NRC/RGN-II/DFFI/FFB2
To: Stephens L
Framatome
References
Download: ML24179A117 (2)


Text

Lance Stephens Site Manager Framatome Inc.

2101 Horn Rapids Road Richland, WA 99354

SUBJECT:

FRAMATOME-RICHLAND -

INSPECTION SCHEDULE FOR CALENDAR YEAR 2025

Dear Lance Stephens:

Enclosed is the schedule of inspections to be performed by the U.S. Nuclear Regulatory Commission (NRC) inspectors at the Framatome-Richland facility in calendar year 2025. The inspection schedule is provided in advance to minimize the resource impact on your staff and allow for the resolution of any scheduling conflicts and personnel availability issues, well in advance of inspector arrival onsite.

Please note that any regional initiative, reactive inspections, or additional inspections needed to support new processes or technologies are not included in the schedule and will be added as detailed schedule information becomes available. If circumstances arise which cause the NRC inspectors to change the dates of the planned inspections, we will contact you to discuss the change as early as possible. Please contact Cynthia Taylor (404) 997-4480 with any questions or concerns you may have regarding this letter or the inspection schedule.

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html, and at the NRC Public Document Room, in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Eric C. Michel, Chief Projects Branch 2 Division of Fuel Facility Inspection Docket No. 07001257 License No. SNM-1227

Enclosure:

As stated cc w/ encl: Distribution via LISTSERVJune 27, 2024 Taylor, Cynthia signing on behalf of Michel, Eric on 06/27/24

ML24179A117 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available

OFFICE RII/DFFI RII/DDFI RII/DDFI NAME C. Taylor T. Vukovinsky E. Michel DATE 6/27/2024 6/27/2024 6/27/2024

2025 U.S. NUCLEAR REGULATORY COMMISSION INSPECTION/ACTIVITY PLAN FOR FRAMATOME-RICHLAND

Dates Number of Description/Inspection Procedures (IPs)

Inspectors February 10 - 14 2 Operational Safety 1 (IP 88020)

March 17 - 21 1 Material Control and Accountability Observation (MC&A) (Various IPs)

April 28 - May 2 3 Emergency Preparedness Exercise (88051)

May 12 - 16 3 Nuclear Criticality Safety 1 (IP 88015)

Environmental (IP 88045)

July 7 - 11 3 Plant Modifications Triennial (88072)

August 18 - 22 2 MC&A (Various IPs)

September 8 - 12 2 Operational Safety 2 (IP 88015)

November 17 - 21 2 Nuclear Criticality Safety 2 (IP 88015)

Fire Protection (IP 88055)

Enclosure