VR-SECY-23-0033: Interim Enforcement Policy for Dispositioning 10 CFR Part 37 Violations with Respect to Large Components or Robust Structures Containing Category 1 or Category 2 Quantities of Radioactive Material at Power Reactor Facilitie
ML24170A396
Person / Time
Issue date: 05/15/2023
From: Crowell B
NRC/OCM
To: Carrie Safford
NRC/SECY
Shared Package
ML24170A355 List:
References
SECY-23-0033 VR-SECY23-0033
Download: ML24170A396 (1)


Text

POLICY ISSUE NOTATION VOTE

RESPONSE SHEET

TO: Brooke P. Clark, Secretary

FROM: Commissioner Crowell

SUBJECT:

SECY-23-0033 Interim Enforcement Policy for Dispositioning 10 CFR Part 37 Violations with Respect to Large Components or Robust Structures Containing Category 1 or Category 2 Quantities of Radioactive Material at Power Reactor Facilities

Approved X Disapproved Abstain Not Participating

COMMENTS: Below X Attached None

In March 2014, the staff issued enforcement guidance memorandum (EGM) 2014- 001 for dispositioning violations of 10 CFR Part 37, Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material, for large components and robust structures containing these materials at power reactors. The EGM, which allowed for enforcement discretion under certain conditions, was meant to be temporary, but remained in place for over nine years. The staff is now developing a rulemaking plan to address these and other issues. Until that rulemaking or other regulatory action is completed, t his interim enforcement policy (IEP) would allow continued enforcement discretion and would remove the requirement for dispositioning each violation using an enforcement panel. As noted by the staff, the other benefits of IEPs, which are intended to be in effect longer than EGMs, include approval of the contained enforcement discretion policy by the Commission, enhanced openness, and formal incorporation into the Enforcement Policy. For these reasons, I approve the draft Federal Register notice and the Proposed Interim Enforcement Policy.

Entered in STAR Yes X Signature